ML19323D129
ML19323D129 | |
Person / Time | |
---|---|
Site: | Marble Hill |
Issue date: | 05/05/1980 |
From: | Stello V NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
To: | Ahearne J, Gilinsky V, Kennedy R NRC COMMISSION (OCM) |
Shared Package | |
ML19323D130 | List: |
References | |
NUDOCS 8005210137 | |
Download: ML19323D129 (1) | |
Similar Documents at Marble Hill | |
---|---|
Category:INTERNAL OR EXTERNAL MEMORANDUM
MONTHYEARML20237E7281986-10-0303 October 1986
[Table view]Forwards Wj Dircks 811119 Testimony Before Subcommittee on Energy & Environ in Washington,Dc Re QA for Nuclear Power Plants Under Const,Per Request ML20136F9021985-04-0101 April 1985 Forwards Request for Addl Info for Environ Review of Project Termination,Including Site Plan Showing Areas Disturbed by const-related Activities & Plan for All Structures ML20127C2981984-11-0909 November 1984 Forwards Operability Qualification of Purge & Vent Valves & Guidelines for Demonstration of Operability of Purge & Vent Valves.Info Sought Should Be Provided as Soon as Possible ML20066K6881984-08-22022 August 1984 Discusses Manpower Data Re Prof Regular Hours Expended on CP & OL Applications Currently on File.No Travel Time Included in Computations ML20132B8131984-03-0505 March 1984 Forwards Summary of Legal Guidance on NRC Actions in Event Utils Seek to Withdraw Applications to Construct & to Operate Facilities ML20024B5551983-06-30030 June 1983 Notification of 830711-13 Site Meetings W/Util for Preliminary Discussion of Info Re Environ Review & Site Tour.Proposed Meeting Agenda Encl ML20023B3651983-04-12012 April 1983 Clarifies Branch Responsibilities Re Review of SRP 15.4.6 Concerning Chemical & Vol Control Sys Malfunctions Resulting in Decrease in Boron Concentration in Reactor Coolant ML20079R9081983-03-30030 March 1983 Advises of Util Plans to Construct Primary Emergency Operations Facility (EOF) 1 Mile from Plant & Backup EOF 12 Miles from Plant,Per NUREG-0737,Suppl 1,in Response to 830104 Memo ML20207A5511983-03-28028 March 1983 Advises That Util 830322 Proposed Sys for Matl Traceability for Noncode Applications in Electrical Area Satisfies Requirements of Criterion Viii of 10CFR50,App B.Sys Should Be Documented by Internally Approved Procedure ML20207A5551983-03-22022 March 1983 Describes Util Proposed Sys for Matl Traceability for Use W/Hanger Matls in Electrical Area.Interpretation of App B, Section Viii Requirements Re Noncoded Applications Requested.Response on Acceptability Needed by 830328 ML20028D8671983-01-0404 January 1983 Requests Evaluation & Comments Re Util Concerning Emergency Operations Facility by 830128 ML20028A6971982-11-16016 November 1982 Notification of 821201-03 Meetings W/Util in New Washington, in to Review Const Progress & Obtain Info for Assessing Projected Fuel Load Dates ML20028A3811982-11-0909 November 1982 Forwards Final SALP Input for Oct 1981-Sept 1982.Info Based Primarily Upon Project Manager Input.Util Rated Category I for Licensing Activities ML20028F7911982-07-0808 July 1982 Forwards 1981 Comparison Data for Operating & Const Plants, Consisting of Total Numbers of Noncompliance Items,Repts Issued,Insp Hours,Severity Levels,Points & Hours Per Rept & Item ML20028F7761982-06-0808 June 1982 Forwards Updated Noncompliance History for Const Sites for 1976-81,per Jj Harrison Request.Total Insp Hours for Each Facility Added ML20054E8411982-05-26026 May 1982 Notification of 820603 Meeting W/Util in Bethesda,Md to Discuss Util Request for Exemption from 10CFR50.34(g), Requiring Applicants to Evaluate Differences from SRP ML20041G1171982-03-12012 March 1982 Advises That IE Info Notice 82-06, Failure of Steam Generator Primary Side Manway Closure Studs, Was Sent to Listed Licensees ML20041E5591982-03-0404 March 1982 Advises That IE Info Notice 82-03, Environ Tests of Electrical Terminal Blocks, Was Sent to Listed Licensees ML20041E6061982-02-26026 February 1982 Advises That IE Info Notice 82-01,Revision 1, Auxiliary Feedwater Pump Lockout Resulting from Westinghouse W-2 Switch Circuit Mod, Was Sent to Listed Licensees ML20028F7401982-02-0505 February 1982 Forwards Graphics Summarizing Const Site Noncompliance Data for 1976-80 ML20040D6891982-01-27027 January 1982 Advises That IE Info Notice 82-02, Westinghouse Nbfd Relay Failures in Reactor Protection Sys at Certain Nuclear Power Plants, Was Sent to Listed Addressees ML20041D7181981-12-18018 December 1981 Advises That Although Sargent & Lundy Sequential Sampling Plan Was in Error,Results of Testing Achieved 0.95% Level of Confidence as Stipulated.Despite Procedural Flaw,No Addl Testing Appears Necessary ML20011B2491981-12-0303 December 1981 Advises That IE Info Notice 81-36, Replacement Diaphragms for Robertshaw Valve (Model VC-210), Has Been Sent to Listed Licensees ML20038B8921981-12-0202 December 1981 Advises That IE Info Notice 81-35, Check Valve Failures, Has Been Sent to Listed Licensees ML20032C4721981-11-0505 November 1981 Advises That IE Circular 81-14, MSIV Failures to Close Has Been Sent to Listed Licensees ML20033C7731981-10-0808 October 1981 Advises That IE Info Notice 81-31, Failure of Safety Injection Valves to Operate Against Differential Pressure, Was Sent to Listed Licensees ML20038B2011981-10-0505 October 1981 Informs of Commission Decision That NRC Examine Whether Assurance Achievable from Facility Test & Evaluation Program Meets NRC Criteria Per NRC 810910 Memo & Save the Valley Jul Addendum.Response Requested by 811113 ML20033A7081981-09-28028 September 1981 Advises That IE Info Notice 81-30, Velan Swing Check Valves, Was Sent to Listed Licensees ML20132C8671981-09-0404 September 1981 Forwards Cycle 2 Systematic Assessment of Licensee Performance Info for Jul 1980-Jun 1981 for Facility ML20010D0231981-08-20020 August 1981 Notifies That IE Bulletin 81-02,Suppl 1 Failure of Gate Type Valves to Close Against Differential Pressure, Has Been Sent to Listed Facilities ML20010A6281981-08-10010 August 1981 Advises That IE Info Notice 81-24, Auxiliary Feed Pump Turbine Bearing Failures, Was Forwarded to Listed Licensees ML20010A5321981-08-10010 August 1981 Advises That IE Info Notice 81-23, Fuel Assembly Damaged Due to Improper Positioning of Handling Equipment, Was Forwarded to Listed Licensees ML20009E2221981-07-24024 July 1981 Advises That IE Circular 81-12, Inadequate Periodic Test Procedure of PWR Protection Sys, Was Sent to Listed Licensees ML20009B8561981-07-15015 July 1981 Advises That IE Circular 81-09, Containment Effluent Water That Bypasses Radioactivity Monitor, Was Forwarded to Listed Licensees ML20009B8501981-07-15015 July 1981 Advises That IE Info Notice 81-20, Test Failures of Electrical Penetration Assemblies, Was Forwarded to Listed Licensees ML20009D7311981-07-0606 July 1981 Advises That IE Info Notice 81-19, Lost Parts in Primary Coolant Sys, Was Forwarded to Listed Utils ML20009D8431981-07-0202 July 1981 Advises That IE Circular 81-10, Steam Voiding in RCS During Heat Removal Cooldown, Was Forwarded to Listed Utils ML20010B5781981-06-0404 June 1981 Advises That Commission Has Determined That Save the Valley Petition for Review of Facility Const Be Treated as Petition to Director of IE ML20010B5751981-06-0404 June 1981 Advises That Commission Authorized Secretary to Dispatch Attached Memorandum & Ltr,Revised Per Commission Comments ML20004D3551981-06-0404 June 1981 Forwards Const & Matl Verification Program Final Rept, Revised May 1981,per IE 790815 Order Confirming Suspension of safety-related Const.Submits List for Special Limited Distribution ML20134B0581981-05-0101 May 1981 Forwards SALP Reviews for Facilities ML20132C0681981-05-0101 May 1981 Forwards Project Manager Inputs Required for SALP for Listed Plants.W/O Encl ML20004F3101981-04-10010 April 1981 Advises That IE Bulletin 81-03, Flow Blockage of Cooling Water to Safety Sys Components by Corbicula Sp (Asiatic Clam) and Mytilus Sp (Mussel), Was Sent to Listed Licensees on 810410 ML20004F3291981-04-10010 April 1981 Advises That IE Bulletin 81-02, Failure of Gate Type Valves to Close Against Differential Pressure, Was Sent to Listed Licensees on 810409 ML20134B0191981-01-20020 January 1981 Advises of SALP Board Decision Not to Rate Performance of Licensee Due to Shutdown Under IE Order for 10.5 Months During Evaluation Period.Mgt Meeting Held Onsite on 801209. SALP Evaluation & Plan of Action Encl.W/O Encls ML19340D4931980-12-18018 December 1980 Notification of 810108 Meeting W/Util to Discuss Results of Insps & Addl Testing Performed ML20132B5901980-11-20020 November 1980 Forwards Working File on EDO 09045 Re T Dattilo Request Under 10CFR2.206 ML20132B5951980-11-20020 November 1980 Forwards Working File on Administration of Task 2 Under Parameter,Inc Contract for Consulting Support Re Structural Concrete Deficiencies at Facility.W/O Encl ML20002A8721980-11-0707 November 1980 Informs That Region 3 Has Concluded That Vendors Can Carry Out Receipt Insp Properly.Recommends Resumption of Activities.Draft Ltr Authorizing Activity Encl ML19323D1291980-05-0505 May 1980 Forwards Transcript of 800325 Hearing in Madison,In, Containing Few Omissions & Some Inaccuracies Due to Absence of Prof Court Reporter 1986-10-03 Category:MEMORANDUMS-CORRESPONDENCE MONTHYEARML20237E7281986-10-0303 October 1986
[Table view]Forwards Wj Dircks 811119 Testimony Before Subcommittee on Energy & Environ in Washington,Dc Re QA for Nuclear Power Plants Under Const,Per Request ML20136F9021985-04-0101 April 1985 Forwards Request for Addl Info for Environ Review of Project Termination,Including Site Plan Showing Areas Disturbed by const-related Activities & Plan for All Structures ML20127C2981984-11-0909 November 1984 Forwards Operability Qualification of Purge & Vent Valves & Guidelines for Demonstration of Operability of Purge & Vent Valves.Info Sought Should Be Provided as Soon as Possible ML20066K6881984-08-22022 August 1984 Discusses Manpower Data Re Prof Regular Hours Expended on CP & OL Applications Currently on File.No Travel Time Included in Computations ML20132B8131984-03-0505 March 1984 Forwards Summary of Legal Guidance on NRC Actions in Event Utils Seek to Withdraw Applications to Construct & to Operate Facilities ML20024B5551983-06-30030 June 1983 Notification of 830711-13 Site Meetings W/Util for Preliminary Discussion of Info Re Environ Review & Site Tour.Proposed Meeting Agenda Encl ML20023B3651983-04-12012 April 1983 Clarifies Branch Responsibilities Re Review of SRP 15.4.6 Concerning Chemical & Vol Control Sys Malfunctions Resulting in Decrease in Boron Concentration in Reactor Coolant ML20079R9081983-03-30030 March 1983 Advises of Util Plans to Construct Primary Emergency Operations Facility (EOF) 1 Mile from Plant & Backup EOF 12 Miles from Plant,Per NUREG-0737,Suppl 1,in Response to 830104 Memo ML20207A5511983-03-28028 March 1983 Advises That Util 830322 Proposed Sys for Matl Traceability for Noncode Applications in Electrical Area Satisfies Requirements of Criterion Viii of 10CFR50,App B.Sys Should Be Documented by Internally Approved Procedure ML20207A5551983-03-22022 March 1983 Describes Util Proposed Sys for Matl Traceability for Use W/Hanger Matls in Electrical Area.Interpretation of App B, Section Viii Requirements Re Noncoded Applications Requested.Response on Acceptability Needed by 830328 ML20028D8671983-01-0404 January 1983 Requests Evaluation & Comments Re Util Concerning Emergency Operations Facility by 830128 ML20028A6971982-11-16016 November 1982 Notification of 821201-03 Meetings W/Util in New Washington, in to Review Const Progress & Obtain Info for Assessing Projected Fuel Load Dates ML20028A3811982-11-0909 November 1982 Forwards Final SALP Input for Oct 1981-Sept 1982.Info Based Primarily Upon Project Manager Input.Util Rated Category I for Licensing Activities ML20028F7911982-07-0808 July 1982 Forwards 1981 Comparison Data for Operating & Const Plants, Consisting of Total Numbers of Noncompliance Items,Repts Issued,Insp Hours,Severity Levels,Points & Hours Per Rept & Item ML20028F7761982-06-0808 June 1982 Forwards Updated Noncompliance History for Const Sites for 1976-81,per Jj Harrison Request.Total Insp Hours for Each Facility Added ML20054E8411982-05-26026 May 1982 Notification of 820603 Meeting W/Util in Bethesda,Md to Discuss Util Request for Exemption from 10CFR50.34(g), Requiring Applicants to Evaluate Differences from SRP ML20041G1171982-03-12012 March 1982 Advises That IE Info Notice 82-06, Failure of Steam Generator Primary Side Manway Closure Studs, Was Sent to Listed Licensees ML20041E5591982-03-0404 March 1982 Advises That IE Info Notice 82-03, Environ Tests of Electrical Terminal Blocks, Was Sent to Listed Licensees ML20041E6061982-02-26026 February 1982 Advises That IE Info Notice 82-01,Revision 1, Auxiliary Feedwater Pump Lockout Resulting from Westinghouse W-2 Switch Circuit Mod, Was Sent to Listed Licensees ML20028F7401982-02-0505 February 1982 Forwards Graphics Summarizing Const Site Noncompliance Data for 1976-80 ML20040D6891982-01-27027 January 1982 Advises That IE Info Notice 82-02, Westinghouse Nbfd Relay Failures in Reactor Protection Sys at Certain Nuclear Power Plants, Was Sent to Listed Addressees ML20041D7181981-12-18018 December 1981 Advises That Although Sargent & Lundy Sequential Sampling Plan Was in Error,Results of Testing Achieved 0.95% Level of Confidence as Stipulated.Despite Procedural Flaw,No Addl Testing Appears Necessary ML20011B2491981-12-0303 December 1981 Advises That IE Info Notice 81-36, Replacement Diaphragms for Robertshaw Valve (Model VC-210), Has Been Sent to Listed Licensees ML20038B8921981-12-0202 December 1981 Advises That IE Info Notice 81-35, Check Valve Failures, Has Been Sent to Listed Licensees ML20032C4721981-11-0505 November 1981 Advises That IE Circular 81-14, MSIV Failures to Close Has Been Sent to Listed Licensees ML20033C7731981-10-0808 October 1981 Advises That IE Info Notice 81-31, Failure of Safety Injection Valves to Operate Against Differential Pressure, Was Sent to Listed Licensees ML20038B2011981-10-0505 October 1981 Informs of Commission Decision That NRC Examine Whether Assurance Achievable from Facility Test & Evaluation Program Meets NRC Criteria Per NRC 810910 Memo & Save the Valley Jul Addendum.Response Requested by 811113 ML20033A7081981-09-28028 September 1981 Advises That IE Info Notice 81-30, Velan Swing Check Valves, Was Sent to Listed Licensees ML20132C8671981-09-0404 September 1981 Forwards Cycle 2 Systematic Assessment of Licensee Performance Info for Jul 1980-Jun 1981 for Facility ML20010D0231981-08-20020 August 1981 Notifies That IE Bulletin 81-02,Suppl 1 Failure of Gate Type Valves to Close Against Differential Pressure, Has Been Sent to Listed Facilities ML20010A6281981-08-10010 August 1981 Advises That IE Info Notice 81-24, Auxiliary Feed Pump Turbine Bearing Failures, Was Forwarded to Listed Licensees ML20010A5321981-08-10010 August 1981 Advises That IE Info Notice 81-23, Fuel Assembly Damaged Due to Improper Positioning of Handling Equipment, Was Forwarded to Listed Licensees ML20009E2221981-07-24024 July 1981 Advises That IE Circular 81-12, Inadequate Periodic Test Procedure of PWR Protection Sys, Was Sent to Listed Licensees ML20009B8561981-07-15015 July 1981 Advises That IE Circular 81-09, Containment Effluent Water That Bypasses Radioactivity Monitor, Was Forwarded to Listed Licensees ML20009B8501981-07-15015 July 1981 Advises That IE Info Notice 81-20, Test Failures of Electrical Penetration Assemblies, Was Forwarded to Listed Licensees ML20009D7311981-07-0606 July 1981 Advises That IE Info Notice 81-19, Lost Parts in Primary Coolant Sys, Was Forwarded to Listed Utils ML20009D8431981-07-0202 July 1981 Advises That IE Circular 81-10, Steam Voiding in RCS During Heat Removal Cooldown, Was Forwarded to Listed Utils ML20010B5781981-06-0404 June 1981 Advises That Commission Has Determined That Save the Valley Petition for Review of Facility Const Be Treated as Petition to Director of IE ML20010B5751981-06-0404 June 1981 Advises That Commission Authorized Secretary to Dispatch Attached Memorandum & Ltr,Revised Per Commission Comments ML20004D3551981-06-0404 June 1981 Forwards Const & Matl Verification Program Final Rept, Revised May 1981,per IE 790815 Order Confirming Suspension of safety-related Const.Submits List for Special Limited Distribution ML20134B0581981-05-0101 May 1981 Forwards SALP Reviews for Facilities ML20132C0681981-05-0101 May 1981 Forwards Project Manager Inputs Required for SALP for Listed Plants.W/O Encl ML20004F3101981-04-10010 April 1981 Advises That IE Bulletin 81-03, Flow Blockage of Cooling Water to Safety Sys Components by Corbicula Sp (Asiatic Clam) and Mytilus Sp (Mussel), Was Sent to Listed Licensees on 810410 ML20004F3291981-04-10010 April 1981 Advises That IE Bulletin 81-02, Failure of Gate Type Valves to Close Against Differential Pressure, Was Sent to Listed Licensees on 810409 ML20134B0191981-01-20020 January 1981 Advises of SALP Board Decision Not to Rate Performance of Licensee Due to Shutdown Under IE Order for 10.5 Months During Evaluation Period.Mgt Meeting Held Onsite on 801209. SALP Evaluation & Plan of Action Encl.W/O Encls ML19340D4931980-12-18018 December 1980 Notification of 810108 Meeting W/Util to Discuss Results of Insps & Addl Testing Performed ML20132B5901980-11-20020 November 1980 Forwards Working File on EDO 09045 Re T Dattilo Request Under 10CFR2.206 ML20132B5951980-11-20020 November 1980 Forwards Working File on Administration of Task 2 Under Parameter,Inc Contract for Consulting Support Re Structural Concrete Deficiencies at Facility.W/O Encl ML20002A8721980-11-0707 November 1980 Informs That Region 3 Has Concluded That Vendors Can Carry Out Receipt Insp Properly.Recommends Resumption of Activities.Draft Ltr Authorizing Activity Encl ML19323D1291980-05-0505 May 1980 Forwards Transcript of 800325 Hearing in Madison,In, Containing Few Omissions & Some Inaccuracies Due to Absence of Prof Court Reporter 1986-10-03 |
Text
_
4tD Ktcy
+
o UNITED STATES g
[
j g
NUCLEAR REGULATORY COMMISSION i: E WASHINGTON. D. C. 20555
"%, ~ lf MAY 5 E0 MEMORATOUM FOR: Chairman Ahearne Comissioner Gilinsky Comissioner Kennedy Comissioner Hendrie /
Comissioner Bradford FROM:
Victor Stello, Jr., Director Office of Inspection and Enforcement THRU:
V/WilliamJ.Dircks 75IgneO T. A.Mehm
- Acting Executive Director for Operations
SUBJECT:
TRANSCRIPT OF MARBLE HILL HEARING The enclosed is a transcript of the proceedings of the Marble Hill public rneeting held in Madison, Indiana on March 25, 1980. We had arranged for a court reporter to record the meeting discussions; however, the reporter failed to show up for the meeting. As a result, a tape recorder was used.
Because the audibility of the tapes was complicated by background noise, the transcript contains a few cmissions and may contain some inaccuracies.
Also a portion could not be transcribed because a part of the meeting was inadvertently recorded on the same tape. We believe, however, the transcript reflects the tone of the meeting'and the concerns raised.
~
~
~
' Welave enclosed to the transcript copies of letters received in connection with the meeting. Responses to these letters are in preparation.
. ~
kM V tor Stello,,Jr.
Director Office of Inspection and Enforcement
Enclosures:
1.
Transcript 2.
Letters l
CONTACT:
G. Fiorelli, RIII:IE 8-384-2603 cc: pE GC SECY 8005210
% b:f-