ML19323D120
| ML19323D120 | |
| Person / Time | |
|---|---|
| Site: | 07002478 |
| Issue date: | 04/25/1980 |
| From: | Gillespie F, Moore D, Tobin W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | |
| Shared Package | |
| ML19323D095 | List: |
| References | |
| FOIA-80-298 70-2478-80-02, 70-2478-80-2, NUDOCS 8005210132 | |
| Download: ML19323D120 (1) | |
Text
'
k..
.i.
"--*"'"Tll C '.:. s. j 1, ;.,,,,,,,, ;;
- pn aarog'o UNITED STATES NUCLEAR REGULATORY COMMISSION o
E
.E REGION 11 e
101 MARIETTA sT N.W SUITE 3100 e
ATLANTA, GEORGIA 30303 APR 251980 Report No. 70-2478/80-02 Docket No. 70-2478 License No. ISNM 169&
Licensee: Transnuclear, Inc.
5205 Leesburg Pike Falls Church, VA 20041 Int;pection at: Barnwell, South Carolina Inspection conducted: April 8-9, 1980 Type of I pection: Announced Physical Security stu
/dV/ Gay Inspec ors:~D.T. Moore,' Inspector Ddte $ign d 6
(&4 T
d' W. 3.'T bin, s
tor Dat'e Signed y/M h Approved by:
F. P. Girlespie, A ting Chief, Security Section, Date signed Safeguards Branch Inspection Summary Areas Inspected: The inspection was conducted to assure the licensee is following established procedures and regulatory requirements for physical protection of irradiated fuel in-transit.
The inspection involved 20 inspector hours on site by two NRC inspectors.
Sixteen hours of the inspection were conducted during an offshift period.
Results:
4 No items of noncompliance were identified during this inspection within the areas examined.
S-F2 OO -
SEP Cery_
cf
_ Copies k
P' r.e s
~'rtm'. is not to be c" M? red r'thcut specific arnrevel of IE:II l
I,uT3?li"".':!3']l'E".37iTil 8006210132 CG ;II.:::: 2.70 E!U'..IlaTCN