80051903D N

COM MONWEALTH O F PE"NNCYLVANIA PENNSYLVANIA PUBLIC UTILITY COMMISSION P. O. BOX 3265. HARRISBURG. PA.17120 May 13, 1980 gN ESPLY #bEASE agFEW 70 OUA PlbE William T. Russell Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Washington, DC 20555 Re: NRC Staff testimony

Dear Bill:

This letter supplements that of May 5, 1980 and cevers the two remaining issues we have discussed: problems with the low head safety injection system and Duquesne's NRC compliance history. A copy of this letter will be forwarded to you by telefax.

Additional definitions and questions -- turbine spindle cracking

- stators

- outer disks

- "intergranular" stress corrosion cracking

1) Describe the turbine cracking observed at Yankee-Row on February 15, 1980.
2) Describe the turbine cracking at Shippingport in 1974.
3) Describe the allegations made by anonymous letter referred to by J.P. Knight in a memorandum to S.A. Vargu on January 16, 1980, and the NRC response.

Definitions - low head safety injection system

- ECCS (Emergency core coolin ; system) e

- NPSH (Net positive suction head)

- RS (Recirculation spray)

- NPSH (Net positive suction head)

- LOCA (Loss of coolant accident)

- pressure flash D

- sumo water vapor pressure

. - cold water injection

- pump cavitation

1) What function does the low head safety injection system play during a loss of coolant accident?
2) How does the Stone and Webster LHSI design operate?

2

3) What factors peculiar to the Stone and Webster design result in pump cavitation during a LOCA?
4) Why is pump cavitation undesirable, what causes it and what i

prevents it?

l

5) What fixes are available to cure the LHSI cavitation problem?
6) Which has Duquesne - S/W selected?
7) What remains to be completed at Beaver Valley with regard to the LHSI problem? When will it be completed?
8) Describe " critical paths" analysis.

Is the LHSI problem on the Beaver Valle.y I restart critical path?

9) Describe the LHSI pump shaft alignment problems experienced at Beaver Valley Definitions - Regulatory functions and compliance

- NRC - Office of Nuclear Reactor Regulation

- Quality assurance

- " Defense in Depth"

- NRC inspection functions

- Office of Inspection and Enforcement

- Responsibility of licensee for design and testing

- selective inspections

- Licensee reporting requirements'(LERs, etc.)

- deficiencies, infractions, violations

- abnormal events, reportable occurences, unusual events

1) What is Beaver Valley's inspection history?
2) What is Beaver Valley's enforcement history?

"a a

3) Based upon national experience, what is Beaver Valley's availability record?

Again, if there are additional definitions or questions.you believe ought to be included, please let me know.

I plan to meet with each witness on May 20 at a minimum, and may request telephone conferences before that date, 4

time permitting.

f Very truly yours, l

t i

Q

~---

j.

John A. Levin

-Assistant Counsel 4

f 1

i f

I i

I 1

4 1

t i

J l

1 l

i I

t 1

.-r y

~,

7

.,_y.,,

1