ML19323C822

From kanterella
Jump to navigation Jump to search
Nonproprietary Version of IE Insp Rept 70-0033/80-01 on 800219-22.No Noncompliance Noted.Major Areas Inspected: Inventory Verification.Info Withheld (Ref 10CFR2.790)
ML19323C822
Person / Time
Site: 07000033
Issue date: 03/18/1980
From: Holody D, Joyner J, Roxanne Summers
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML19323C820 List:
References
70-0033-80-01, 70-33-80-1, NUDOCS 8005190256
Download: ML19323C822 (1)


Text

-

U. S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT 8 005190 2.-6b REGION I 1

Report No. 70-33/80-01 Docket No.

70-33 License No.

SNM-23 Safeguards Group 1

Licensee:

Texas Instruments, Incorporated 34 Forest Street Attleboro, Massachusetts 02703 Facility Name:

Texas Instruments, Incorporated Inspection At:

Attleboro, Massachusetts Inspection Conducted:

February 19-22, 1980 Date of Last Material Control and Accounting Inspection: October 17-19, 1979 Type of Inspection: Unannounced Material Control & Accounting Inspectors:

[ b,, w s / M 3-/g-so R. Sumers, Audftof date

~

Y-h Y

'3-12 80 D. Holody,/ 5tatistitian date date Approved by:

)d~

U 3-/s.go

. H~ Joyner, p)ieft Nuclear Materials Control date port Secti%, Safeguards Branch Inspection Summary:

Areas Inspected:

Inventory Verification.

The inspection involved 53 inspector hours onsite by two regional based NRC inspectors and was begun during the regular hours.

Results: The licensee was found to be in compliance with NRC requirements in the area inspected.

Region I Form 166 (August 1979)