ML19323C616

From kanterella
Jump to navigation Jump to search
Forwards LER 80-036/03L-0
Date released: 12/03/2019 Download: ML19323C616


LER 80-036/03L-0:on 800407,during High Flux Trip on Reactor, Initiated by Reactor Protection Sys,Channel 2 Trip Module Was Declared Inoperable Due to Failure to Reflect Signal from Channel 3. Caused by Trip Relay K1 Component Failure
ML19323C621
Person / Time
Site: Davis Besse 
Issue date: 05/06/1980
From: Werner B
TOLEDO EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19323C621 (2)
Forwards LER 80-036/03L-0
ML19323C615
Person / Time
Site: Davis Besse 
Issue date: 05/06/1980
From: Murray T
TOLEDO EDISON CO.
To: KEPPLER J G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19323C615 (2)