VERMONT YANKEE NUCLEAR POWER STATION MONTHLY STATISTICAL REPORT 80-04 FOR THE MONTH OF APRIL, 1980
~
~
OPERATING DATA REPORT DOCKET NO. 50-271 DATE 800412 CO31PLETED BY F. C.
Beers 4
TELEPHONE 617-166 0011 X2215 e
OPERATING STATUS Vermont Yankee Notes
- Time change during
- 1. Unit Name:
April 1980 report period.
- 2. Reportin2 Period:
1593
- 3. Licensed Therms! Power (31Wt):
540
- 4. Nameplate Ratin3 (Gross SIWE):
514 (ooen) 504 (closed )
s
- 5. Design Electrics! Rating (Net SIWE):
535'
- 6. 51sximum Dependsble Capscity (Gross 31We):
504
- 7. 5!aximum Dependable Capacity (Net alWe):
- 8. If Changes Ocet' 'n Cspacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
- 9. Power Level To which Restricted.If Any (Net 31We):
- 10. Reasons For Restrictions.If Any:
~
_ ~
This 51onth
.Yr.. o.Dste
' Cumulative 719*
2.903.00
- 11. Hours in Reportin: Period
- 12. Number Of Hours Resctor Was Critical 701.13 2.757.43 53.915'.82 0.0 0,0 0.0
- 13. Resctor Reserve Shutdown Hours
- 14. Hours Generator On.Line 682.50 2.714.60 52.042.38 IS. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (31WH) 1.09R.111.90
& 1AA ?aR nn -72 ton RA1.00
- 17. Gross Electrics! Ener;y Generated (51WH) 362.493.QQ.
1.427.731.00
?a.197.403.00 18' Net E!ectrical Ener;y Generated (>!WH) 347.724.00 1.370.163.00 23.138.528.00 94.92 93.51 78.03
- 19. Unit Service Factor 94.92 93.51 78.03
- 20. Unit Availability Factor 95.96 93.65 68.83
- 21. Unit Capacity Factor (Using SIDC Net) 94.09 91.83 67.49
- 22. Unit Capacity Factor (Using DER Net) 0.0
.98 6.24
- 23. Unit Forced Outage ' ate R
- 24. Shutdowns Scheduled Over Ne'xt 6 Stonths (Type. Date snd Durstion of Each1:
f
~
\\
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:'_
..26. Units in Test Status (Prior :o Commercial Operation):
Forecast Achieved
~
INITIA L CRIT.CALITY INITIA L ELECTRICITY CO.\\l31ERCIAL OPERATION-l
'(Q/77)
L
AVERAGE DA!LY UNIT POWER LEVEL DOCKET NO.
50-271 UNIT Vermont Yankee DATE 800412 C051PLETED BY F-C.
Beers TELEPHONE 617-366-9011 X2215 Af0 NTH April 1980 DAY AVERACE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (51We-Net)
(51We Net!
I n
17 525 2
140 gg 524 3
411 39 524 42d 4
20 513 5
511 21 525 6
524 22 522 7
523 23 522 515 8
523
~
9 487 25 524 10 523 26 524 11 524 27 495 525 12 23 524 13 519 29 523 524 34 30 524 13 524 31 16 525 INSTRUCTIONS On this format. list the average daily uriit power level in 5!We Net for each day in the reporting month. Compute to the nearest whole me;swatt.
~
(9/77)
,,.e
DOCYIT NO.
50-271 UNIT Vermont Yankee DATE 800412 C0!1PLETED BY F. C. Beers TELEP110NE 617-366-9011 X2215 SAFETY llELATED flAINTENANCE APRIL 1980 flATURii OF LER 011 UUfAGE flALFUNCTION EQUIP!IENT llAINTl! NANCE NUtlBER CAUSli RESULT C0llitECTIVli AClION "A" Recirculation Loop Corrective N/A Defective parts Output oscillating Replaced transmitter Flow Transmitter 2-110A MR 80-161 IIPCI Flow Controller Corrective LER Defective parts No output Replaced controller FIC 23-108 MR 80-351 80-13/3L IRM 7-41D Corrective N/A Defective parts liigh noise output Replaced parts and cleaned MR 80-372 Recirculation Loop Corrective LER Motor Operator Valve inoperable Repaired motor operator Discharge Valve V2-53B MR 80-376 80-15/3L defective UPS "B" Corrective N/A Failed LED Blown fuse indication Replaced LED MR 80-441 lost PCIS Valve FS0-109-76B Corrective LER Dirt Valve would not shu ; Disassembled and cleaned MR 80-461 80-17/3L valve UPS "A" Corrective LER Set point drift AC output frequency Adjusted output frequency MR 80-482 80-14/3L drifting
DOCKET NO.
50-271 UNITSilUIDOWNS AND POWER REDUCTIONS UNIT NAhlE Vermont Yankee DATE u00412 COMPLET ED lay F.
- c. Beers REPORT MONTil April 1980 ELLPil0NE 617-366-9011 X2: LS "i
.$E
}
8k Licensee E't,
t Cause & Corrective No.
Date g
ij g
,3 g 5 Event g,y si Atiionin H
$E 5
Ji d c Report #
in v gu Prevent Itecuuence f
.u o
80-9 800401 S
36.5 B
1 N/A IIP VA, LEX Main steam valve which isolates the (cont. )
steam supply to the main turbine steam seal regulator was leaking steam to the atmosphere. Valve was replaced with piping.
80-10 800420 S
0 11
'4 N/A RA CONROD Turbine surveillance & control rod (Powe r adj us tment.
1:eductic n) 80-11 800427 S
0 11 4
N/A RA CONROD Turbine surveillance & control rod (Power adj us tment.
1:eductic n)
I 2
3 4
F: Foss ed Iteasun:
Method:
Exhibit C. Instructions S: Schednied A rquipment Failure (Explain) 1 Mannat for Picpar.iiion of Data
[141aintenance nr Test 7 Manual Scram.
Entry Shecis for 1.ieensee C.ltcIncling 3 Antomatic Scram.
Event Iteport (LI!R) File INUltEG-1).Itegulatoiy Restriction 4-Other (Explain) 0161)
E Opciator Tsaining & License Examination F Aitminiusative S
G Operational I isor (lixplain)
Exhihis I. Same Sonsce 08/17)
Il Othes (Explain)
DOCKET NO.
50-271 UNIT Vermont Yankee DATE 800412 CO:4PLETED BY F.
- c. Beers TELEPHONE 617-366-9011 X2215 REPORT MONTH APRTT 1980 SU:-BIARY OF OPEPATING EXPERIENCES Highlights Vermont Yankee operated at 92.2% of rated thermal power for the month. Gross electrical generation was 362,493 MWH, or 93.2% of design electrical capacity.
Ooerating Summary The following is a chronological description of plant operations including other pertinent items of interest for the month:
4/1/80 At the beginning of the reporting period the plant was shutdown.
4/1/80 At 1650 hrs. a startup was commenced.
The reactor was critical at 1752 hrs.
4/2/80 At 1222 hrs. the turbine was phased onto the grid.
4/20/80 At 0100 hrs. power was reduced for Surveillance Testing and control rod adjustment.
4/27/80 At 0100 hrs. power was reduced for Surveillance Testing and control rod adjustment.
4/30/80 At the end of the reporting period the plant was at 99.9% rated thermal poaer.