ML19323C469
| ML19323C469 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 04/29/1980 |
| From: | Clayton F ALABAMA POWER CO. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| IEB-79-01, IEB-79-1, NUDOCS 8005150572 | |
| Download: ML19323C469 (1) | |
Text
__
8005150 672__
7e e o A ea a pae cc m
???Te'L?a*l
- u so-MF B.rming*am. A'atuma 35291 Te'epe re 205 323-534 f r
k n
Lb'MS"i AlabamaPower
"**Ql the southem e ectrc syvem r
April 29,I 1980 NRC IE Bulletin No. 79.01B Docket No. 50-348 Mr. James P. O'Reilly, Director U. S. Nuclear Regulatory Commission Region II Suite 3100 101 Marietta Street N. W.
"..lsnta, Georgia 30303
Dear Mr. O'Reilly:
In accordance with the requirements of IE Bulletin 79.01B, Environmental Qualification of Electrical Equipment, dated January 17, r
I 1980, Alabama Power Company submits the attached response for Items 1, 2, and 3 for Farley Nuclear Plant Unit 1.
If you have any questions, please advise.
Yours very t uly,
,, gi h
h F. L. Clayton, Jr.
SWORN TO AND SUBSCRIBED BEFORE ME IIS 36 DAY OF
, 1980.
f A
Fot ary fublic (/
~
My Commission Expires:
5n kk
=
TLC /de Attachment f
cc:
Mr. R. A. Thomas Mr. G. F. Trowbridge (w/ attachment)
- . VI U Y C'.h I
Office of I & E, Div. of Reactor Operations Inspection Washington, D. C.
20555
.