ML19323C403

From kanterella
Jump to navigation Jump to search
Submits Licensing Amend Fee Determination for 800506 Change Request Re Safety Injection Actuation & Power Distribution Limits
ML19323C403
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 05/06/1980
From:
NORTHERN STATES POWER CO.
To:
Office of Nuclear Reactor Regulation
References
NUDOCS 8005150480
Download: ML19323C403 (1)


Text

+Yd 80051 50 To:

Dircctor cf Nucloor R :ctor Regulction Dator Mav 6. 1980 U S Nuclocr Regulatory Commiccion hy Washington, DC 20555 Licensing Fee Determination Fee Type:

Facility License Amendment X Reqbtred Approval Materials License Application Materials License Renewal Other (Description

)

Licensee:

Northern States Power Company; Minneapolis, MN 55401 Plant:

Prairie Island Nuclear Generating Plant Docket No. 50- 282 License No. DPR-42 Materials License No.

50- 306 DPR-60 Date and subject of Licensing Request: May 6, 1980 May 6, 1980 Safety Iniection Actuation and Power Distribution Limits License Amendment or Approval Class:

I Fee: 400 x 3 1200.00

=

Class:

TT Fee: 1200 y 1 1200.00

=

i;uxxxAuxsAxmamadAKnamuA TTT Fee: 4000 x 2 8000.00

=

Total Fea Enclosed:

10400.00 Basis for determination of fee class.

There are two Class III issues for which accepts.bility for the issue has been defined by the NRC. These two issues are : (1) Rod bow penalties on hot channel factors, and (2) exposure dependt nce of F limits. The NRC has allowed elimination of the rod bow penalty on F q for Westinghouse fuel and stated that Exxon should submit a topical repork on rod bow, that 3

has previously been done, to support elimination of the rod bow penalty on

.F fcr the Exxon fuel. Exposure dependence of the ? limit for ENC fuel 0

hds been applied in the case of other plants, e.g.

Cook.

The administrative changes in section 3.5 and 3.10 are Class II issues.

Since there are three types of issues (i.e. 2 Class III and 1 Class II) that are applicable to both units there are 3 Class I amendments.

The administrative ch: ages in section 3.10 involve the SI actuation scheme, PDC 2 for tdtich amendments had been submitted before and these changes are consistent with connitments made at the time of those amendment requests.

3 Other administrative changes include minor wording corrections in the 3.10 limiting conditions for operation and bases.

s v

[

8

.=

M Prepared by:

Nuclear Support Services Department j

Northern States Power Company 414 Nicollet Mall - 8th Floor Minneapolis, MN 55401 (612) 330-6763 cc:

NSS File