ML19323C284

From kanterella
Jump to navigation Jump to search
PNS-IV-80-006:on 800414,S&W Received Call from Male Voice Threatening to Blow Up Facility.Workers Were Permitted to Leave Site W/O Pay.Util Indicated Call Was Possible Result of Labor Dispute.Search Was Conducted W/No Results
ML19323C284
Person / Time
Site: River Bend  Entergy icon.png
Issue date: 04/14/1980
From: Crossman W, Oberg C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
References
PNS-IV-80-006, NUDOCS 8005150263
Download: ML19323C284 (1)


Text

_

8 00515 0.2M D"*D w

O(L b

-= PRELIMINARI NOIIFICATION l

V i

April 14, 1960 i

PRELIMINARI NOTIFICATION OF SAFECUARDS EVENT -PNS-IV-80-06 l

This pra14=4 nary notif 4 a=rion constitutes EARLY notica 'of event.s of POSSIBLE natiaa=1 security or public ' interest si_enf *1canca.'

The information presented is as init4=11v received without verification or evaluation and 'is basically all that is known by IE staff as of this data.

FACILITY: River Band Station, Units 1 & 2 Gulf States Ut414 t4==

(GSU)

..DN 50-458;.50 459,'

SUEJECI:

33fB'2HREAT At apprmrimately 7:08 a.m. on April 14, 1980, the Stone and Webster. switchboard operator received-a telephone call from a mala sp==1r4a* in a.cala voica, "We plantad a bunch of bombs out there and we are going to blow your... up."

He then hung up.

There was no background noi % Workers were permitted to leave the site without pay. GSU indicated the call was a possible result of a local labor jurisdictional disputa. A search of the site was made with no results.

The licensee notified the local law enforcement, state police officials and the TBI.

RIV notified the ATF, the IAT, and the of fice of Ccamissioner Kennedy by telephone on April 14, 1980.

~~

No press relemaa was made or planned by the 11cana.ee or NRC.

The site' construction progress is approximately 12%. There is no SNM on site.

The Pra14m4n=ry Notification is issued for information only and no further action by IE is anticipated.

Region IV, Arlington, Texas, received notifi-cation of this occurrence by telaphone from the GSU Construction Manager at approximately 8:15 a.m. on April 14, 1980.

Contact:

C. R. Oberg, RIV 334-2411; W. A. Crossman, RIV 334-2411 Distribution:

Transmittad H St.

Chairman Ahearna Commissioner Hendrie S. J. Chilk, SECT Commissioner Gilinsky Commissioner Btsdford C. C. Kammerer, CA Commissioner Kannedy ACES (For Distribution)

Iransmittad: MNBB P. Bldg.

IE:IDOS '

(IE:BQ Dist.

W. J. Dircks, EDO H. R. Denton C. Michalson, EDO R. C. DeYoung, NER SS Bldg.

J. J. Fouchard, PA R. J. Mattson, NRR J. G. Davis, NHSS N. M. Haller, NPA D. vassallo, NRR S. Levina, RES R. G. Ryan, OSP D. Eisenhut, NRR H. K. Shapar, ELD J. J. (%=mi n gs, CIA (MAIL)

R. Minogua, SD IE:XOOS RI RII RIII RV PRET WMGY NOIIFICATION

,,,...-...n.

~ -,,, -

---