Text
_
80051 50 /M 8(
o UNITED STATES g
y g
NUCLEAR REGULATORY COMMISSION g
,e REGION 11
%*****((
0, 101 MARIETTA sT N.W., SUITE 3100 ATLANTA, G EORGIA 30303 M A9 '21 1980 Report No. 70-2479/80-04 Docket No. 70-2479 License No. ISNM-1699 Licensee: Transnuclear, Incorporated 5205 Leesburg Pike Falls Church, Virginia 10601 Facility Name:
Irradiated Fuel Shipment Inspection at: Savannah River Plant, Aiken, South Carolina Inspection conducted: March 10, 1980 Date of Last Physical Security Inspection Visit: March 5-6, 1980 Type of Inspection: Announced Physical Security Inspector: [M dMN 3
K. H. Bes er, Ph sic. Security Inspector bate
/
WM YJ/((C' Approved by:
a F.'P. Gillespie, Acting' Chief Date Security and Investion Section, Safeguards Branch Inspection Summary Areas Inspected: There was no actual inspection conducted, although the inspector had been informed of the shipment's arrival at destination as between 2330 hours0.027 days <br />0.647 hours <br />0.00385 weeks <br />8.86565e-4 months <br /> March 10 and 0100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br /> March 11, 1980 and was on site at 2310 hours0.0267 days <br />0.642 hours <br />0.00382 weeks <br />8.78955e-4 months <br />, the shipment arrived at 2240 hours0.0259 days <br />0.622 hours <br />0.0037 weeks <br />8.5232e-4 months <br />.
The inspection involved 9 inspector hours on site by 1 NRC inspector. The inspection was begun during ar. offshift period; 9 inspection hours were accom-plished during offshift periods.
\\
e
DETAILS 1.
Persons Contacted
- W. J. Stoneburner, Jr., Traffic Coordinator, Transnuclear, Inc.
L. L. Herring, Savannah River Plant 2.
Exit Interview No exit meeting was held.
===3.
Background===
In accordance with the requirements of 10CFR 73.72 and Import License 1699, license condition five, Region II received notification by letter dated February 20, 1980, of a spent fuel shipment.
The licensee advised that two Goslar casks each with thirteen (13) irradiated fuel elements would be shipped by road from the Portsmouth Maine Terminal, Portsmouth, Virginia to the US Department of Energy, Savannah River Plant, Aiken, South Carolina.
4.
Scope Coordination with the Home Transportation Company dispatcher in Aiken, South Carolina on March 10, 1980 at approximately 1830 hours0.0212 days <br />0.508 hours <br />0.00303 weeks <br />6.96315e-4 months <br /> revealed that the shipment was due to arrive at the entrance to the Savannah River Plant (Barricade No. 4) between 2330 hours0.027 days <br />0.647 hours <br />0.00385 weeks <br />8.86565e-4 months <br /> on March 10 and 0100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br /> on March 11, 1980.
The inspector arrived at Barricade No. 4 at 2310 hours0.0267 days <br />0.642 hours <br />0.00382 weeks <br />8.78955e-4 months <br /> on ' larch 10, 1980 r
and was informed by the guard at the gate that the subject shipment had arrived at approximately 2240 hours0.0259 days <br />0.622 hours <br />0.0037 weeks <br />8.5232e-4 months <br /> on March 10, 1980. The inspector confirmed at 2317 hours0.0268 days <br />0.644 hours <br />0.00383 weeks <br />8.816185e-4 months <br /> on March 10, 1980 with L. L. Herring of the Savannah River Plant that the shipment was being unloaded.
l
.