MAY 2 1980 MEMORANDlM FOR:
W. T. Crow, Section Leader Uranium Pmcess Licensing Section Uranium Fuel Licensing Branch FROM:
Norman Ketzlach Uranium Fuel Licensing Branch
SUBJECT:
TRIP REPORT Purpose Visit licensee's facility to discuss the SNM-23 license renewal application of Texas Instruments, Inc. (TI) ane participate with IE on the inspection of the facility.
Place and Date TI facility in Attleboro, Massachusetts, April 21-25, 1980.
Attendees Texas Instruments, Inc. --
F. L. Sherman, Manager, HFIR Project R. J. Schwensfeir, Jr., Manager, fluclear Safety J. T. Thomas Nuclear Criticality Safety Consultant d
U.S. Nuclear Regulatory Commission --
N. Ketzlach, NfGS W. W. Kinney, IE Region I Discussion Discussions were held on the fiRC preliminary comments related to the TI i
renewal application. TI personnel have an understanding how they will develop the responses to the NRC commnts. A major revision is required to the nuclear criticality safety limits and their justification. Modifications to their OFFtCE >
SURNAME >
DATE,>
W. T. Crow 2
MAY ~ 21980 radiation safety program and inspection and audit programs associated with both radiological and nuclear criticality safety are required.
There has been a major change in the TI organization related to their SNM
... l 3
license since the renewal application was submitted.
HFIR manufacturing personn61 now report to a manufacturing superintendent instead of to the Manager, HFIR Project. Both the HFIR Project Manager and the Manufacturing Superintendent are on the same level in the organization. A new Manager, Nuclear Safety (NS) and Nuclear Materials (NM) has been appointed and has been on board approximately six months. The fonner Manager, NS and NM, and the Health Physics Officer have left TI. The latter has not yet been replaced.
Because of their staffing and scheduling situation, TI management stated they.
could not meet the " Gold Book" schedule of June 20, 1980, but agreed to sub-mit their response before August 22, 1980.
- N. Ketzlach participated with W. W. Kinney on his routine inspection of the TI facility and operations related to the SNH-23 license. The inspection
~
.s included compliance with IE Bulletin No..79-19, " Packaging of low-Level Waste for Transport and Burial," dated August 10, 1979, the TI Organization, the e
Nuclear Criticality Safety Program, and the internal review and audit programs
'. !.?
for both nuclear criticality and radiation safety.
W. Kinney will issue a 4
separate report on the inspection.
M 1.
Prior to departure, N. Ketzlach and W. W. Kinney met with F. L. Sherman, R. J. Schwensfeir, Jr. and W. Goetz, Manufacturing Manager, Metal Systems 5
Department. The latter is the supervisor of the HFIR Project Manager and
'l the Manufactur.ing superintendent. The meeting sunrnary was discussed
.j Conclusions The site visit, participation in an IE inspection of the facility, 'and
~
~
discussion of the NRC preliminary comments on the SNM license renewal appli-9 cation gave the NRC a better understanding of current operations at TI and j
should, in the long run, expedite the review of the renewal application. TI T
should be able to meet their agreed-to response date to the NRC conunents.
~
4.
Original Signed'by:
- j Norman Ketzlach Uranium Fuel Licensing Branch w
Distribution:
Division of Fuel Cycle and m"
Docket File 70-33 IE HQ (2)
Material Safety y
NMSS r/f RGPage e
FCUF r/f FDFisher A. Soong q
D
.NKetzlach (2) p g
R
,.E.R E S.
,,EC.V.E,..
' d i
er.c
- l NKe ea h j,vah LTyso n[,,,,,,,
5/v89....
5/g/80 N.C PotJf 318 (9-76) NEOt 02C l't u * *
- v r a a" = "?
- a 'a7* o m e " 8 ' ' ' ' * " ' ' " '
- - - -