ML19323B968
| ML19323B968 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 05/21/1979 |
| From: | Engelken R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Grier B NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| References | |
| TASK-TF, TASK-TMR NUDOCS 8005140466 | |
| Download: ML19323B968 (1) | |
Text
/
.. k.,..[..
80051404%/,
\\
IJNITIED STATES S
^ g/
g Q, /
.!UCl. EAR REGULATORY CCMMISSION
(: a p.
i j;h
[
%90 N. CALIFO ANIA BOULEVARD 7
SulT E 202. './ALNUT CRE EK PLAZA w
g
+
.yJ,,, 9*g
V.*ALf!UT CR EEK, CALIFORfJf A 94596
.)
I
~
May 21, 1979 MEMORANDUM FOR:
B. H. Grier, Director, Region I FRCM:
R. H. Engelken, Director, Region V H
SUBJECT:
REPORT OF ACTIVITIES AT THREE MILE ISLAND m
Q The following brief report of my activities at Three Mile Island during the period April 23 to April 30, 1979, is made in accordance with your r
request dated April 9, 1979.
r I
I arrived at the Three Mile Island site at approximately 9:00 p.m. on April 23, 1979, and left the site about 8:00 a.m. on April 30, 1979.
During this period, I
[
was assigned as the principal NRC representative on duty during the night shift.
Typically, I.,culd relieve Mr. Stello er Mr. Vollmer at about 10:00 p.m. until they returned to the site again the following morning at about 7:00 or 8:00.
L r!
During my brief tour of duty, NRC activities at the site were heavily' dominated r
by NRR and it was not clear to me precisely what my authority or respontibilities were except that I assumed I was responsible for all NRC activities in7he event of an emergency during the night shift.
I followed licensee activities and plant operating parameters through routine hourly reports from the Unit 2 Control Room and from the IE trailer.
I was responsible for the preparation of the daily report and the daily drafts of the preliminary notificationfsupplements (PNs).
ti My overall reaction to the assignment was one of discomfort, apprehension, and concern. My principal concerns related to what appeared to be an undefined sharing of responsibility for plant operations between NRC and the licensee, and the lack of definifion as to my responsibility and authority under the emergency mode of operations.
This arrangement, apparently in effect since early after NRC arrived at the site in force, conflicted rather sharply within NRC's longstanding philosophy of operations, i.e., that the licensee has the primary responsibility for the safety of operations and the NRC assures that the licensee is meeting that responsibility. The emergency mode of operations and its lack of definition of how responsibility and authority were to be shared during that emergency mode, left it pretty much to the man in charge to decide for himself just what his authority and responsibility were.
While this may have been unavoidable during the early NRC response to the incident, I felt.that by the time that I arrived at the i _.
site there should have been better definition of how the NRC was to interface with the licensee during recovery operations.
2 e
..' 1Y
,r.
- ~ ~ - -
1
- .1
'.~
5 i
y,
- e il B. H. Grier
-2
~
?
!;ay 21, 1979 I believe that this ad hoc reorganization of. responsibility and authority could result in a otentially hazardous situation.
fWfn R. H. Engelken Director cc:
J. G. Davis, IE:HQ s
J. P. O'Reilly, RII J. G. Keppler, RIII g
K. V. Seyfrit, RIV g
R p
H I
f e
l' e
l I,
?.
v-s.,
ft hn;..
p.e f
i s
l
.I k AA.
w.
. ~ -
,=
k 5-I t
I
{?:.
- e i
hi p?-
n
}
ir_
f
]