IE Insp Repts 50-546/80-06 & 50-547/80-06 on 800206-08 & 12-15.Noncompliance Noted:Conflict Between Design Spec Requirements & PSAR Commitments
ML19323B727
Person / Time
Site: Braidwood, Marble Hill  
Issue date: 02/27/1980
From: Hawkins F, Hayes D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML19323B715 List:
References
50-546-80-06, 50-546-80-6, 50-547-80-06, 50-547-80-6, NUDOCS 8005140143
Download: ML19323B727 (1)


See also: IR 05000546/1980006

Text

b

0514 g

.

g

U.S. NUCLEAR REGULATORY COMMISSION

-

OFFICE OF INSPECTION AND ENFORCEMENT

r

REGION III

-

Report Nos. 50-546/80-06; 50-547/80-06

Docket Nos. 50-546; 50-547

License Nos. CPPR-170; CPPR-171

Licensee: Public Service of Indiana

1000 East Main Street

Plainfield, IN 46168

Facility Name: Marble Hill Generating Station, Units 1 and 2

Inspection At: Marb e Hill Site, Jefferson County, IN

Inspection Conducted: February 6-8 and 12-15, 1980

k-

F'Q . wkins

.C

3 /24, / BO

Inspector:

I

I

,

Approved By:

. W. H es,

e

27

Engineering Support Section 1

7

'

Inspection Summary

Inspection on February 6-8 and 12-15, 1980 (Report Nos. 50-546/80-06;

50-547/80-On

Areas Inspec. *: Follow-up on a previously identified inspection finding;

review of implementing procedures, observation of work, and review of

quality records for the Construction Verification Program (SPP-5); review

of implementing procedures and review of quality records for safety-related

backfill; review of licensee conformance to PSAR commitments. This in-

spection involved a total of 55 inspector-hours onsite by one NRC inspector.

Results: Of the three areas inspected, one apparent item of noncompliance

was identified in one area.

(Infraction - conflict between design specifi-

cation requirements and PSAR commitments - Section 3).

.

l

!

i

l

.. ,,_-.

..--..__ _

. . . _ .

- - . , . _ . _

.

_

_ _

.

DETAILS

.

Persons Contacted

--

Public Service of Indiana (PSI)

  • T. R. Burns, Project Engineering Manager
  • N. Reichel, Acting Construction Manager
  • R. E. Turner, Quality Assurance Manager
  • J. Norris, Manager - Quality Engineering

S. Farlow, Special Projects Engineering Supervisor

  • L. A. Nicodemus, Supervisor - Program Support
  • D. B. Ingmire, Quality Assurance Superintendent - Civil
  • G. T. Warner, Quality Assurance Engineer
  • I. J. Lefman, Quality Assurance Audit Coordinator

D. L. Shuter, Quality Assurance Engineer

R. Royer, Reactor Building Area Engineer

I

D. Blackwell, Reactor Building Area Engineer

W. Minick, Quality Control Inspector

M. Bright, Quality Control Inspector

G. K. Newberg Construction Company (N-MH)

C. E. Guy, Quality Assurance Supervisor

J. M. Coffman, Quality Control Supervisor

J. Spann, Quality Control Inspector

R. Alcorn, Quality Control Inspector

J. Olson, Quality Control Inspector

J. Mull,igan, Quality Control Inspector

M. Rose, Quality Control Inspector

United States Testing Company (UST)

D. Lanham, Site Project Manager

Other Personnel

  • J.

E. Foster, RIII NRC Investigation Specialist

  • J. J. Harrison, RIII NRC Resident Inspector

i

K. Seeber, Sargent and Lundy Site Structural Engineer

  • Denotes those attending the exit interviews.

Licensee Actions on Previous Inspection Findings

(Open) Noncompliance (546/79-18-01; 547/79-18-01):

a.

The loading rate applied to two compressive strength concrete cylin-

ders was observed to exceed the 20-50 psi loading rate specified in

ASTM C39.

-2-

_. - _ _ _ . _ . . . _ _ _

__-

. _ ,

.-

, , . .

.

The two compressive strength specimens which were incorrectly loaded

.

were the 28 day breaks for Cylinder No. 2360. These cylinders rep-

resented concrete placements which were not safety related. To as-

sure that the proper loading rate is applied when tasting safety

.

related compressive strength cylinders, UST has instructed tiechnicians

breaking cylinders to verify the rate of load a minimum of twice a

day, for a minimum of ten second intervals. This verification is to

be documented in the ' Remarks' section of the break sheet for the

cylinder tested.

.

The RIII inspector verified on February 12, 1980 that the loading

rate for two cylinders was checked and properly documented during

the in process compressive strength testing. The identification

and proper disposition of this item on UST ICAR 1036-53 was also

noted.

Item a. is closed,

b.

Several instances were noted in which the sample fraction retained

on an 8-inch diameter sieve at the completion of the sieving opera-

tion exceeded the maximum of 200g allowed by ASTM C136.

The RIII inspector reviewed the records of the August 27, 1979

training session which was held to instruct laboratory persoanel

of the proper method to reduce samples and perform a sieve analysis

in accordance with ASTM C136.

In addition, all gradation reports

were reviewed and a list of those individual sieves which were

found to rete a more than the allowed 200g was forwarded to the

design control group for engineering disposition. The results of

the engineering evaluation concluded that the values reported would

not adversely affect the test results. The identification and proper

disposition of this item on UST ICAR 1036-54 was verified by the RIII

inspector.

Item b. is closed.

c.

The specific gravity of the heavy liquid (zine chloride) used to per-

'

form the Test for Lightweight Pieces in Aggregate was not monitored

during the test with a calibrated hydrometer to verify that it re-

mained within 0.01 of the specified value at all times as required

by ASTM C123.

See item d. below for the licensee's resolution and actions to pre-

vent recurrence.

d.

The specific gravity of the heavy liquid (zinc chloride) used to

perform the Test for Lightweight Pieces in Aggregate was not con-

firmed to be 2.0 as specified by ASTM C33 for the coal and lignite

test.

Following the identification of items c. and d., UST:

t

l

l

-3-

I

!

,

t.

. . . , _ -

.7,.,._-..,,,,._--,..-...,...

-.

. . .

.

.

1

1

(1) forwarded hydrometer No. 457.0 to the manufacturer for calibra-

.

tion. The satisfactory results of this calibration were reviewed

by the RIII inspector as documented in the manufacturer's

Report of Calibration.

s

_.

.

(2) revised form QCP-2.6 (10/79) to include the requirement to

check the specific gravity of the heavy liquid before, during,

and after the test is performed.

(3) conducted a training session on September 28, 1979 to instruct

the responsible laboratory technicians of the proper method

to perform the test for lightweight pieces in accordance with

ASTM C123.

(4) obtained a satisfactory engineering disposition from the design

control group concerning the improper test method's impact on

previous work.

The proper identification and disposition of these conditions on

PSI DCR Nos. C-070-79, C-073-79, and UST ICAR No. 1036-57 were

verified.

Items c. and d. are closed.

e.

The 2" grout cube molds were not properly pre-treated prior to use

with a mixture of three parts of paraffin to five parts rosin as

required by ASTM C109.

This item was satisfactorily addressed by the licensee and the

results documented in IE Report 546/79-18; 547/79-18.

Item e. is closed.

f.

Field cast 2" grout cubes were not being initially cured in accord-

ance with ASTM C109, Section 8.5 as referenced by S&L Specification

Y-2850, Section 411A.1.

This item was satisfactorily addressed by the licensee and the results

documented in IE Report 546/79-18; 547/79-18.

Item f. is closed.

'

g.

Four occassions in which UST Level II personnel were evaluated for

certification by other UST Level ~II personnel.

In response, the certification records for all Level II personnel

were reviewed to verify compliance with the certification require-

ments specified in UST Procedure No. UST-TQ-1, Revision 9.

The

Proficiency Evaluation Records of the four Level II personnel in

question were subsequently co-signed by the responsible Level III

inspector. This signature was based on a detailed evaluation of

each technician's qualifications and observed work performance by

the responsible Level III.

_4_

-.. .

. . . . . . . , - _ . - . . -

- - -

--

.

_

_

. __-_

- - -

- -__ _ _ _ _ _ .

.

This noncompliance was determined to be a result of the misinterpret-

.

ation by UST of the requirements specified in UST-TQ-1, Revision 9,

1

Section IV, paragraphs 1.5 and 1.6.

--

Item g. is closed.

i

-

h.

Five occasions in which UST personnel were certified to Level I

requirements prior to completion of the interview and practical

demonstration of their proficiency.

It is the inspector's understanding that it is presently the practice

,

of UST to title newly employed personnel as Level I prior to the com-

)

pletion of the required certification program. This practice allows

UST to include these personnel on the site payroll. The title, Level

I, infers that the individual has met the requirements of ANSI

N45.2.6-1973Property "ANSI code" (as page type) with input value "ANSI</br></br>N45.2.6-1973" contains invalid characters or is incomplete and therefore can cause unexpected results during a query or annotation process. and is qualified to perform " record" tests. Being a

Level I at UST does not presently assure that the individual ~is

qualified in accordance irith ANSI N45.2.6-1973.

In response, UST management personnel stated that at no time, either

in the past or present, are laboratory technicians allowed to_ perform

" record" tests until they have successfully met all the certification

requirements as specified in UST-TQ-1, Revision 9,Section V.

l

This practice of titling technicians as Level I before all require-

'

ments have been met is unacceptable regardless of any contractual

arrangements or understandings that may exist.

Item h. remains open.

i.

Two occasions in which UST personnel were certified to Level I require-

ments prior to receiving visual examinations.

UST has proposed the use of a new employee checklist which would

have to be completed prior to the release of any UST employee to

perform work. This list would include a check point for the

employee's physical / visual examination.

,

The records of satisiactory visual examinations for both UST personnel

in question were reviewed by the RIII inspector.

Item i. remains open pending the incorporation of this form or a

similar form into the formal UST program. Other methods to

resolve this noncompliance may exist and will be reviewed for

their merit at the time they are presented.

J.

Four occasions in which the required physical and visual re-examinations

were overdue for periods up to two months.

The records of satisfactory physical / visual re-examinations for the

four UST personnel in question were reviewed by the RIII inspector.

-5-

. - . ~ .- - , , . , _ - - . . . - . .

.

. - .

. . . .

.

.

To preclude recurrence of this situation, UST has established a

" tickler" file system to assure timely re qualification of labora-

tory personnel Proficiency Evaluations, Document of Qualifications,

and physical / visual examinations.

--

Item J. is closed.

k.

At least seven UST personnel were certified to Level I that did not

meet the experience requirements as specified in ANSI N45.2.6-73.

UST management personnel stated that it is their intent to qualify

certain laboratory technicians in accordance with paragraph 3.1

of ANSI N45.2.6-73.

At present, UST-TQ-1 Revision 9 does not

specifically address the method for certification of personnel in

accordance with paragraph 3.1.

It is imperative that UST-TQ-1

be consistent with Regulatory Guide 1.58, which endorses ANSI

N45.2.6-73Property "ANSI code" (as page type) with input value "ANSI</br></br>N45.2.6-73" contains invalid characters or is incomplete and therefore can cause unexpected results during a query or annotation process..

If the general education and experience requirements of ANSI

N45.2.6-73Property "ANSI code" (as page type) with input value "ANSI</br></br>N45.2.6-73" contains invalid characters or is incomplete and therefore can cause unexpected results during a query or annotation process. are not being met, and the basis for this is paragraph

3.1, then the rationale for this action and criteria for evaluation

must be established.

Item k. remains open.

Functional or Program Areas Inspected

.

1.

Construction Verification Program (SPP-5)

Review of Implementing Procedures - The RIII inspector reviewed

a.

Construction Verification Program Procedure No. SPP-5, Revision

0 entitled Category I Concrete Surface Irregularities to verify

that it included appropriate inspection personnel qualification

requirements, that it was technically adequate, and that adequate

quality documentation would be generated as a result of its im-

plementation. On January 30, 1980, RIII concurred with the use

of Procedure No. SPP-5, Revision 0 as a part of the Construction

Verification Program. Subsequent revisions and the date of RIII

concurrence are as follows:

Revision 1 - February 5, 1980

Revision 2 - February 5, 1980

Revision 3 - February 11, 1980

Revision 4 - February 15, 1980

Each revision was reviewed to determine its impact on previously

completed work.

b.

Observation of Work - In process work being performed in the

Auxiliary Building was observed in the following specific

areas:

-6-

.-

.

. . . . . .

- . - .. . . - . -

. - . . . , . .

.

.. .

.

(1) February 13, 1980 - Observed Physical Survey Team (PST)

e

inspection of the west face of L line wall, 16-18 lines;

S&L Drawing S-690, Revision P; Elevation 383'.

(2) February 13, 1980 - Observed PST inspection of the-ceiling

and walls in an area L-P lines and 8-10 lines; S&L Drawing

S-705, Revision G; Elevation 383'.

(3) February 14, 1980 - Observed PST inspection of columns

in an area M-P lines and 11-12 lines; S&L Drawing S-690,

Revision P; Elevation 383'.

(4) February 14, 1980 - Observed PST inspection of the ceiling

in an area M-P lines and 13-15 lines; S&L Drawing S-696,

Revision W; Elevation 383'.

,

The specific observations included verification that the in-

process inspections were being performed in accordance with the

specified procedural requirements.

c.

Review of Quality Records - Individual daily inspection packages

generated as a result of the concrete verification program in

the Auxiliary Building were reviewed. Each package included

marked-up drawings; Concrete Patch Data Sheets, Repair Area

Data Sheets, and the identity of the inspectors performing the

work. Specific packages reviewed are as follows:

(1) February 6, 1980 - Inspection of walls and columns in an

area L-Q lines and 24-26 lines; S&L Drawing S-691, Revision

P; Elevation 383'.

j

i

(2) February 7, 1980 - Inspection of ceiling and beams in an

area L-Q lines and 24-26 lines, also the west face of L

line wall from 20-24 lines; S&L Drawings S-691, Revision

i

P and S-697, Revision W; Elevation 383'.

(3) February 8, 1980 - Inspection of the ceiling in an area

,

L-M lines and 23-24 lines, also walls and columns in an

area L-Q lines and 20-24 lines; S&L Drawings S-691, Revi-

'

sion P and S-697, Revision W; Elevation 383'.

(4) February 11, 1980 - Inspection cf the ceiling in an area

L-Q lines and 20-24 lines (excluding L-M lines and 23-24

lines; P-Q lines and 20-21 liner); Elevation 383'.

(5) February 12, 1980 -

Team 1 - Inspection of the ceiling in an area L-Q lines and

\\

18-20 lines, also P-Q lines and 20-21 lines; S&L Drawings

S-691, Revision P and S-697, Revision W; Elevation 383'.

-7-

.

. .

. . . . , - . . - . . .

- - -

. -

.

-

,

_

.

!

Team 2 - Inspection wf walls on L and P' lines 8-10 lines,

-

also south face of 10 line wall, L-P lines; S&L Drawings

S-705, Revision G; Elevation 383'.

--

(6) February 13, 1980 -

Team 1 - Inspection of walls and columns in an area L-Q

,

lines and 13-18 lines, also the ceiling in an area M-Q

lines and 15-18 lines; S&L Drawings S-690, Revision P

and S-696, Revision W; Elevation 383'.

1

Team 2 - Inspection of the. ceiling in an area M-P lines and

2

8-10 lines, also the north face of 8 line wall, L-P lines;

S&L Drawings S-695, Revision L and S-705, Revision G;

Elevation 383'.

"

No items of noncompliance were identified.

2.

Safety Related Backfill - The RIII inspector reviewed the applicable

sections of the S&L Specification Y-2722 dealing with backfill, N-MH

,

!

implementing Procedure WPN-4, and quality documentation regarding the

placement, inspection, and testing of backfill at the Marble Hill

site. The following areas of concern were identified during the

review.

Licensee personnel are not aware if a test fill for safety-

a.

related backfill has been performed. ior a specific type of

fill material, the test fill would establish acceptable lift

thicknesses, type of compaction equiament, and number of roller

passes required to assure acceptable in place densities. Fur-

,

thermore, due to the variation of in place density within a

'

single lift thickness, a test fill would establish the most

critical depth within a lift at which in place density tests

should be performed.

4

i

b.

No procedural requirements for QC inspection for backfill placing

and compaction exist. These inspections would typically verify

.,

type of compaction equipment, number of roller passes, lift

thickness, etc.

It appears that no system exists to assure timely sampling of

c.

,

backfill material for the required relative densit, tests

'

(ASTM D2049). Records were not available during this inspection

to demonstrate that the 4000 cubic yard sample / test frequency

for relative density had been met.

j

d.

Presently, the relative density sample is taken from the material

stock pile. .Along with this sample, a sieve analysis sample is

taken. Records were not available at the time of this inspection

to establish that the material gradation had not varied substan-

4

tially from the stockpile:to the point of placement, due to

material handling. This change in gradation, if it occurs, can

affect the relative density test results.

'

'

,

i

-8-

i

--+-,-*A-*-

w- +w.-.e

e-.

7y w - * * -* a - - +.

+ -

.

_

.

e.

Substantial test result variations for the minimum and maximum

density tests (ASTM D2049) performed by UST were observed in

the relative density log.

,

f.

There are presently no provisions established which control the

use of #53 stone which fails to meet the gradation requirement

.r.pecified in S&L Specification Y-2722, Section 302-14.e1.

g.

The responsible QC backfill inspectors were not aware of the S&L

Specification Y-2722, Section 302.14 d7. requirement which speci-

fies that, "The maximum loose lift thickness shall not exceed

three inches where power tampers or similar special compaction

equipment are used."

Resulting from the identification of these unresolved items, the

licensee stated that safety-related backfill would be included as a

part of the Construction Verification Program.

Items a. through g. above are considered unresolved.

(546/80-06-01;

547/80-06-01).

No items of noncompliance were identified.

3.

Review of Licensee Conformance to PSAR Commitments

A review of S&L Specifications Y-2722 and Y-2850 identifie2 several

areas in which the specification requirements were not ia conform-

ance with PSAR commitments in Chapter 17. Section 17.1.2.1 of

Chapter 17 states that PSI will comply with the AEC Regulatory

Guide, Guidance on Quality Assurance Requirements During Construction

Phase of Nuclear Power Plants, Revision 0 dated May 1974 (Green Book

- Revision 0) The Green Book, Revision 0 endorses ANSI N45.2.5-1973,

Draf t 3, Revision 1 - January 1974.

'

The following are specific areas in which conflicts between the

referenced specification and PSAR commitments were identified.

a.

ANSI N45.2.5-1973, Table B states that fresh concrete shall be

sampled in accordance with ASTM C172. ASTM C-172, Section

3.2.3 states that when concrete is sampled from revolving drum

truck mixers or agitators, the sample shall be obtained from

two or more regularly spaced intervals during discharge of the

middle portion of the batch and that those samples shall be

composited into one sample for test purposes.

Contrary to the above, S&L Specification Y-2850, Section 411.8A.b.

'

states that, " Samples (concrete) shall be obtained in accordance

with ASTM C172, except that when sample is secured by diverting

truck chute or pipe discharge into wheelbarrow, no compositing

is required; and when central mixed concrete is delivered, sample

may be taken from'any portion of truck discharge.

-9-

. _ . . _

.

,.

7 . .

_.

_m

_.. __ _

_ _ _ _ _ .

_

,

.

b.

ANSI N45.2.5-1973, Table B requires cement to be sampled and

,

tested every 500 bbls (94 tons) in accordance with ASTM C183

for in process chemical and physical testing as required by

ASTM C150.

__

.

Contrary to the above, S&L Specification Y-2722, Section 403.3 b.

states that cement sampling and testing, to ascertain conformance

with ASTM C150, be performd at a frequency of every 1200 tons.

c.

ANSI N45.2.5-1973, Table B endorses ASTM C31, Making and Curing

Concrete Test Specimens.in the Field. Section 7.3 of ASTM C31

requires that compressive strength test specimens be removed

from the molds at the end of 20t4 hours and stored in a moist

condition at 73.413 F until the moment of test

Contrary to the above, S&L Specification Y-2850, Section 411.7A

states that, "Holded cylinders may be left at the point of

sampling for a maximum of 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> before being moved into

"

moist curing in the laboratory. . .

.

d.

ANSI N45.2.5-1973, Table B requires that the design age compressive

strength cylinders be cast from concrete samples obtained at

the frequency of every 100 cubic yards.

Contrary to the above, S&L Specification Y-2722, Table 4-1-5

states that for "Other" Category I work, concrete samples shall

be obtained from every 150 cubic yards.

The licensee was advised that these failures (items a. through

d. above) to correctly translate the requirements specified in

the license application into specifications, drawings, proce-

dures, and instructions are considered an item of noncompliance

with 10 CFR 50, Appendix B, Criterion III.

(546/80-06-02;

547/80-06-02).

Unresolved Items

Unresolved items are matters about which more information is required in

order to ascertain whether they are acceptable items, items of noncompli-

)

ance, or deviations. One unresolved item disclosed during this inspection

is discussed in Section 2 in the Functional or Program Areas Inspected

section of this report.

Exit Interview

The inspector met with the staff representatives (denoted in the Persons

Contacted paragraph) at the conclusion of the inspection on February 8 and

15, 1980. The inspector summarized the scope and findings of the inspec-

tion. The licensee acknowledged the findings.