Slide Presentation Entitled SEP Briefing Outline
ML19323B648
Person / Time
Issue date: 05/06/1980
From:
NRC COMMISSION (OCM)
To:
Shared Package
ML19323B639 List:
References
REF-10CFR9.7 NUDOCS 8005140023
Download: ML19323B648 (7)


Text

__

2 SYSTEMATIC EVALUATION PROGRAM l

BRIEFING OUTLINE l

E I.

INTRODUCTION k

9 OBJECTIVES OF PROGRAM S

SCHEDULE / STAFFING ll.

STATUS 9

MAJOR ACCOMPLISHMENTS 9

REVIEW STATUS 9

REVIEW APPROACH lli.

PROGRAM DIFFICULTIES 9

REVISED SCHEDULE

~

IV.

FUTURE ACTIONS 9

PROGRAM ALTERNATIVES O

OBJECTIVES O

Assess Adequacy of Design and Operation a

Review and Document Comparison with Current Criteria Provide Bases fdr Integrated & Balanced Backfit Decisions Identify Major Deficiencies Early, if Any Use Available Resources; Minimize Impact on NRC & Industry i-ww 3-n e-=

REVIEW STATUS O 137 TOPICS ON EACH OF 11 PLANTS (ABOUT 1500 PLANT-TOPICSD G

OF 1500 PLANT-TOPICS

~275 DELETED AS NOT APPLICABLE

~250 GENERIC OUTSIDE SEP

~200 SAFETY EVALUATIONS ISSUED

~130 SAFETY EVALUATIONS UNDER PREPARATION

~110 AWAITING INFORMATION FROM LICENSEES

~535 REVIEW JUST GETTING STARTED

SIGNIFICANT SAFETY TOPICS IDENTIFIED I

O ENVIRONMENTAL QUALIFICATIONS G

SAFE SHUTDOWN REVIEWS i

S SEISMIC PROGRAM LACROSSE LIQUEFACTION SITE SPECIFIC SPECTRA G

FLOODING G

PIPE BREAKS / INTERACTIONS O

CONTROL ROOM HABITABILITY I

s-__

m u

m O

PROGRAM DIFFICULTIES O

UNIQUE PROGRAM CONSIDERATIONS PLANTS DO NOT MEET CURRENT CRITERIA DIFFICULT ASSESSING DEVIATIONS DESIGNS DIFFERENT THAN CURRENT PLANTS O

LICENSEES NOT AGGRESSIVELY PURSUING PROGRAM SEP VIEWED AS AN NRC PROGRAM COMPETING NRC ACTIVITIES

e r

4 1

NRR MANPOWER FY 78 FY 79 FY 80 BUDGETED 32 32 32 i

EXPENDED 17.8 25 13 l

(FIRST l

HALF) t i

FUTURE ACTIONS 6 CONTINUE PROGRAM FOR 11 PLANTS AS HIGH PRIORITY e COMPLETION - APRIL 1982 e MORE MAN AGEMENT ATTENTION

- COMMITTED FU LL TIME REVIEWERS

- INTERDISCIPLINARY REVIEW TEAMS

- INTEGR ATED ASSESSMENT P.M.'S e EXAMINE PROBRAM ALTERNATIVES

- MORE BURDEN ON LICENSEE

- RISK ASSESSMENT 4 OTHER CONSIDERATIONS

- LOW POWER FACILITIES

- 8000 OPERATIONAL HISTORY

- BENERALLY NOT Hl8H CONSEQUENCE SITES

.