MONTHYEARML17355A4601999-10-26026 October 1999
[Table view]Forwards Revised Epips,Including Revs to 0-EPIP-1102, 0-EPIP-1212,0-EPIP-20110,0-EPIP-20111,0-EPIP-20132, 0-EPIP-20133 & 0-EPIP-20201,per 10CFR50.54(q) & 10CFR50, App E.Epip 0-EPIP-20107,has Been Deleted ML17241A5001999-10-21021 October 1999 Forwards Rev 3 to Emergency Response Data Sys (ERDS) Data Point Library for St Lucie Unit 1.Rev Provides Replacement Pages & Follows Format Recommended by NUREG 1394, ERDS Implementation, Rev 1,App C ML17309A9981999-10-19019 October 1999 Forwards Revised Epips,Including Rev 3 to EPIP-10 & Rev 25 to HP-202.EPIP-10 Added Onsite Monitoring Points,Made Administrative Changes & Incorporated New Attachments & HP-202 Added Red Team Survey Points ML20217F9941999-10-15015 October 1999 Discusses FPC 970819 Request for Temporary Relief from ASME Code Section XI Requirements to Repair ASME Class 3 Nuclear Service & Decay Heat Sea Water System Piping.Forwards SE Containing Results of Staff Review ML20217J5171999-10-13013 October 1999 Informs That on 990930,NRC Staff Completed mid-cycle PPR of Plant,Unit 3 & Did Not Identify Any New Areas That Warranted More than Core Insp Program.Previously Planned Regional Initiative Insp of safety-related Mod Will Be Performed 3F1099-14, Requests Copy of NRC Radtrad Code & Copy of User Instructions.Conditions for Receiving Code Listed1999-10-13013 October 1999 Requests Copy of NRC Radtrad Code & Copy of User Instructions.Conditions for Receiving Code Listed ML20217F6171999-10-0808 October 1999 Forwards Insp Repts 50-335/99-11 & 50-389/99-11 on 990827 & 990907-09.No Violations Identified.Matl Encl Contained Safeguards Info as Defined by 10CFR73.21 & Disclosed to Unauthorized Individuals Prohibited by Section 147 of AEA ML17355A4301999-10-0808 October 1999 Forwards Rev 16 of Updated Fsar.Info Accurately Reflects Plant Changes Made Since Previous Submittal.Rev Incorporates Changes Completed Between 971015 & 990408.Summary of Accuracy Review Changes & Instructions,Included ML17355A4461999-10-0404 October 1999 Notifies NRC of Change in Commitment to Perform Periodic Testing of Critical Welds & Parts on Special Lifting Devices IAW NUREG-0612.Use of Ae Technology Will Provide Same Level of Testing Quality as Did NDE Methods Noted in ANSI Std ML17355A4291999-10-0404 October 1999 Forwards Response to NRC Telcon Questions Re License Amend Request Dtd 990727,proposing Amend on one-time Basis to Modify TS 3.8.1.1 & TS 3.4.3 & 3.5.2 to Extend Allowed Outage Time for EDG from 72 H to 7 Days 3F1099-11, Provides Info on Requested Minor Permit Mod of Encl NPDES Permit.No New Regulatory Commitments Are Made1999-10-0404 October 1999 Provides Info on Requested Minor Permit Mod of Encl NPDES Permit.No New Regulatory Commitments Are Made ML20212L0771999-10-0404 October 1999 Forwards SER Accepting Licensee Relief Requests 98-012 Through 98-018 Involving Containment Insps at Crystal River Unit 3 Pursuant to 10CFR50.55a(a)(3)(i) & 10CFR50.55a(a)(3)(ii) L-99-208, Forwards Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 971014-990408. Summary of PORV Actuations & Results of Plants SG Tube Insp,Which Occurred During That Time Included1999-10-0404 October 1999 Forwards Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 971014-990408. Summary of PORV Actuations & Results of Plants SG Tube Insp,Which Occurred During That Time Included ML17241A4811999-10-0101 October 1999 Reports Number of Tubes Plugged During Unit 1 Refueling Outage SL1-16,per TS 4.4.5.5.a ML20217D6551999-10-0101 October 1999 Requests That Natl Communication Sys Arrange for Licensee Participation in Government Emergency Telecommunications Service,Per NRC Info Notice 99-025 ML20212J8481999-10-0101 October 1999 Forwards Safety Evaluation Re Second 10 Yr Interval ISI Program Requests for Relief 98-009-II.Reliefs Granted for 98-009-II,Parts B & C & 98-010-II & 98-011-II ML20212M1601999-09-28028 September 1999 Refers to 990908 Engineering Meeting Conducted at NRC Region II to Discuss Engineering Issues at Lucie & Turkey Point Facilities.List of Attendees & Copy of Presentation Handout Encl 3F0999-18, Notifies NRC That Due Date for Commitment Common to Ltrs 980115 & 980209 Will Be Extended.Revised Completion Date for Cable Ampacity Project Is 0003311999-09-27027 September 1999 Notifies NRC That Due Date for Commitment Common to Ltrs 980115 & 980209 Will Be Extended.Revised Completion Date for Cable Ampacity Project Is 000331 3F0999-03, Notifies of Approved Change to NPDES Permit Applicable to Crystal River Unit 3 IAW Section 3.2.3 of Epp.Proposed Change Was Approved on 990914 by State of Fl & Provided in Attachment1999-09-27027 September 1999 Notifies of Approved Change to NPDES Permit Applicable to Crystal River Unit 3 IAW Section 3.2.3 of Epp.Proposed Change Was Approved on 990914 by State of Fl & Provided in Attachment ML17241A4701999-09-25025 September 1999 Forwards Info Requested by NRC Staff During 990916 Telcon to Complete Staff Review of Request for risk-informed Extension of Action Completion/Aot Specified for Inoperable Train of LPSI Sys at Plant ML17241A4721999-09-24024 September 1999 Forwards Rev 1 to Plant Change/Mod (PCM) 99016 to St Lucie Unit 1,Cycle 16 COLR, IAW TS 6.9.1.11.d.Refueling Overhaul Activities Are Currently in Progress & Reactor Operations for Cycle 16 Are Scheduled to Commence in Oct 1999 ML20212F7331999-09-23023 September 1999 Discusses Util Licensing Action for GL 98-01, Year 2000 Readiness of Computer Systems at Nuclear Power Plants. NRC Ack Efforts Util Completed to Date in Preparing Crystal River,Unit 3 for Y2K Transition ML20212F7251999-09-23023 September 1999 Discusses Staff Review of Util 980330 Response,As Suppl on 990514,to GL 97-06, Degradation of SG Internals. Staff Concludes That Licensee Responses to GL Provide Reasonable Assurance That Condition of SG Internals Acceptable ML17355A4251999-09-22022 September 1999 Forwards NRC Form 536 in Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams, Issued 990820 ML17241A4681999-09-22022 September 1999 Requests Restriction Be Added to Senior Operator License SOP-21093 for TE Bolander.Nrc Forms 369,encl.Encl Withheld Per 10CFR2.790(a)(6) 3F0999-20, Forwards Summary Re Justification to Defer USI A-46 Commitment,Per Work Needed to Resolve GL 87-03, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors,Usi A-461999-09-21021 September 1999 Forwards Summary Re Justification to Defer USI A-46 Commitment,Per Work Needed to Resolve GL 87-03, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors,Usi A-46 ML20212E6741999-09-21021 September 1999 Forwards Safety Evaluation Accepting Proposed EAL Changes Submitted by ,As Supplemented by 981120,990713 & 0831 Ltrs,Incorporating Guidance in NUMARC/NESP-007,Rev 2, Methodology for Development of Eals ML17241A4671999-09-20020 September 1999 Forwards Completed NRC Form 536, Operator Licensing Exam Data, for St Lucie Units 1 & 2,as Requested in Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams. 3F0999-01, Forwards FPC Crystal River Unit 3 Plant Reference Simulator Four-Year Simulator Certification Rept Sept 1995-Sept 1999, Per 10CFR55.45(b)(5)(ii) & 10CFR55.45(b)(5)(iv)1999-09-17017 September 1999 Forwards FPC Crystal River Unit 3 Plant Reference Simulator Four-Year Simulator Certification Rept Sept 1995-Sept 1999, Per 10CFR55.45(b)(5)(ii) & 10CFR55.45(b)(5)(iv) 3F0999-19, Provides Clarification of Minor Inconsistency Identified During Review of NRC SE for Plant Third 10-year Interval Inservice Insp Program Plan & Associated Requests for Relief1999-09-15015 September 1999 Provides Clarification of Minor Inconsistency Identified During Review of NRC SE for Plant Third 10-year Interval Inservice Insp Program Plan & Associated Requests for Relief ML20212F3141999-09-13013 September 1999 Forwards Insp Rept 50-302/99-05 on 990704-0814.Violations Noted,But Being Treated as non-cited Violations ML17241A4581999-09-13013 September 1999 Forwards Info Requested by NRC Staff During 990630 & 0816 Telcons,To Complete Review of Proposed License Amend for Fuel Reload Process Improvement Program ML17355A4111999-09-0909 September 1999 Informs That Thermo-Lag Upgrades for Fire Zones 47,54,113, 114,115,116,118,119,120 & 143 Completed on 990726,per GL 92-08 ML17355A4131999-09-0707 September 1999 Forwards Revised Relief Request 20 Re Requirement to Perform Exams as Required by IWL-2524 & IWL-2525,Table IWL-2500-1 for Exempt Tendon Insp,Per Recent Discussions with NRC ML20211L9081999-09-0303 September 1999 Informs of Completion of Licensing Action for GL 92-08, Thermo-Lag 330-1 Fire Barriers, Dtd 921217,for Crystal River Unit 3 ML17355A4141999-09-0202 September 1999 Documents That Util Has No Concerns or Challenges Related to site-specific Written Exam Administered at Plant on 990830 ML20211Q7581999-09-0101 September 1999 Forwards Summary of 990812-13 Training Managers Conference in Atlanta,Georgia Re Recent Changes to Operator Licensing Program.List Conference Attendees,Copy of Presentation Slides & List of Participant Questions Encl 3F0899-23, Provides Addl Info in Response to Several NRC Staff Questions Needed to Complete Review of Request to Adopt NEI 97-03,Draft Final Rev 3, Methodology for Development of Eals1999-08-31031 August 1999 Provides Addl Info in Response to Several NRC Staff Questions Needed to Complete Review of Request to Adopt NEI 97-03,Draft Final Rev 3, Methodology for Development of Eals ML17241A4521999-08-31031 August 1999 Withdraws Relief Request 16 & Suppl Relief Request 15 with Info Requested During 990526 Telephone Conference Re ISI Insp Plan,Third 10-yr Interval ML17241A4531999-08-31031 August 1999 Informs That No Candidates from St Lucie Plant Will Be Participating in PWR Gfes Being Administered on 991006 ML20211G7031999-08-30030 August 1999 Informs of Approval of Util 980521 Request for Exception to 10CFR50.4(b)(6),allowing Util to Submit Updates to Plant Ufsar.Ltr Modifies That Approval & Grants Util Approval ML20211G7111999-08-30030 August 1999 Modifies Approval of 980521 Request for Exception to 10CFR50.4(b)(6) & Grants Util Approval to Submit Copies of Future Updates to FSAR as Listed ML20212C1351999-08-27027 August 1999 Requests Withholding of Proprietary Version of Enhanced Spent Fuel Storage Project Engineering Input 3F0899-07, Provides Formal Notification to NRC of FPC Plans Relative to Renewal of Crystal River Unit 3,FOL DPR-72.FPC Plans to Submit Application for License Renewal by End of 20021999-08-27027 August 1999 Provides Formal Notification to NRC of FPC Plans Relative to Renewal of Crystal River Unit 3,FOL DPR-72.FPC Plans to Submit Application for License Renewal by End of 2002 3F0899-20, Forwards six-month fitness-for-duty Program Performance Data for Period 990101-990630,IAW 10CFR26.711999-08-26026 August 1999 Forwards six-month fitness-for-duty Program Performance Data for Period 990101-990630,IAW 10CFR26.71 ML17241A4501999-08-26026 August 1999 Informs That FPL Has Reviewed Reactor Vessel Integrity Database,Called RVID2,re Closure of GL 92-01,rev 1,suppl 1. Requested Corrections & Marked Up Pages from Rvid 2 Database Summary Repts That Correspond to Comments,Attached ML17355A4041999-08-23023 August 1999 Forwards Info to Support Assessment of Potential Risks Associated with Proposed Civil Aircraft Operations at Former Homestead Air Force Base to FP&L Turkey Point Nuclear Facility Units 3 & 4 ML17355A4061999-08-23023 August 1999 Forwards Semiannual FFD Performance Rept for Period of Jan- June 1999,for Turkey Point Units 3 & 4.List of Events Reported & Summary of Mgt Actions Taken,Included ML17355A4071999-08-23023 August 1999 Informs That FPL Has Completed Review of Info Listed in Reactor Vessel Integrity Database,Version 2 & Found Listed Discrepancies,Re Closure of GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity. ML17355A4001999-08-20020 August 1999 Informs That on 990722,util Determined Blind Specimen Submitted to Smithkline Beecham Clinical Labs on 990721,was Reported Back with Unsatisfactory Results.Attachment 1 Is Summary of Investigation of Unsatisfactory Performance 1999-09-09 Category:INCOMING CORRESPONDENCE MONTHYEARML17355A4601999-10-26026 October 1999
[Table view]Forwards Revised Epips,Including Revs to 0-EPIP-1102, 0-EPIP-1212,0-EPIP-20110,0-EPIP-20111,0-EPIP-20132, 0-EPIP-20133 & 0-EPIP-20201,per 10CFR50.54(q) & 10CFR50, App E.Epip 0-EPIP-20107,has Been Deleted ML17241A5001999-10-21021 October 1999 Forwards Rev 3 to Emergency Response Data Sys (ERDS) Data Point Library for St Lucie Unit 1.Rev Provides Replacement Pages & Follows Format Recommended by NUREG 1394, ERDS Implementation, Rev 1,App C ML17309A9981999-10-19019 October 1999 Forwards Revised Epips,Including Rev 3 to EPIP-10 & Rev 25 to HP-202.EPIP-10 Added Onsite Monitoring Points,Made Administrative Changes & Incorporated New Attachments & HP-202 Added Red Team Survey Points 3F1099-14, Requests Copy of NRC Radtrad Code & Copy of User Instructions.Conditions for Receiving Code Listed1999-10-13013 October 1999 Requests Copy of NRC Radtrad Code & Copy of User Instructions.Conditions for Receiving Code Listed ML17355A4301999-10-0808 October 1999 Forwards Rev 16 of Updated Fsar.Info Accurately Reflects Plant Changes Made Since Previous Submittal.Rev Incorporates Changes Completed Between 971015 & 990408.Summary of Accuracy Review Changes & Instructions,Included L-99-208, Forwards Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 971014-990408. Summary of PORV Actuations & Results of Plants SG Tube Insp,Which Occurred During That Time Included1999-10-0404 October 1999 Forwards Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 971014-990408. Summary of PORV Actuations & Results of Plants SG Tube Insp,Which Occurred During That Time Included ML17355A4461999-10-0404 October 1999 Notifies NRC of Change in Commitment to Perform Periodic Testing of Critical Welds & Parts on Special Lifting Devices IAW NUREG-0612.Use of Ae Technology Will Provide Same Level of Testing Quality as Did NDE Methods Noted in ANSI Std ML17355A4291999-10-0404 October 1999 Forwards Response to NRC Telcon Questions Re License Amend Request Dtd 990727,proposing Amend on one-time Basis to Modify TS 3.8.1.1 & TS 3.4.3 & 3.5.2 to Extend Allowed Outage Time for EDG from 72 H to 7 Days 3F1099-11, Provides Info on Requested Minor Permit Mod of Encl NPDES Permit.No New Regulatory Commitments Are Made1999-10-0404 October 1999 Provides Info on Requested Minor Permit Mod of Encl NPDES Permit.No New Regulatory Commitments Are Made ML17241A4811999-10-0101 October 1999 Reports Number of Tubes Plugged During Unit 1 Refueling Outage SL1-16,per TS 4.4.5.5.a 3F0999-18, Notifies NRC That Due Date for Commitment Common to Ltrs 980115 & 980209 Will Be Extended.Revised Completion Date for Cable Ampacity Project Is 0003311999-09-27027 September 1999 Notifies NRC That Due Date for Commitment Common to Ltrs 980115 & 980209 Will Be Extended.Revised Completion Date for Cable Ampacity Project Is 000331 3F0999-03, Notifies of Approved Change to NPDES Permit Applicable to Crystal River Unit 3 IAW Section 3.2.3 of Epp.Proposed Change Was Approved on 990914 by State of Fl & Provided in Attachment1999-09-27027 September 1999 Notifies of Approved Change to NPDES Permit Applicable to Crystal River Unit 3 IAW Section 3.2.3 of Epp.Proposed Change Was Approved on 990914 by State of Fl & Provided in Attachment ML17241A4701999-09-25025 September 1999 Forwards Info Requested by NRC Staff During 990916 Telcon to Complete Staff Review of Request for risk-informed Extension of Action Completion/Aot Specified for Inoperable Train of LPSI Sys at Plant ML17241A4721999-09-24024 September 1999 Forwards Rev 1 to Plant Change/Mod (PCM) 99016 to St Lucie Unit 1,Cycle 16 COLR, IAW TS 6.9.1.11.d.Refueling Overhaul Activities Are Currently in Progress & Reactor Operations for Cycle 16 Are Scheduled to Commence in Oct 1999 ML17241A4681999-09-22022 September 1999 Requests Restriction Be Added to Senior Operator License SOP-21093 for TE Bolander.Nrc Forms 369,encl.Encl Withheld Per 10CFR2.790(a)(6) ML17355A4251999-09-22022 September 1999 Forwards NRC Form 536 in Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams, Issued 990820 3F0999-20, Forwards Summary Re Justification to Defer USI A-46 Commitment,Per Work Needed to Resolve GL 87-03, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors,Usi A-461999-09-21021 September 1999 Forwards Summary Re Justification to Defer USI A-46 Commitment,Per Work Needed to Resolve GL 87-03, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors,Usi A-46 ML17241A4671999-09-20020 September 1999 Forwards Completed NRC Form 536, Operator Licensing Exam Data, for St Lucie Units 1 & 2,as Requested in Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams. 3F0999-01, Forwards FPC Crystal River Unit 3 Plant Reference Simulator Four-Year Simulator Certification Rept Sept 1995-Sept 1999, Per 10CFR55.45(b)(5)(ii) & 10CFR55.45(b)(5)(iv)1999-09-17017 September 1999 Forwards FPC Crystal River Unit 3 Plant Reference Simulator Four-Year Simulator Certification Rept Sept 1995-Sept 1999, Per 10CFR55.45(b)(5)(ii) & 10CFR55.45(b)(5)(iv) 3F0999-19, Provides Clarification of Minor Inconsistency Identified During Review of NRC SE for Plant Third 10-year Interval Inservice Insp Program Plan & Associated Requests for Relief1999-09-15015 September 1999 Provides Clarification of Minor Inconsistency Identified During Review of NRC SE for Plant Third 10-year Interval Inservice Insp Program Plan & Associated Requests for Relief ML17241A4581999-09-13013 September 1999 Forwards Info Requested by NRC Staff During 990630 & 0816 Telcons,To Complete Review of Proposed License Amend for Fuel Reload Process Improvement Program ML17355A4111999-09-0909 September 1999 Informs That Thermo-Lag Upgrades for Fire Zones 47,54,113, 114,115,116,118,119,120 & 143 Completed on 990726,per GL 92-08 ML17355A4131999-09-0707 September 1999 Forwards Revised Relief Request 20 Re Requirement to Perform Exams as Required by IWL-2524 & IWL-2525,Table IWL-2500-1 for Exempt Tendon Insp,Per Recent Discussions with NRC ML17355A4141999-09-0202 September 1999 Documents That Util Has No Concerns or Challenges Related to site-specific Written Exam Administered at Plant on 990830 ML17241A4521999-08-31031 August 1999 Withdraws Relief Request 16 & Suppl Relief Request 15 with Info Requested During 990526 Telephone Conference Re ISI Insp Plan,Third 10-yr Interval ML17241A4531999-08-31031 August 1999 Informs That No Candidates from St Lucie Plant Will Be Participating in PWR Gfes Being Administered on 991006 3F0899-23, Provides Addl Info in Response to Several NRC Staff Questions Needed to Complete Review of Request to Adopt NEI 97-03,Draft Final Rev 3, Methodology for Development of Eals1999-08-31031 August 1999 Provides Addl Info in Response to Several NRC Staff Questions Needed to Complete Review of Request to Adopt NEI 97-03,Draft Final Rev 3, Methodology for Development of Eals 3F0899-07, Provides Formal Notification to NRC of FPC Plans Relative to Renewal of Crystal River Unit 3,FOL DPR-72.FPC Plans to Submit Application for License Renewal by End of 20021999-08-27027 August 1999 Provides Formal Notification to NRC of FPC Plans Relative to Renewal of Crystal River Unit 3,FOL DPR-72.FPC Plans to Submit Application for License Renewal by End of 2002 ML20212C1351999-08-27027 August 1999 Requests Withholding of Proprietary Version of Enhanced Spent Fuel Storage Project Engineering Input ML17241A4501999-08-26026 August 1999 Informs That FPL Has Reviewed Reactor Vessel Integrity Database,Called RVID2,re Closure of GL 92-01,rev 1,suppl 1. Requested Corrections & Marked Up Pages from Rvid 2 Database Summary Repts That Correspond to Comments,Attached 3F0899-20, Forwards six-month fitness-for-duty Program Performance Data for Period 990101-990630,IAW 10CFR26.711999-08-26026 August 1999 Forwards six-month fitness-for-duty Program Performance Data for Period 990101-990630,IAW 10CFR26.71 ML17355A4071999-08-23023 August 1999 Informs That FPL Has Completed Review of Info Listed in Reactor Vessel Integrity Database,Version 2 & Found Listed Discrepancies,Re Closure of GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity. ML17355A4061999-08-23023 August 1999 Forwards Semiannual FFD Performance Rept for Period of Jan- June 1999,for Turkey Point Units 3 & 4.List of Events Reported & Summary of Mgt Actions Taken,Included ML17355A4041999-08-23023 August 1999 Forwards Info to Support Assessment of Potential Risks Associated with Proposed Civil Aircraft Operations at Former Homestead Air Force Base to FP&L Turkey Point Nuclear Facility Units 3 & 4 ML17355A4001999-08-20020 August 1999 Informs That on 990722,util Determined Blind Specimen Submitted to Smithkline Beecham Clinical Labs on 990721,was Reported Back with Unsatisfactory Results.Attachment 1 Is Summary of Investigation of Unsatisfactory Performance 3F0899-05, Forwards Response to NRC 990716 RAI Re Proposed Alternate Repair Criteria for Axial Tube End crack-like Indications in Crystal River Unit 31999-08-20020 August 1999 Forwards Response to NRC 990716 RAI Re Proposed Alternate Repair Criteria for Axial Tube End crack-like Indications in Crystal River Unit 3 3F0899-17, Submits Relief Request 99-0001-RR,seeking NRC Approval for Evaluation Performed by Util on through-wall Flaw in Nuclear Svc & Decay Heat Sea Water (RW) Sys,Per Guidance of GL 90-051999-08-19019 August 1999 Submits Relief Request 99-0001-RR,seeking NRC Approval for Evaluation Performed by Util on through-wall Flaw in Nuclear Svc & Decay Heat Sea Water (RW) Sys,Per Guidance of GL 90-05 3F0899-16, Informs That Licensee Is Requesting State of Fl Dept of Environ Protection to Make Changes in Plant NPDES Permit to Modify Conditions on Use of Biocide in Instrument Air Compressor Sys.No New Commitments Are Made in Submittal1999-08-19019 August 1999 Informs That Licensee Is Requesting State of Fl Dept of Environ Protection to Make Changes in Plant NPDES Permit to Modify Conditions on Use of Biocide in Instrument Air Compressor Sys.No New Commitments Are Made in Submittal 3F0899-02, Forwards Rev 2 to Cycle 11 COLR IAW Plant TS Section 5.6.2.18.Rev 1 of Cycle 11 COLR Was Not Submitted Due to Administrative Error.Changes Made in Rev 1 Listed & Incorporated in Encl Rev 21999-08-16016 August 1999 Forwards Rev 2 to Cycle 11 COLR IAW Plant TS Section 5.6.2.18.Rev 1 of Cycle 11 COLR Was Not Submitted Due to Administrative Error.Changes Made in Rev 1 Listed & Incorporated in Encl Rev 2 3F0899-06, Forwards Monthly Operating Rept for July 1999 for Crystal River,Unit 3,per ITS 5.7.1.2.Revised Repts for Apr,May & June 1999,also Encl.Data on Line Item 6 Updated to Agree with More Accurate Computer Point That Measures Value1999-08-13013 August 1999 Forwards Monthly Operating Rept for July 1999 for Crystal River,Unit 3,per ITS 5.7.1.2.Revised Repts for Apr,May & June 1999,also Encl.Data on Line Item 6 Updated to Agree with More Accurate Computer Point That Measures Value 05000302/LER-1997-038, Forwards LER 97-038-01,IAW 10CFR50.73(c).Submittal Also Provides Notification That Commitment Common to LER 97-038-00 & Reply to NOV 50-302/97-16 Has Been Revised & Revised Commitment Has Been Implemented1999-08-13013 August 1999 Forwards LER 97-038-01,IAW 10CFR50.73(c).Submittal Also Provides Notification That Commitment Common to LER 97-038-00 & Reply to NOV 50-302/97-16 Has Been Revised & Revised Commitment Has Been Implemented ML17241A4371999-08-13013 August 1999 Forwards fitness-for-duty Program Performance Data for six- Month Period Ending 990630,per 10CFR26.71(d) ML17241A4461999-08-11011 August 1999 Requests That W Rept Entitled, Evaluation of Turbine Missile Ejection Probability Resulting from Extending Test Interval of Interceptor & Reheat Stop Valves at St Lucie Units 1 & 2, Be Withheld from Public Disclosure L-99-171, Forwards Rev 56 to Physical Security Plan.Summary of Changes & Marked Up Copy of Revised Pages Also Encl.Encls Withheld from Public Disclosure Per 10CFR2.790(a)(3)1999-07-29029 July 1999 Forwards Rev 56 to Physical Security Plan.Summary of Changes & Marked Up Copy of Revised Pages Also Encl.Encls Withheld from Public Disclosure Per 10CFR2.790(a)(3) 3F0799-30, Forwards List of Licensing Actions Currently Estimated for Fys 2000 & 2001,in Response to Administrative Ltr 99-02,dtd 9906031999-07-29029 July 1999 Forwards List of Licensing Actions Currently Estimated for Fys 2000 & 2001,in Response to Administrative Ltr 99-02,dtd 990603 ML17355A3941999-07-27027 July 1999 Submits Response to NRC AL 99-02, Operating Reactor Licensing Action Estimates, for FY00 & FY01 ML17309A9911999-07-26026 July 1999 Forwards Revised EPIPs & Revised Procedures That Implement Emergency Plan as Listed.Procedures Provides Instruction for Operational Support Ctr (OSC) Chemistry Supervisor to Establish Remote Labs at Locations Specified ML17241A4151999-07-22022 July 1999 Forwards Revised Relief Request 25 for Second 10-yr ISI Interval for Unit 2 ML17241A4221999-07-22022 July 1999 Forwards List of Proposed Licensing Actions for St Lucie Units 1 & 2,planned During Fys 2000 & 2001,in Response to Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates. ML17241A4471999-07-22022 July 1999 Requests That Rev 1 to WCAP-14732 & Rev 1,Add 1 to WCAP-14732 Be Withheld from Public Disclosure 1999-09-09 Category:PUBLIC ENTITY/CITIZEN/ORGANIZATION/MEDIA TO NRC MONTHYEARML20055G8151990-07-10010 July 1990
[Table view]Forwards Response of Nuclear Energy Accountability Project & Tj Saporito to Florida Power & Light Motion for Reconsideration & Dismissal of Petition to Intervene ML20055G7661990-07-0707 July 1990 Requests Full & Complete 900524 ACRS Meeting Transcript Re Reactor Vessel Embrittlement,For Review.Nuclear Energy Accountability Project Considers Comments Re ACRS Meeting Transcript in Washington,Dc Unfair.W/Certificate of Svc ML20058K6871990-06-26026 June 1990 Advises That Nuclear Energy Accountability Project Lacks Sufficient Funds to Send Representative to Oral Argument Scheduled for 900710 in Bethesda,Md.Urges Appeal Board to Grant Motion to Relocate Hearing.W/Certificate of Svc ML20055D8631990-06-20020 June 1990 Advises That Firm Retained to Represent Tj Saporito & Nuclear Energy Accountability Project for Sole Purpose of Advising Organization & Saporito on Responding to Board 900615 Memorandum & Order.Certificate of Svc Encl ML20012E6711990-03-26026 March 1990 Requests That Concerns to Adopt New Set of Tech Specs for Facility Be Fully Investigated to Ensure That Public Health & Safety Not in Jeopardy.Certificate of Svc Encl.Related Correspondence ML20006C5151990-01-12012 January 1990 Statement for Permission to Represent.* Forwards JW Edleson Statement ML20006C5051990-01-0606 January 1990 Statement for Permission to Represent.* Forwards Statement from a Weinkle ML17347B5381989-12-29029 December 1989 Requests NRC Actions,Including Immediate Investigation of Recent Trips at Plant to Determine Root Cause of Events & Imposition of Escalated Civil Penalty in Trips Due to Poor Maint Practices or Incorrect Operations,Per 10CFR2.206 & 2 ML19332D9821989-11-23023 November 1989 Discusses Licensee 891121 Ltr to Board Re Author Supposedly Unjustified Further Allegations & Innuendoes of Wrongdoing, Illegality & Violations by Licensee.Licensee Proffers No Probative Evidence to Contrary.W/Certificate of Svc ML19325E0091989-10-20020 October 1989 Fax Transmission of Affidavit of J Lorion for Presssure/Temp Proceeding (Turkey Point).* Forwards Author Affidavit to Be Incorporated W/Intervenors Response to Licensee Motion for Summary Disposition of Intervenors Contentions ML20248J1381989-09-29029 September 1989 Advises That Intervenors Motion for Extension of Time & Motion for Rev to Hearing Schedule Should No Longer Be Considered by Board Due to Author Not Nominated to PSC of Florida ML20247B6531989-09-0808 September 1989 Advises That Intervenors,Ctr for Nuclear Responsibility & J Lorion Have Advised Franz,Counsel for Licensee & P Jehle,Counsel for Nrc,That Contention 3 Withdrawn.Concerns Re Critical Welds Remain Unresolved ML19332D6491989-09-0505 September 1989 FOIA Request for Listed Records Re Util Application for Exemption from 10CFR50,App a ML20246J3551989-07-0303 July 1989 FOIA Request for Records of NRC Regional Staff Meeting on 890329,NRC Bulletin 88-011,util Ltr L-89-79,INPO SER 25-87, NRC 890411 Meeting Re Westinghouse Owners Group Rept & Topical Repts WCAP-12277 & WCAP-12278 ML20247Q7761989-05-24024 May 1989 Fowards Resolution Being Sponsored by Dade County Commissioner B Carey Which Urges Board to Hold Formal Public Hearings Requested by Ctr for Nuclear Responsibility,For Consideration.W/Certificate of Svc.Served on 890731 ML17222A7821989-04-27027 April 1989 Expresses Concerns for Ecological well-being of Hutchinson Island Due to Increased Nuclear Waste & Potentially Disastrous Emergency Evacuation of Island.Nrc Consideration Directed Toward This Matter Requested ML20247H0911989-04-26026 April 1989 Requests NRC to Take Immediate Actions to Cause Imposition of Escalated Civil Penalty,Suspension of Licenses DPR-31 & DPR-41 & Order to Correct Numerous Plant Deficiencies ML17345A6511989-04-25025 April 1989 Requests Suspension of Licenses DPR-31 & DPR-41 & Imposition of Civil Penalty,Based on NRC Finding Security Guard Asleep at Post & Visitor in Vital Area W/O Access ML20245L5851989-03-22022 March 1989 Requests Enforcement Actions Resulting in Issuance of Notice of Violation W/Imposed & Escalated Civil Penalty & Immediate Suspension & Revocation of Licenses DPR-31 & DPR-41 ML20245L5991989-03-0606 March 1989 Ack Receipt of & Petition for Director'S Decision Under 10CFR2.206 Re Licenses DPR-31 & DPR-41.Advises of Plans,In Interest of Public Safety,To Request Resolution by Ofc of Internal Auditing of Concerns Re NRC Conduct ML20245L5481989-03-0202 March 1989 Advises of Error Contained in 2.206 Document Faxed to Ofc on 890301.L Jennings,South Dade News Leader Reporter,Spoke W/K Clark of NRC & Not O Demiranda,As Reported ML20245L5941989-03-0101 March 1989 Requests Immediate Suspension & Revocation of Licenses DPR-31 & DPR-41 ML20247H1721989-02-0707 February 1989 Requests Revocation of Licenses DPR-31 & DPR-41 & Issuance of Notice of Violation W/Imposed & Escalated Civil Penalty for Util Unlawful Actions,Per 10CFR2.206 ML20247H1291989-01-30030 January 1989 Requests Suspension & Revocation of Licenses DPR-31 & DPR-41 on Basis of Failure of Personnel to Follow Procedures,Very Poorly Written Procedures,Poor Personnel Training & Overwhelming Maint Problems,Per 10CFR2.206 ML17345A5271988-10-31031 October 1988 Notifies of Alleged Activities at Plant Violating Info Notice 81-22,Section 235 ML17222A4331988-06-27027 June 1988 Opposes Util Request That Scheduled Hearing on Proposed Change to More Concentrated Storage Sys for Spent Nuclear Fuels Be Closed to Public & Requests That Hearing Be Open to Public ML20196J8081988-06-27027 June 1988 Opposes Licensee Request That Hearing on Company Proposed Change to More Concentrated Spent Nuclear Fuel Storage Sys Be Closed to Public ML17222A2441988-04-18018 April 1988 Expresses Several Concerns Re Plants.Only Conservative Changes in Procedures of Facilities at Plant That Would Surely Decrease Chances for Need of Evacuation Should Be Considered & Permitted ML20196B3541988-04-0101 April 1988 Requests Inclusion of Subj Ltr as Part of Hearing Proceedings on 880329.Termination Date for long-term Storage of Hazardous Nuclear Wastes on Nuclear Power Plant Sites Requested.Served on 880623 ML20236E0351987-09-30030 September 1987 Requests That Public Hearing Be Held Re Util Request to Double Amount of Radwaste to Be Stored Onsite ML20238B7731987-08-0707 August 1987 FOIA Request for Records Explaining Status of Listed LERs Omitted from List,Previously Received from Nrc,Of LERs Filed by Commercial Nuclear Power Plant Licensees for Operating Year 1986 ML20215D6371987-06-12012 June 1987 Forwards Reply to Responses from NRC & B&W Owners Group. NRC Response Evidences No Independent Review of B&W Claims. Commission Urged to Take Personal Jurisdiction of Petition to Ensure That Latest Commitment Not Frustrated ML17347A3761987-03-30030 March 1987 Requests to Be Placed on Svc List for Any & All Nrc,Util or Vendor Documents Re Corrosion of Vessel Studs & Head. Notification by Phone of Day Util Files 10CFR50.59 Request or Similar Administrative Document Requested ML17308A2361987-03-19019 March 1987 Requests NRC Response to Questions Re Emergency Evacuation Problems at Plant Due to Local & State Govt Reluctance to Solve Problems.Newspaper Articles Highlighting Problems Encl ML20211N0341986-12-10010 December 1986 Forwards Request for Hearing to Ensure That NRC Fulfills Responsibility Re Health & Safety of All Citizens When Major Engineering Change Made.Listed Questions Re Transfer of Spent Fuel Rods Posed to Licensee.Related Correspondence ML20214D6291986-11-0606 November 1986 Requests Hearing Re Util Application for Authorization to Move Spent Fuel from Unit 1 to Unit 2.Served on 861121 ML17346B2111986-07-0707 July 1986 Suggests Not Granting Util Request for Extension of Submittal Date Re Vessel Matl Surveillance Specimen Capsule Fracture Toughness Test Results ML20206L7581986-06-18018 June 1986 FOIA Request for All Repts Provided to NRC During 1986 by INPO Re Recent Study of Safety Sys at Facility ML17216A4491986-01-26026 January 1986 Informs That HR Denton 860106 Response to Author 851205 & 09 Ltrs Did Not Adequately Address Concerns on Safety of Facility.Summary Re Extension of 10 Yr Insp Interval Provided ML17216A3931985-12-0909 December 1985 Raises Concerns Re 1985 Decision to Postpone Safety Shutdown of Facility for Refurbishing After 10 Yrs of Operation & NRC Waiver of 1986 Shutdown.News Article Re Concerns Expressed in 851205 Ltr Encl ML17216A3961985-12-0505 December 1985 Raises Concern Re NRC Waiver of Safety Requirement for 10-yr Refurbishing & Partial Repairs at Facility.Findings of Fact, Hearings,Repts & List of Util Granted Safety Waivers Requested ML20137A7181985-09-27027 September 1985 FOIA Request for Records Generated by NRC & Util on Any Meeting Held During Past Yr Re Development of Integrated Living Schedules for Facility ML20141N2531985-09-24024 September 1985 FOIA Request for Five Categories of Documents Re 850827 Board Notification 85-081 on Allegations Concerning Westinghouse Analyses & QA ML20198M9631985-06-17017 June 1985 Forwards Allegations of Safety Violations of Nuclear Regulatory Law or Westinghouse QA Requirements.Investigation Requested.Related Info Encl ML20111B9271985-03-0707 March 1985 Forwards Intervenor Amended Petition to Intervene & Supplemental Contentions,Per ASLB 850306 Extension for Intervenor Filing Until 850307 ML20095D4871984-07-17017 July 1984 Expresses Concern Re Proposed Mining Near Power Plant. Residents of Yankeetown Fearful of Addl Damage to Homes. Requests Clarification of NRC Regulations Concerning Const of Plant on Top of Florida Aquifer ML17215A5111984-06-0202 June 1984 Forwards Palm Beach Post 840602 Article Entitled, Error Costly at Reactor, Which Cites Criticisms of Util Re Removal of Thermal Heat Shield.Expresses Concern Re Reserve Capacity of Spent Fuel Pools at All Florida Nuclear Plants ML20087M4381984-02-28028 February 1984 Forwards File Presented to Dade County Citizens Review Committee Objecting to OL Issuance ML20079P2371984-01-27027 January 1984 Informs of Party Intervenor Status Per 831107 Petition & Requests to Be Placed on Svc List ML20086Q8251983-12-0202 December 1983 FOIA Request for Documents Re Proposed NSHC Determination on Proposed Amends to OLs 1990-07-07 |
Text
- p, . v y. '
N O
- , 4 ._ ml Civ 1
" 210 ::.ii. 1Cth Terrace Gainesville, Floria 32601 8005130 h h FREEDOM OF INFORMATION Director Office of Adminictration ACT REQUEST H.R.C.
tlachington, D.C. 20555 NM~8O~/fC gi Lear Sir or Maden Pttrcuant to 5 United Statec Codec, Section 552, (The Freedom of Infomation Act), I am fomally roquesting the following infomation on the Cryctal River 3 Huclear Power Plant owned by the Florida Power Corporation, whose corporate headquarters is located in St. Petersburg Florida. I aa also requesting come infor mation on the Turkey Point and St. Lucio Duclear Reactorc ovmod by the Florida Porter and Light Corporation based in Miami, Plorida.
- 1. All doendientonof correspondence .orf.analycio_reldtinc to urfoty, malfunctioning equilmient or equilnent cyctema, envirouacnTal impacts, or costo in economic temc, for all reportable occurences, cafety violations, or recognicable accidents that have occurred since Cryctal River 3 went on line in 1977.
- 2. Infomation relating to transportation routes of nuclear waste through the State of Florida from the Turkey Point Huelcar Power Plant, the St. Lucie Huclear Power Plant, and the Crystal River Huelcar Tower Plcnt.
- 3. Infomation relatine to economic cocto, environmental impacto, and public cafety, for tfle decommiccioning of the Crystal River nuclear: Power Plant. ,
- 4. Infomation relating to the economic cocto, the long and chort tem planc for, and the environmental impact of, on-cicht storago of nuclear wastos at Crystal River 3.
- 5. A lict and description of all rederal granto by the H.R.C. to the University of Florida .at Gaincav111c 's Huc1 car Encinocring 1)cpartment no #vdcu T4ysM83 Depu tacNf.
! 6. Informa cion on radiation Icycla, radiation contamination, or unusual dicence occurences that arc radiation related te hun anc, l c11ualc, plants, or food within a 50 mile radiuc of Cryctal River 3.
l l Purcuant to 5 United States Codec, Section 552, I c::r.ect l a reply within 10 working days.
Since thic request ic in the public interect, I am hereby requechj a feo waiver. If you will not grant this waiver, I would like to be infomed why.
Sincerely, g , ,
g~$'k Dj I HichaeI Give