ML19323B447

From kanterella
Jump to navigation Jump to search
Forwards LER 80-013/03L-0
Date released: 12/03/2019 Download: ML19323B447


LER 80-013/03L-0:on 800407,during Reactor Trip of Offsite Power,High Pressure Injection Was Manually Initiated & CV-1227 High Pressure Injection Valve,Loop B Failed to Open on Demand.Caused by Stuck Engaging Lever
ML19323B448
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 05/05/1980
From: Bramlett L
ARKANSAS POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
Download: ML19323B448 (1)
Forwards LER 80-013/03L-0
ML19323B446
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 05/05/1980
From: Trimble D
ARKANSAS POWER & LIGHT CO.
To: SEYFRIT K V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
Download: ML19323B446 (1)