Text
_ _ _ _ _ - - _ _ - - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
8005120253 A
! >R HIG t
D4
'o, UNITED STATES
[ j 3..," j(. g NUCLEAR REGULATORY COMMISSION q*\\
C WASHINGTON, D. C. 20555 j
%. ;;[. -[
t mnm Docket No: 50-341 APPLICANT:
Detroit Edison Company FACILITY:
Enrico Fermi Atomic Power Plant, Unit 2
SUBJECT:
SUMMARY
OF MARCH 25, SITE VISIT On March 25, 1980 we met with representatives of Detroit Edison Company and its contractors at the Fermi 2 site. The purpose of the visit was to view the piping systems in the plant. Special attention was given to the small diameter lines outside containment. The staff and its contractor, Oak Ridge National Laboratory, will perform a confinnatory stress analysis of one or two of these lines after reviewing a set of isometric drawings to be provided by the applicant.
We also discussed the methods that the applicant used in seismically analyzing its piping.
A list of attendees is enclosed.
G\\f4 u
't UM Lester L. sintner, Project Manager Light Water Reactors Branch No. 1 Division of Project Management
Enclosure:
As stated cc:
See next page 1
l i
l J
Dr. Wayne H. Jens Dr. Wayne H. Jens Assistant Vice President Engineering & Construction Detroit Edison Company 2000 Second Avenue Detroit, Michigan 48226 cc:
Eugene B. Thomas, Jr., Esq.
Mr. Jeffrey A. Alson LeBoeuf, Lamb, Leiby & MacRae 772 Green Street, Building 4 1333 New Hampshire Avenue, N. W.
Ypsilanti, Michigan 48197 Washington, D. C.
20036 David E. Howell, Esq.
Peter A. Marquardt, Esq.
21916 John R Co-Counsel Hazel Park, Michigan 48030 The Detroit Edison Company 2000 Second Avenue Mrs. Martha Drake Detroit, Michigan 48226 230 Fairview Petoskey, Michigan 49770 Mr. William J. Fahrner Project Manager - Fermi 2 William J. Scanlon, Esq.
The Detroit Edison Company 2034 Pauline Boulevard 2000 Second Avenue Ann Arbor, Michigan 48103 Detroit, Michigan 43226 Mr. Larry E. Schuerman Licensing Engineer - Fermi 2 Detroit idison Company 2000 Sec]nd Avenue Detroit, Michigan 48226 Charler, Bechhoefer, Esq., Chairman Atomic Safety & Licensing Board Panel U. S. Nuclear Regulatory Commission Washington, D. C.
20555 Dr. David R. Schink Department of Oceanography Texas A & M University
/
College Station, Texas 77840 Mr. Frederick J. Shon Atomic Safety & Licensing Board Panel U. S. Nuclear Regulatory Commission Washington, D. C.
20555
~.
4 ENCLOSURE LIST OF ATTENDEES NAME ORGANIZATION I
R. M. Stephens NRC P. A. Barret Region III Inspector R. Hammond NRC W. A. Nelms ORNL E. Rodabaugh NRC B. H. Little NRC D. A. Myers NRC G. Curtis Daniel G. M. Slaughter ORill E. H. Randa GE G. E. Moore ORNL R. K. Nanstad ORNL L. L. Kintner NRC M. S. Williams Detroit Edison R. Adler Detroit Edison J. H. Casiglia Detroit Edison
- H. A. Walker Detroit Edison i
L
7FAA7 6
MEETING
SUMMARY
DISTRIBUTION LWR-1 Docket File-APit ': 1 1930 NRC Participants NRC PDR Appropriat,e IE Regional Offices local PDR VE
.ZZZ' TIC NRR Reading LWR 1 File g.g m '
f f W //{ %
e H. Berkow
,$hW D. Ross D. Vassallo
~
J. Stolz
/7, 9 G M i' R. Baer Caseload Forecast Panel Meetings Only
- 0. Parr L. Rubenstein J. Rothfleisch S. Varga T. Abell C. Heltemes G. Matthews L. Crocker W. Lovelace B. Kirschner S. Boyd F. Williams H. Berkow R. Mattson L. Schaub R. DeYoung Trip Participants Project Manager Attorney, ELD E. Hylton IE (3)
ACRS (16)
R. Denise 9