ML19323A905

From kanterella
Jump to navigation Jump to search
Supplements 800411 Responses Re QA of Diesel Generator Fuel Oil.Present QA Program Will Administratively & Internally Control Fuel Used to Makeup Diesel Fuel Oil Storage Tanks. Program Will Be Fully Implemented by 800901
ML19323A905
Person / Time
Site: Crane  
Issue date: 04/30/1980
From: Herbein J
METROPOLITAN EDISON CO.
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
TLL-196, NUDOCS 8005060272
Download: ML19323A905 (1)


Text

_

8005080 2 72 p

Metropolitan Edison Company f

Post Office Box 480 (j

Middletown, Pennsylvania 17057 717 944-4041 Writer's Direct Dial Number April 30, 1980 TLL 196 Office of Nuclear Reactor Regulation Attn:

D. G. Eisehnut, Director Operating Reactors Branch No. 4 U. S. Nuclear Regulatory Commission Washington, D.C.

20555

Dear Sir:

Three Mile Island Nuclear Station, Units I and II (TMI-1 and TMI-2)

Operating License Nos. DPR-50 and DPR-73 Docket Nos. 50-289 and 50-320 QA of Diesel Generator Fuel Oil This response is submitted to supplement our responses of April 11, 1980 (TLL 164).

Metropolitan Edison is implementing a quality assurance program for fuel oil to administratively control internally the fuel used to make up to the Diesel Generator Fuel Oil Storage Tanks for each unit. The make up fuel oil will be sampled for specific or API gravity, water and sediment,and viscosity, i7 The results of these analyses will be reviewed by Quality Control inspectors to be acceptable prior to making up to the Diesel Generator Fuel Oil Storage Tanks.

This " limited scope" QA program is expected to be fully implemented by September 1, 1980.

Sincerely,

/

o J. G. Herbein Vice President TMI-I JGH:LWH: hah cc:

J. T. Collins

&/

5 ll0 Metropohtan Ecson Company is a Member of the Genera! Puchc Utd$es System l