ML19323A573

From kanterella
Jump to navigation Jump to search
Inquires Whether ECCS for PWRs Have Been Changed Following TMI Accident,List of Changes,Reasons & Analytical Basis & Repts on Changes
ML19323A573
Person / Time
Site: Crane 
Issue date: 02/22/1980
From: Webb R
AFFILIATION NOT ASSIGNED
To: Mattson R
Office of Nuclear Reactor Regulation
Shared Package
ML19309E382 List:
References
NUDOCS 8004210399
Download: ML19323A573 (1)


Text

.

.-q Q

0 February 2?, 19 C D

4 Dr. Roger ~Iattson 91 Director

/

(t5)

Nuclear System Safety Division U.S.

Nuclear Regulatory Commiscion

!ashington, D. C.

20555

Dear Dr. "attson:

An article which appeared in the Manchester Guardian, October 25, 1979, by *:. Ehoja Etemad, who is supposed to be a nuclear engineer and expert in twoyhase flow in France, and who is an authority, it is alleged, on 'lestinghouse design PWRs, alleges that as a rescit of the Three Mile Island Acciden t (possibly) " plant af ter plant is now being re-equipprd with a more powerful safety injection system. "

Is it true that after TMI occurred, that is, after March 28,1979, the safety injection-systems are being changed to provide for a more powerfal emergency coolant injection, which injects coolant at a greater rate of flow or with a greater reservoir of coolant, or both or whatever?

I would like to know whether the emergency core cooling systems for P!Rs*have been changed in any way after the TMI accident occurred and what are the changes, if any, and what are the scientific and technical reasons and analytical basis for such changes and have a copy of the pertinent appr5pria*H reports related to such changes.

Sincerely yours, PW' *!"Y

~

  1. hm Richard E. ?iebb, Ph.D.

SM1 M ou+d c.E.

2858 111 st.

Toledo, Ohio h3 ell (E19) 729-2324 80 0.4 g3 og g 9

,/