Responds to NRC Re Util Participation in ORNL on-line Analyzer Program.Complete Analyzer Sys Should Be Installed by 800630.Forwards Util Procedure CO-SQNP-SAP, Startup Test Program
ML19323A420
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 04/11/1980
From: Mills L
TENNESSEE VALLEY AUTHORITY
To: Rubenstein L
Office of Nuclear Reactor Regulation
Shared Package
ML19323A421 List:
References
NUDOCS 8004210202
Download: ML19323A420 (1)


Text

_____

400 Chestnut Street Tower II April 11, 1980 Director of Nuclear Reactor Regulation Attention:

Mr. L. S. Rubenstein, Acting Chief Light Water Reactors Branch No. 4 Division of Project Management U.S. Nuclear Regulatory Commission Washington, DC 20555

Dear Mr. Rubenstein:

In the Matter of the Application of

)

Docket Nos. 50-327 Tennessee Valley Authority

)

50-328 In your January 28, 1980, letter to me, you requested that TVA participate in the Oak Ridge National Laboratory (ORNL) On-Line Analyzer program and document the management review process by wnich TVA concludes that Sequoyah is ready to begin testing and operation.

The responses to your requests are provided below.

TVA has been working with ORNL employees to identify the process parameters that will be monitored by the On-Line Analyzer and to resolve interfacing problems between the ORNL computer and existing plant equipment.

The installation of the ORNL On-Line Analyzer will not affect the safe operation of Sequoyah Nuclear Plant because all interfaces with the plant protection system will be through exist-ing isolation devices. A tentative date for complete system instal-lation is June 30, 1980.

TVA procedure CO-SQNP-SAP establishes guidelines for the Assistant Director of Nuclear Power (Operations) in providing guidance for the conduct of the Sequoyah startup test program and approval for entry into specific test phases.

These test phases include fuel loading, initial criticality and zero power tests, special low power tests, 30 percent power, 50 percent power, 75 percent power, 90 percent power, and 100 percent power.

Significant items that must be addressed before the assistant director's approval are provided in this procedure.

Ten copies of this procedure are enclosed for your review.

If you have any questions, please get in touch with M. J. Burzynski at FTS 854-2581.

80N 5

Very truly yours, gj N

$.Cf.5-TENNESSEE VALLEY AUTHORI" E(.

X 1?.h.

m?4 I

I L. M. Mills, Ma ager 75ur/h) 4-3 i

i Nuclear Regulation and Safety 8004 b N N %

Enclosure (10) m004210 % D j