ML19323A195
| ML19323A195 | |
| Person / Time | |
|---|---|
| Site: | Wood River Junction |
| Issue date: | 01/21/1980 |
| From: | Gregg R UNC RECOVERY SYSTEMS, UNITED NUCLEAR CORP. (SUBS. OF UNC, INC.) |
| To: | Partlow J NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS) |
| References | |
| NUDOCS 8004180046 | |
| Download: ML19323A195 (3) | |
Text
- ____ ___-___
f
~
~$EO Uf1C RECOVERY SYSTEMS
~
Jsi n f United Nuclear Corporation One Nanagansen Trail Tetghone 409364-72 UnC A UMC RESOURCE 5 Company Wood RiverJ' g g '*iand 02894 e
s RECEIVED Jy tf l
8 0 580 y :
. y I,5[**'"~r yf January 21, 1980 MQA:
80-10 s
a
/
6 M
U.S. Nuclear Regulatory Commission James G.
Partlow, Chief Material Control and Accountability Licensing Branch Division of Safeguards Washington, D.C.
20555
Reference:
- Letter, R.
J.
Gregg to James G.
- Partlow, MQA:
80-08 dated January 17, 1980 Gentlemen:
The referenced letter transmitted a revision to Section 5.4 of the UNC RS FNMC.
We note that the page revision number was in error, and are transmitting a corrected page with this letter.
Our apologies for any inconven-ience this error may have caused.
Very truly yours, R.
J.
Gre g Manager, Quality Assurance
~
~ ~ ~ ~ ~
RJG: maw Enclosure cc:
C.
E. Bowers J. H. L'Heureux
,. v?
,1 i
- 7...;
e w-s ;. -
1can 6*.Yd 8004180
}
9 sc
505-2 Chenga 7 5.4 Schedules for Inventories Physical inventories of high-enriched uranium shall be per-formed at intervals not exceeding 65 days, with a minimum of six inventories per calendar year.
Inventories of low-enriched uranium will be performed at intervals not to exceed 210 days with a minimum of two inventories per calendar year.
5.5 Preparations for Inventories Special procedures for conducting the Physical Inventory are as follows:
5.5.1 Sealed Containers All sealed materials will be entered in the Inven-tory Control Roster.
The roster shall include con-tainer number, job number, description, location, grams uranium, grams U-235, and assay method.
In-process materials will be reduced to a minimum con-sistent with plant operation at cutoff time.
Once listed, a container is frozen until released by the Manager, QA.
5.5.2 Conversion of SNM Efforts will be made to convert as much in process material as possible to ADU or uranium oxide, which can be readily sampled, weighed', and assayed.
All' material will be measured by weight or volume, after a thorough mixing in its container, and assayed.
5.5.3 Process Containers All containers used for storage or processing will either be entered into the Inventory Control Roster or emptied and cleaned prior to the cutoff date.
Equipment and containers are inspected to insure that the listing is complete, seals have not been compro-mised, and that each has been entered in the Inven-tory Control Roster.
The roster is then reconciled with the MBA and ICA records and forwarded to QA for completion of inventory calculations under the supervision of the Manager, QA.
Seal and item iden-tific'ations will be listed in coded form as deemed convenient on all inventory records.
5.5.4 Inventory Teams Qualified personnel (a minimum of two individuals working in conjunction with each other) shall be assigned to each inventory team.
. Docket No. 70 - MO "SAFEGUAP.DS AMEND'iENTS"
[.
u.
MC #
>i 6
SG !
30-97 1lilliam 0. Miller License Fee Management Branch MCL3 (Y7 COO M OO5t4
~
Office of Administration PSL3
@N MATERIALS SAFEGUAP.DS AMENDMENT CLASSIFICATION at-Applifcant UNC-h/RT T1 License No:
SN t1- ~f 77 Fee Category:
Application Dated:
t /;;t t / 20 Received:
l/38/8 0
'_ i i
e Applicant's Fee Classification:
m,.
g:.4f E,y_
The above application for amendment has been reviewed by the NMSS' Division of Safeguards in accordance with Section 170.31 of Part 170 and is classified as follows:
1.
Safeguard amendments to licenses in fee Categories lA through 1H (a)
Major Safeguards p.-
ty.n :-
(b) flinor Safeguards
!. E."$.
(c)
Safeguards (Categories ID through.lG only)
(d)
Administrative I
2.
Justification for reclas,sifi' cation:
-W:
8p'n.
Mbb 3.
The application was filed (a) pursuant to written *!RC request and the amendment is.being issued for the convenience g
of the Commission, or -(b)
X Other (State reason):
Acd ko% \\
s1. f fn l fo r ex i s fin ct I
u J
clasnPwd ne%.,arsla as c1 cnw
~
J 10, T2 (c) ch o.- ro ukA
'u s e x n o l-Q_
)
J
\\
\\
/
's j
h?
Signature:
/f E'
Y kbd f~
Division of f ouards, NMSS Date:
[ [h
/' T I
_-...,___.=.'. u..=.e :.t. :.;.m..e -
.,_....:..c..~,-1...-
s.'
h