ML19322E650
| ML19322E650 | |
| Person / Time | |
|---|---|
| Site: | 07106387 |
| Issue date: | 01/21/1980 |
| From: | Ross D ENERGY, DEPT. OF |
| To: | Macdonald C NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS) |
| Shared Package | |
| ML19322E651 | List: |
| References | |
| 15295, NUDOCS 8004020055 | |
| Download: ML19322E650 (6) | |
Text
L ll-b3f7 gn k
co#
Department of Energy q
Washington, D.C. 20545 s
9-RECEIVEDs i
t,$fpnap.230,j,
,{
"2
.. ~
Mr. C. E. MacDonald, Chief k.
~.013,[,
9 Y,
d-Transportation Branch
\\ 4, Division of Fuel Cycle and
' g~g Material Safety U.S. Nuclear Regulatory Commission Washington, D.C.
20555
Dear Mr. MacDonald:
Last summer NRC completed the SARP review for USA /6387/BF (DOE-RL) and issued the flRC 4th revision certificate of compliance. The packaging continues in use by licensees under the flRC certificate and by DOE contractors under the enclosed certificate issued by Richland Operations Office.
The enclosed certificates and engineering summaries are forwarded to complete your records.
Sincerely,
$&(Vd.
W Donald M. Ross, Chief Occupational Safety Branch Operational and Environmental Safety Division 2
Enclosures:
1.
Certificate of Compliance (8 cy.)
r 2.
Engineering Summaries (8 cy.)
{
f cc:
Rick Rawl, DOT - 1 cy. of each i
N 1
[
- s. c.
$$ $'fiQ]fjif
/
15295 8004020055 I
- -