Responds to IE Bulletin 79-25, Failures of Westinghouse Bfd Relays in Safety-Related Sys. Relays Not in Use in Facility Design.Review to Discover If Class IE Contracts Contain Westinghouse Relays to Be Completed by 800229
ML19322E443
Person / Time
Site: Washington Public Power Supply System
Issue date: 02/11/1980
From: Renberger D
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Engelken R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
IEB-79-25, NUDOCS 8003280090
Download: ML19322E443 (1)


Text

W T/c_

P P W shington Public Power Supply System A JOINT OPERATING AGENCY S

,o...... 2000 c.o w........w., ,,,c,,u~ w.....o~. 3sz e~o~. < so.> 3 7 s sooo February 11, 1980 G01-80-66 Docket Nos. 50-460 and 50-513 4

- \,

\ .s

%' . a Mr. R. H. Engelken, Director ')

U.S. Nuclear Regulatory Commission _1 Suite 202, Walnut Creek Plaza /N/

1990 N. California Boulevard Walnut Creek, California 94596 [,./ ../

SUBJECT:

WPPSS NUCLEAR PROJECT NOS.1 & 4 IE BULLETIN 79-25, " FAILURES OF WESTING-HOUSE BFD RELAYS IN SAFETY-RELATED SYSTEM 3"

Dear Mr. Engelken:

The following is a response to the subject IE Bulletin:

At the present, WNP-1/4 is neither using nor intending to use BFD relays in their design. UE&C,the Architect Engineer for the projects,is completing a review to see if any Class IE contracts contain Westinghouse ~BFD relays. Completion of the review is scheduled for the end of February 1980. ,

Very truly yours, OA bdiccp D. L. RENBERGER ASSISTANT DIRECTOR TECHNOLOGY DLP,: FJ:crw cc: U. S. Nuclear Regulatory Commission Office of Inspection & Enforcement Division of Reactor Operations Washington, D.C. 20555 g () O 3 2 8 0030