ML19322D964
| ML19322D964 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 03/04/1980 |
| From: | Lehman L METROPOLITAN EDISON CO. |
| To: | Leech P Office of Nuclear Reactor Regulation |
| References | |
| TLM-042, TLM-42, NUDOCS 8003120585 | |
| Download: ML19322D964 (3) | |
Text
5 o
METROPOLITAN EDISON CO M P A N Y sooooi.,y o, coa.i gooii u:iiiii., co,oo,. tion Subject PROGRAMMATIC ENVIRONMENTAL IMPACT STATEMENT Location TMI Date March 4, 1980 To File TLM 042 During the site visit of Paul Leech and Oliver Lynch, with several ANL personnel, the attached list of drawings were hand-carried from the site.
1 1
iq
/
v% W WW
/
d L g ~Lb.hman, Jr.
Licensing Engineer LJL: hah cc:
J. R. Thorpe /E. G. Wallace (w/o enc.)
E. D. Fuller (w/o enc. )
= = W % u h ulmTclosurek_.
J. T. Collins (w/ enclosure)
R. M. Milford (w/ enclosure) o Y6I\\
INTER-OFFICE MEMDRANDUM Q
80031 g o 585
Attachm:nt 1 TDi 042 BURNS AND ROE HAND CARRIED DRAWINGS Drawing No.
TITLE M166 Fuel Handling Building General Layout M167, M168, M169, Turbine Building General Layout M170, M171 M172, M173, M179 Auxiliary and Fuel Handling Building General Layout M183 Emergency Diesel Generator A & B Arrangements E013 480 Volt Distributor - One Line Diagram E015 4160 Volt Switchgear - One Line Diagram M140, M161, M162, M163, Auxiliary and Fuel Handling Building General M164, M165 Arrangements - Various Levels 2035 Flow Diagram:
u+ ay Heat Closed Cooling Water 2026 Flow Diagram: Spent Fuel Cooling 2024 Flow Diagram: Reactor Coolant Make Up and Purification M006 Flow Diagram: Auxiliary Building and Fuel Handling Building HVAC M014 Flow Diagrau: Fuel Pool Waste Storage M021 Flow Diagram: Long Term OTSG Cooldown
~
M022 Standby Pressure Control System M030 N2 Standby Pressure Control System M217 Plant Filtration System 2060, 2061, 2062 Reactor and Containment Building Floor Plan (Elev. 282', 305', and 347')
2063, 2064 Reactor and Containment Building (Sect. A-A, B-B, C-C, D-D, and E-E) 2065 Auxiliary and Fuel Handling Building Floor Plan (Elev. 258' and 280')
2066 Auxiliary and Fuel Handling Building Floor Plan (Elev. 305')
2067 Auxiliary and Fuel Handling Building Floor Plan (Elev. 328')
e
.e
, DRAWING NO.
TITLE 2068 Auxiliary and Fuel Handling Building Floor Plan (Elev. 347')
2069 Auxiliary Building (Sect. A-A, B-B) 2070, 2071, 2072 Fuel Handling Building (Sect. C-C, D-D, E-E) 2290 Reactor Building Lay Down Plan 2204, 2203 Reactor Building Emergency Spray System 2046 Reactor Building Normal Cooling-Flow 2037 Flow - Fire Protection I
e e
i 6
.i g
1 e
o e
a y
=
-rT 4
w e
rv ^ - -
r