ML19322D672
| ML19322D672 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 02/11/1980 |
| From: | Wilson R METROPOLITAN EDISON CO. |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| References | |
| TLL-045, TLL-45, NUDOCS 8002200414 | |
| Download: ML19322D672 (1) | |
Text
_ _ _ _ _ _
MS
.3
,e av e
-,, j
, J,- l j l J
^
JJ f
i n [..,
3 i
w j
- M
,- 1 1
- 1. 30 ill G '. 3
--I c., ' ' ; : r _ it
- i:
Je
- . r c-p 1 9, m.
' tar
- 1..n
'i cir jlatery C.
i
.in tea, D.C.
20335 a
J ' tr Si r:
Th rea "ile L:1..nd ucle a r S ta t ion, l'ni t II (05-2) 0;e r'.t ing '.ic a ns e ';o. D PR-7 3 b.:h e r Nc. 50-320 Ce -itments "ade in Res cn3e to NoLice of ViolaLica and Notice of Propcsed Tssuance of Civil PMalties Dited Decc.ber 5, 1979 l
In the carrective action described for apparent nonceapli ince 10.3 of the title letter, a commitment was made to conduct a review of certain e:-:pasure reco rds by January 1980. A study of our files has shown that we had previously
.de the sane conmitment in letter CQL 1362, which addressed required lie, :see actions as a result of Investigative Report No. 50-320/79-10.
This 1-et t er. as dated Oc tober 29, 1979 and corr.itted to complete the review by the end of January,1930 and to have verifled in NRC Form 5 by the end of February, 1980.
hile we have been working toward this February completion date, the day to lay workload in the area of health physics has beceme a full time job far our current staff. The review of records that we were planning to document by the end of February has slipped by some amount, which has not yet bee' determined. We are currently involved in on-site discussions with Jol Collins of the NRC ained at arriving at a autually acceptable date for both the NRC and the licensee. The tentative date we are discussing is April 30, 1980.