MEETING WITH SCHULTZ -- 10-25-79 The issue -- growing from allegations Our approach -- 3 questions:

a) Were there incentives b) Were adjustments in the schedule made so as to be in a position to obtain incentives (inference of communication) c) Did those adjustments compromise the safety of the unit?

Summary of conclusions (see exec summary in draf t outline)

Why a consultant:

1. To advise us even before serious writing has begun as to whether we have overlooked possible incentives, indicia of rush or other data
2. If so, to advise us where to gather necessary data
3. If not (and time is short) to assist us in technical review of 2 major indicia of rush:

a) Replacement of Lonergan M.S. Relief valves on c* path b) Adjustments made to power ascension test program (self-imposed tests, initial warranty run deleted)

4. To also provide experience based on other nuclear units
5. Ultimately -- perhaps not until draft report is written and fully thought-out -- would want advise on whether conclusions, implications and recommendations are well reasonad and supported by investigation.

Specifc areas / questions:

1. What is experience on other units re: financial incentives and pace of construction / completion?
2. What importance is attached to unit accepetance test / initial N3. Is it common for nuclear utilities to include tests beyond warranty run? Do all vendors have such a contractual test?

FSAR or NRC-mandated tests? Common to delete?

- 4. What of C* path planning for Lonergan valves? What of superiority of design (double porting)?

5. What of pool pressures? Dieckamp has dismissed but wouldn't

$23/'w be significant?

6. Based on experience with util execs, how far does knowledge of financial incentives sink?
7. Is there a reason to be concerned about economic impact on safety?
x. Please be sure to raise questions concerns, etc. at any time.

~

Define your relationship to us as you perceive need, so long as proper contract is broad enough.

R Tc st Se74enCA VI. SCh d'Ab -

800218006/