ML19322D446

From kanterella
Jump to navigation Jump to search
Requests NRC Approval for TMI-1 Restart.Company Faces Substantial Increase in Util Costs Due to Closing of Facility.Pa Electric Co States That TMI-1 Is in No Way Involved W/Problems Experienced by TMI-2
ML19322D446
Person / Time
Site: Crane  
Issue date: 08/14/1979
From: Shone E
OWENS-ILLINOIS, INC.
To: Hendrie J
NRC COMMISSION (OCM)
Shared Package
ML19322D445 List:
References
NUDOCS 8002120715
Download: ML19322D446 (1)


Text

.

OWENS-ILLINOLii c.csure oneson August 14, 1979 6

Ea Honorable Joseph Fendrie animan U.S. Nuclear Pegulatory enmission Washington, D.C. 20555 Mr. Gnimm:

Owns-Illinois, Inc. operates a efncturing facility in Brookville, Pennsylvania producing Closures for a full line of contairars used for packaging foods, drugs and Mr=1=.

We e cloy more than 250 people at this plant.

We haw been advised by ct= pomr supplier, Da Pennsylvania Electric Cocpany that a will face a substanM21 increase in cost with a continued delay in the utilities cf Ye ropolitans Edison Cocpanys' DI-1 Nuclear Generating Statica at 'H=ee 'H.le Is's.d.

Em acwr cc::pany advises us 6.at the DI-l was in no way involved in the prob [e:n as emerienced by -he D'-2 t=it and that a DI-1 maintenance cFack has been cocpleted and me s all N.R.C. safety standards.

We ft=ther tnderstand that all oder units in the cotnery designed by Babcock and Wilcox have receiwd N.R.C. %wral to operate.

We urge your support in 9,wving this t=it for operation so that ot:

Brockville Plant can pt= chase pom at the least cost available to us to allcw us to continue ope:Hm in this hip.ly cocpetitive industry.

Fespectfully, CkUS TTT TNOIS, INC.

"9

/

Gd. 7if W

E.M. Shcne Plant Manager i

DS/ pet I

cc: lee Nelson - OIB - Fain 1

John Woellrar - OIB - 3 l

R.M. Canup - OIB Pain 1

I 3002188 d

Post Cthce Scx 279 Srovme. Penne,. r.: 5525 :214: 849 3c:.

,