ML19322D234
| ML19322D234 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 07/15/1976 |
| From: | Case E Office of Nuclear Reactor Regulation |
| To: | Gossick L NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO) |
| References | |
| RTR-REGGD-01.020, RTR-REGGD-01.032, RTR-REGGD-01.052, RTR-REGGD-01.064, RTR-REGGD-01.089, RTR-REGGD-01.094, RTR-REGGD-1.089, TASK-TF, TASK-TMR NUDOCS 8002100077 | |
| Download: ML19322D234 (2) | |
Text
0.0RP k j'
%g UNITE 3 STATES c
~1 NUCLEAR REGULATORY COMMISSION
% bung'.,j 3.(1 WASHINGTON, D. C. 20555
=
(-
SJ h
p JUL 151976 Lee V. Gossick Executive Director for Operations REGULATORY REQUIREMENTS REVIEW COMMITTEE MEETING NO 50, JUNE 24,1976 The Comittee reviewed the PROPOSED REVISION TO STANDARD REVIEW PLAN 5.4.7 RESIDUAL HEAT REMOVAL SYSTEM and recomended approval subject to the following coments:
a.
The provisions of the Branch Technical Position RSB-5-1 should be effective imediately and utilized in current reviews of CP applications.
b.
The-decision whether or not to prepare a Regulatory Guide l
on this subject was left to the staff.
4
~
The Comittee characterized the backfit implementation considerations of this proposed BTP as Catagory 2 -
Further staff consideration of individtf8TTases required in order to determine the need for backfitting.
The remaining items 2 and 3 of the agenda were deferred to the next meeting.
a w
Edson G. C&1ie Chairman, Regulatory Requirements Review Comittee l
cc:
B. Rusche cc:
V. Stello cc:
L. Rouse S. Hanauer H. Denton PM AD's H. Kouts B. H. Grier SS AD's E. Volgenau H. Shapar OR AD's D. Knuth F. Schroeder SSSEA AD's i
R. Minogue S. Varga J. Davis T. Rehm R. Soyd M. Grossman R. Heineman R. Cunningham 80021000 77 A
~~
INDEX OF D9ACT VALUE STATEMENTS FOR CY-1976 M.
1.
Proposed Regulatory Guide 1.XX. QUALITY ASSURANCE REQUIRE!"ENTS 9'
FOR I!!STALLATION. INSPECTION AND TESTING OF MECHAtlICAL EQUIPMEtiT AND SYSTEMS -- 1/9/76 2.
Regulatory Guide 1.52 (Revision 1). DESIGN. TESTitlG ATID MAINTENANCE fd.4 CRITERIA FOR E?iGI!!EERED-SAFETY-FEATURE ATIOSPHERE CLEANUP SYSTEM
'q,p M'
AIR FILTRATION At!D ADSORPTIO!! IftITS OF LIGHT-WATER-COOLED iiUCLEAR POWER PLANTS. -- 179/76 3.
Proposed Revision 1 to Regulaton' Guide 1.32 (DS 535-5). CRITERLt N FOR SAFETY RELATED ELECTRIC PO!!ER SYSTEMS FOR NUCLEAR POWER PLANTS M
1/9/76 4.
Proposed Revision 2 to Regulatory Guide 1.64. QUALITY ASSURATICE lh M42 REQUIRE!ENTS FOR THE DESIGN OF flUCLEAR POWER PLAtlTS -- 1/9/76 5.
Proposed Revision 2 of Regulatory Guide 1.20. COMPREHEllSIVE M A.p U VIBRATION ASSESSME!!T PROGRAM FOR REACTOR IttTERNALS DUEISG '
PREOPERATIONAL APID INITIAL STARTUP TESTI!!G -- 1/9/76 Pmposed Regulaton Guide 1.94 " QUALITY ASSURNICE REQUIREMENTS FOR k 6.
INSTALLATION. INSPECTION AND TESTING OF STPJJCTURAL C0!! CRETE Atl0 M'
STRUCTURAL STEEL DURING THE CONSTRUCTI0ft PHASE OF fiUCLEAR POWER PLAtiTS" -- 2/13/76 7.
Proposed Revision 1 to Regulatory Guide 1.89. QUALIFICATION OF CLASS 4
IE EQUIPMENT FOR NUCLEAR POWER PLANTS -- 2/27/76 AMENDMENT TO 10 CFR PART 50 TO REQUIRE PERIODIC UPDAT 8.
-- 2/27/76 9.
WORKI;1G PAPER ON PROPOSED REGULATORY GUIDE ON FUEL DE'ISIFICATION M ("A ',
-- 2/27/76 g%) $
. w,,x,
e 5
4