Suggests Limiting Operation of Reactor to 98% Power,Due to Degraded Signal from Loop a Gentile Flowmeter
ML19322D210
Person / Time
Site: Crane Constellation icon.png
Issue date: 03/26/1979
From: Twilley R
BABCOCK & WILCOX CO.
To: Rogers L
BABCOCK & WILCOX CO.
References
TASK-TF, TASK-TMR NUDOCS 8002100055
Download: ML19322D210 (2)


Text

'

u

_b_.

..vTF. INSTRUCTION NO....__

'NE BABCOCK & WILC0X COMPANY tilSTRIBUTION_

U 3

POWER GENERATION GROUP p

l RESPONSE REQ'D F OM U

j L. C. Rogers, Site Operations Manager, TMI-2 APPROVED M

J/I4'9

/

From f

    • 3'8 R. C. Twilley, Plant Performance Services Section Cust.

File No.

or Ref.

TMI-2 T3.5 Subj.

Date TMI-2 Loop A Gentile Perfomance March 26, 1979 lru.i..................,.....,.

Due to the degraded signal from the Loop A Gentile Flovmeter, B&W reccmmends limiting operation of TMI-2 to 98% FP.

This is based on the fact that data from the device indicates the possibility of a longer delay time than that observed previously.

The delay time may still be within the limit assumed in the safety analysis.

However, additional coastdown data is necessary to confim this. Specifically, A four pump coastdown fro = HZP conditions must be performed. This particular case must be run because a baseline case, prior to the degradation, exists which can be used to detemine, by comparison, any change in delay time. Data should be taken per TP 200.12. Gentfle AP's should be recorded at a minimum of 0.2 sec. intervals along with a means of deter =ining the time of pump trip (1.).

Based on Lynchburg Engineering's evaluation of this data, B&W may be able to justify operation at 100% FP.

m R. C.

ey RCT/fch cc:

D. F. Hallman J. F. Walters R. W. Winks W. H. Spangler J. A. Lind REVigED FOR AgCURACY gg J. R. Bohart ENGINEERING:'[

DATE:.pu./w R.

Records Center

""c!. EAR SERVICEg gg DATE:g/g 8

O

~

i 8002100 0

PG 30306 T.

/_ C bo 62f %

bd

- k. (.

T Wst.LJ rnua ri,ca issuo 1 (nss-u \\

v,

y,,, n a %,aes

=Q a-

  1. % ss TMi-a Lee A

Gaurice huamaau

  1. 1*u 3v. M1 SOLD P4.EASMEELY TO mE ATIACMEMI D AND FORWARD RESPONSE TO NUCLEAR SERVICE TECHNICAt-S'SFCRT, NSSE LYNCHBURG, VA.

W i

n Wla) ha g,h

...,..-,r.,-,,-

e e ~%

'p*,"

.00*

1 l

l l

l O

~

  • 9 w--