Site Problem Rept 254:on 740227,util Lost Nuclear Svc River Water Pump,Loosing Flow to IC Coolers.Sys Temp at Inlet of IC Pumps Rose Above Facility Limits.Ao to Be Written by General Public Utils
ML19322D194
Person / Time
Site: Crane Constellation icon.png
Issue date: 03/11/1974
From: Carr J, Phinnely J
BABCOCK & WILCOX CO.
To:
References
TASK-TF, TASK-TMR 254, PROB-740311, NUDOCS 8002100041
Download: ML19322D194 (1)


Text

.n

~-

, ~.

/

PDS-51091'-2(9-73)

L SITE PROBLEM REPORT BABC0CK & WILC0X CUSTOMER MET ED CONTRACT NO. 620--0005 SPR NO. 254 REV.NO. 0 VEN00R B?nt P.O. NO.

- T ASK NO. ///

GROUP NO. 4/

SEQ. NO.o 7 SITE ENGINEER REQ'O. RESOL.DATE RE0*0. COMP. DATE J. J. CAP.R TITLE 1

j IC SYS INCIDENT DESCRIPTION OF PROBLEM On 2-27 '(1, customer lost Huclear' Service river water pump fhereby loosing j

6 y

4 flow to the IC coolers.

This allowed the system temperature at the inlet of the IC pumps to rise above plant limito (greater than 120 F).

Customer was not aware of problem with the IC Sys. until the high temp. alarm. Max. temp seen by Sys.

unknown at this time, but it is estimated that max. temp. seen by the system was 150 F (_this does not include stators - see SPR 255). Abnormal occurrance j

report is being written by GPU.

STATUS - ACTION TO DATE INCLUDING PERSONS CONTACTED For Information Only 6

FURTHER ACTION RECOMMENDED BY SITE PERSONNEL

/

nn nf aww[

an etwwaewcw swx

/ ESOLUTION/

U l

V APPROVED BY SipH AT,URE DATE z

j y N.S. SUPPORT ENGINEER

' %, /,N ~'

'L...sf 3 TASK ENGINEER S

2

? %

> /

PROJECT MANAGER

  1. f,Md8 1[<s[7(

COST CATEGORY O NORM OC 00 0G OL O VEN00R' CLAIM AUTH. CHARGE NO.

O FIELD CHANGE REQ FC NO.

SITE COMPLETION REPORT O RECOMMENDED STOS. CHANGE 5

]

final OlSTRIBUTION r a;EcT,c.Actr, j

DEVIATIONS O NONE O SEE SPR REV. NO.

s.o.n cosst ute.

0 ATE COMPLETED 3.-p W nM)GFE0 BY g/,p/C/p /.!g, cA Loc. nLE S.O.M./CONSTR. REP. APPR @ J/ M ( g g /).g.