s Metropolitan Edison Company Post Office Box 480 e

Middletown. Pennsylvania 17057 717 9444 041 wnter's Direct Dial Number January 24, 1980 TLL 029 TMI Support Attn:

J. T. Collins, Deputy Director

!.'uclear Regulatory Commission c/c Three Mile Island Nuclear Station Middletown, Pa.

17057

Dear Sir:

Three Mile Island Nuclear Station, Unit II (TMI-2)

Operating License No. DPR-73 Docket No. 50-320 Processed Water Storage Tanks Your letter of December 13, 1979, concerning the " Preliminary Design Critaria for Additional Processed Water Storage Tanks, Revision 1," specifies that dikes be provided as part of the foundation design for the Processed Water Storage Tanks (PWST), to control any liquid spillage from these tanks in the event of rupture.

Our initial design criteria did not include such a requirement based on our analysis that rupture of these tanks would not represent a significant potential for radiological health and safety or environmental hazards, on-site or off.

Since receipt of your letter, we have reviewed this matter further, reexamining the possible need for dikes both from the licensing and radiological protection standpoints.

The technical specification cited in Section 4.3.3 is not the basis for the design of the tanks.

The reason for referring to the Tech Specs was not to imply that these tanks are temporary but to cite the limit for the curie content in the processed water storage tanks.

The processed water storago tanks are not considered as part of the Radwaste Management System as defined by Regulatory Guide 1.143 for the following reasons:

a.

As defined by the footnote on page 1 of the Regulatory Guide, "Radwaste, as used in this guide, neans those liquids, gases or solids containing radioactive materials that by design or operating practice will be processed prior to final disposition."

l l

b.

As stated in the Regulatory Guide, "The radwaste system terminates l

at the point of controlled discharge to the environment... at the point of recycle to the primary or secondary water system storage tanks..."

l i

13002080 Metrocottan Ed: son Comcany is a Memeer of the Generai Pubhc Ut:i.t es System

Processed Water Storage Tanks January 24, 1980 TLL 029 The water being stored in these tanks will have been processed through the radwaste system (EPICOR II/SDS or others) and require no further processing to remove radioactive materials prior to final disposition. These tanks are being installed to permit compliance with the NRC order preventing discharge of accident water from TMI-II, and not as part of Plant Rad-waste Systems.

Our review has reaffirmed our initial analysis that the PWST's need not be provided with extraordinary leakage contral features such as protective dikes because of (he very low isotopic content of liquids to be stored therein. Such provisions would involve unnacessary design complications, delay and expense, and in addition, would futther result in major site space problems possibly compromising total tanxage capacity. Leakage, should it occur, would not pose a significant hecith hazard or environ-mental problem, on or off site. Moreover, the vessels being installed will be of high quality (fabricated to API-650 specifications) and rupture is highly unlikely. A Tank Rupture Analysis was performed using conservative assumptions to show the radiological consequences of such a highly unlikely event. This analysis is provided as Attach-ment 1 and shows that these consequences are well below the acceptance requirements of the applicable NRC Standard Review Plan.

Based on this response and the tank rupture analysis, we request your most expeditious reconsideration and approval in order that construction work may proceed. Should you have any questions, we will be more than happy to meet with you to discuss this issue.

The issue of filters and monitors for the vents as discussed in your letter, will be addressed in subsequent correspondence.

neer ly,

f. \\4. %.___

R. F. Wi son Director TMI-II Recovery RFW:LWH: hah

(

Attachment l

l cc:

R. Vollmer

January 24, 1980 TLL 029 ATTACHMENT 1 Tank Rupture Analysis The subject of a tank rupture is addressed in Standard Review Plan (SRP)

L5.7.3 (Rev. 1) (Attachment 5), " Postulated Radioactive Releases Due to Ciquid - Containing Tank Failures." The SRP addresses itself td'...the consequences of single failures involving tanks and associated components containing radioactive liquids outside containment." The SRP's acceptance criteria is.as follows:

Tanks and associated components containing radioactive liquids out-side containment are acceptable if failure does not result in radio-nuclide concentrations in excess of the limits in 10 CFR Part 20, Appendix B, Table II, Column 2, at the nearest potable water supply...

As used in the SRP, " supply" is defined as follows:

...a well or surface water intake that is used as a water source for direct human consumption or indirectly through animals, crops, or food processing.

Described below are the analyses performed and the results obtained for tank failures as addressed by SRP 15.7.3.

In assessing the consequences of a Processed Water Storage Tank (PWST) failure, the entire contents of one 500,000 gallon tank are assumed to flow via normal drainage into the east channel. The following two cases were studied:

Case 1: Water surface elevation behind the east channel dam is 279 feet MSL (crest elevation of the dam) at the time of tank rupture.

The spillage overtops the dam without any dilution and mixes with l

Susquehanna River flow downstream.

I l

Case 2: Water surface elevation behind the east channel dem is 277 feet MSL (normal pond elevation). The spillage is retained behind the den and allowed to mix with smbient water. Overflow will occur when the water level in the east channel exceeds 279 feet MSL.

This water then mixes with Susquehanna River flow downstream.

i l

The analysis for both cases was carried out under simplifying assumptions 1

that led to conservative results. It was assumed that there was no loss i

of water due to infiltration into the ground and all the water was dis-charged into the east channel. If was also assumed that full mixing of the l

processed water with the Susquehanna River water was accomplished before the I

mixed waters reach the nearest potable water intake. In view of.the exis-tence of a favorable environment for. turbulent mixing, low quantity of processed water in one tank (500,000 gallons) as compared to river flows, availability of over two miles of river to accomplish full mixing, and the release of processed water on the east side of the river with the nearest potable watsr intake on the west side of the river, this assumption is justi-fiable. The initial tritium concentration was assumed as 1.05 uCi/cc (2000 Ci of tritium in 500,000 gallons of water).

cAttcchment 1 Tcnk Rupturo Analysis January 24, 1980 Page 2 TLL 029 For Case 1, the discharge of processed water over the east channel dam was calculated assuming that the entire content of the tank was stored above the crest between the dam and the culvert outlet. This yielded-a head of approximately 0.03 ft. over the dam crest. Using this head in the weir formula, the processed water discharge was found to be 13 cfs. Assuming a steady discharge of processed water and the initial tritium concentra-

' tion remaining undiluted, the final tritium concentration was calculated on the assumption that full mixing was accomplished with Susquehanna River flow downstream. The Susquehanna River flow was estimated from the rating curve at the Goldsboro gage at elevation 279 feet MSL and was taken as only 10,000 cfs.

The analysis shows that the tritium concentration in the river water at the potable water intake af ter full mixing will be less than 0.0014 pCi/cc.

For Case 2, with the water level at elev'acion 277 feet MSL corrasponding to a water volume of 65 million gallons, a dilution with the water between the dam and the culvert reduces the tritium concentration to approxLnately 0.008 pCi/cc. This water is retained behind the dam until the water level exceeds the dam crest (279 feet MSL). At this level the concentration of tritium will be approximately 0.005 pCi/cc. Different values of flow head over the east dam were considered to compute overflow rates and initial tritium concentrations for the overflow. Final tritium concentrations were calculated for each different flow head assuming full mixing with the cor-responding Susquehanna River flows.

Using this method, the highest tritium concentration af ter full mixing will be less than 0.0005 pCi/cc.

The limit specified in 10 CFR Part 20, Appendix B for tritium at the nearest potable water supply is 0.003 pCi/cc. Since the results of the analyses j

meet the LLaits set by the SRP's acceptance criteria, no additional design

/

features are required.

j We would point out two significant areas where the tank failure analyses are conservative. The first of these is that the anticipated tritium con-centration is well below the 1.05 pCi/cc assumed. The second area deals with the volume of water assumed discharged to the river. The SRP states that the analysis is to be based on 80% of the liquid volume, whereas the analyses described above is based on 100% of the liquid volume.

e 9

9 O