Requests Immediate Change to Tech Specs to Verify That Each Sys Produced Negative Pressure of Greater than or Equal to 0.25 Inches of Water in Annulus within 12-s After Start Signal.Proposed Tech Spec Change Encl
ML19322C873
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 06/15/1977
From: Roe L
TOLEDO EDISON CO.
To: Stolz J
Office of Nuclear Reactor Regulation
Shared Package
ML19322C874 List:
References
304, NUDOCS 8001310495
Download: ML19322C873 (3)


Text

1 uS. NUCLEAR REGULATORY Cr 'ISSION OCCKET NUM BE R NRC PORM 195 fc, 3 q b

<2 7 , 3 ,

""""l'"

. NRC'DIST7118UTION POR PART 50 DOCKET MATERIAL FROW DATE OP DOCUMENT TO- Mr. John F. Stolz Toledo Edison 06- W 77 Toledo, Ohio 43652 CATE RECEIVED Lowell E. Roe 06-21-77 l ONOTORIZED PROP INPUT PORM NUMBER OF COPIES RECEIVED l %LaTTER i

K omclN AL occ - [.U NC LA334 PIE D I s i c, A> EB CESCRIPTION ENCLOSU RE Request of change te Tech specs consisting of info. on Surveillance Requirement s with modified Paga 3/4 dated 6-30-77 and furnis a-ing DB-1 Safety Evaluation for request change t a Davis-Besse Unit #1 2 pages 2 pages l

y. . . .

1-PLWT NAME: _ . . ~;.

, DAVIS BESSEE UNIT # 1 jcm 06-22-77 CAFE'iv FQR ACTION /INFORMATION ENVIRUNMENTAL

/1 ASSI'dED ADr V4 4 S.4.//6 ASSIGNED AD: V. MOORE (LTR)

/{ uRANCH GTEFt $ to [2_ BRANCH CHIEF:

[ PROJEC'" MANAGER: M C/v PROJECT MANAGER:

( I LICENSING ASSISTANT: N "U/ N ed LICENSING ASSISTANT:

8 B. HARLESS

) ___ _

INTERNAL DISTRIBUTION 1,/1wer TTLES 3 I .

i SYSTFMS SAFETY 1

, PLANT SYSTEMS SITE SAFEIY &

I/hobii HEINtMAN / TEDESCO ENVIRON ANALYSIS I/i r g y ('2.) SCHROEDER [ BENAROYA DENTON & MULLER

/l n:Tm / LATNA9 c?ftfrWTTTTB iCOSSICK 82 STAFT ENGINEER 13G / IPPOLITO l viMAf tFo M CMT I ?. ROSA ENVIRO TECH.

IVToc / BOSNAK l ERNST a mc? V/ SIHWELL OPERATING REACTORS BALLARD l 9nVn '/ dan.TCKT STELLO YOUNGELCOD ETAENmt'"

040fFE'r VANSCEF7NT R*AC'"0R SAFETf SHA0 _ _ _ . , . . _ . .

c'nynnLT / ROSS BAER .

/ P. COT LTN9 1

/.NOVAK BUTLER / GAMMILL (2) I d unHSmN / ROS2 TOC 2Y GRIMES 1

! IvrLT2 / CHECK - SITli ANALYSIS

/ VOLLMER

~

!/ WTTTrves 97 AT&I  ! / BUNCH SALTEMAN I /, J. COLLINS I RUTSERG i / KREGER I EXTERNAL DISTRIBUTION CONTROL NUMBER l

/ LPDR, Vt. Cfu r'an . ON l 1

/ TIC

~

/ NSIC h

hk b

NAT LAB IREG IV (J. HANCHETT) _

/ 16 CYS ACRS SENT CATEGO RY s

R i s nmu r me-. - --

/l$b =. P O goo /3 / cM i N,

i

. l

~

. 1

. l l

I Gg D' Pl '

s TOLEDO EDISON l

1 f- /

Docket 50-346 6-

] h,l .,. t_7.- .......:

Fsemties Dev.acoment fune 15,1977 m$2 258-5242 pt ,

/p Serial No. 304 h u.L TAI b

C) [*G Director of Nuclear Reactor Regulation Attention: Mr. John F. Stolz, Chief Light Water Reactors Branch No. 1 " " -

Division of Project Management

~ --

. .. _ _ * ' " ' ~

2 c~ -a . , , ' , ,

United States Nuclear Regulatory Commission ~ " ' ' "l- ,[

Washington, D.C. 20555

Dear Mr. Stolz:

The Davis-Besse Nuclear Power Station Unit No. 1 Technical Specifi-cations, Surveillance Requirement 4.6.5.1.d.4 require that we " Verify that each system produce a negative pressure of greater than or equal to 0.25 inches of water in the annulus within 12 seconds after a start signal (is applied to the Emergency Ventilation System.)" Thir Tech-nical Specification was written to assure that the Emergency Ventilation System boundary does not leak more there than the fans are - pable of removing following a LOC /.. It was not written for us to test the starting time of the fans or the valve operating times, as there is a separate Technical Specification 4.3.2.1.3. which checks the SFAS response times. Technical Specification 4.6.5.1.d.4 was written to test the draw down time after 8000 CFM flow was established in the Emergency Ventilation System fans. A strict interpretation of this Technical Specification as it is now written would require that valve and damper operating times plus the fan start time occur in the 12 second response time.

It is therefore requested, as an emergency request, that the change as shown on Attachment 1 be made to the Davis-Besse Nuclear Power Station Unit No. 1 Technical Specifications. Attachment 2 gives the Safety Evaluation for this change to the Technical Specifications.

M THE TCLEDO EDISCN COMPANY EDISCN PLAZA 300 MADISCN AVENUE TOLEDO, CHIO 43652

~

This change is urgently requested to permit continued progression of startup testing and your prompt action is requested.

Yours very truly, i