ML19322C733
| ML19322C733 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 01/08/1973 |
| From: | Schwencer A Office of Nuclear Reactor Regulation |
| To: | Suhrke K BABCOCK & WILCOX CO. |
| Shared Package | |
| ML19322C734 | List: |
| References | |
| TASK-TF, TASK-TMR 760108, NUDOCS 8001220334 | |
| Download: ML19322C733 (3) | |
Text
.
i!JM fy.
u,ntra smus
[
- f. NUCLEAR REGULATORY COf.1MISSl[
' T.' #
... r.cgfl/
,,-,,,c o... c. --
=%
l c
\\,*v t
JAN. 0 81978
\\
j Mr. Kenneth E. Suhrke Manager, Licensing Babcock & Wilcox Company Nuclear Power Generation P. O. Box 1260
/
Lynchburg, Virginia 24505 Decr Mr. Suhrke:
We have coopleted our review of the non-proprietary B&W topical reports BAW-10062, Rev. 1, ":!ultinode Analysis of S=all Breaks for BSU's 145-Fuel l
Assembly !!uclear Plants with Interr.als Vent Valves," ar.d BAW-10074, P.ov.1, i
"Multinode Analysis of Small Breaks for BSW's 205-Fuel Assembly Nuclear Plants with Internals Vent Valves," and BAW-10075 Rev.1, ":hltinode Analysis of Small Breaks for S&W's 177-Fuel Assembly Nuclear Plants with Raised Loop Arrangement and In*ernals Vent Valves." A copy of our m
evaluation is enclosed.
From our review, we conclude that the analytical methods and codels used in these three topical reports meet the require =ents of 10 CFR 50 Appendix X.
The results presented are acceptable for referen:e in l
~
licensing actions, with one exception for BAU-10075 on the 177-FA plant.
This report does not contain results for,the core flood tank lino break.
as do the other reports, but indicates that these results are furnished in the plants' safety analysis reports.
l i
We do not intend to repeat our review of BAW-10062, BAW-10074, or BAW-10075 when these are referenced in Individual licensing actions.
t r
l We request that DEU issue a revised version of these reports within three months of receipt of this letter to include the NRC acceptance letter.
bhkbbhhI
/s G
e 6
g 960/22o33/
-. -.=
-~ ~
[
[.. -
-JAR. 08 t075 A Mr. Kenneth E. Suhrke.
If our criteria or regulations chinge, such that our conclusions regarding BAW-10062, Rev. 1. BAW-10074, Rev. 1 i
we will notify you.and give you oppor,tunity to. revise and, if you de resubmit these topical reports for review.
Sincerely.
a a a a e t- :-
A. Schwencer, Chief i
Light Water Reactors 3 ranch 2-3 Division of Reactor Licensing
Enclosure:
As stated cc w/ enc 1:
l R. Borsun, 25V l
Tennessee Valley Authority ATTN: Mr. James E. Watson Manager of Power 818 Power Building
/
i Chattanooga, Tennessee 37401 Toledo Edison Company ATTN: Mr. Lowell E. Roe l
Vice President. Tacilities Development Edison Plaza 300 Madison Avenue l
Toledo Ohio 43652 1.
l Power Authority of the State of New Tork f
ATTN: Mr. George T. Berry l
Ceneral Manager & Chief Engineer
)
10 Columbus Circle New York, New Tork.10019 i
1
. C l
e
,\\
i I r i '- i f
Q,,. ')jh
[
g 6
{
. s.
1 1
~
JAN,0 81978 6b C
r.
Mr. Kenneth E. Suhrke.
s cc w/enci (cont'd):
Detroit Edison company ATTN: Mr. Arthur B.. Harris Project Manager 2000 Second Avenue Detmit, Michigan 848226 Virginia Electric & Power company ATTN: Mr. Stanley Ragone Senior Vice President P. O. Box 26666 Richmond, Virginia 23261
~
Portland General Electric Comp &ny
~ ~~ -.
ATTN Mr. Joseph L. W1111ms
- - - ~~
.~~.......--
-s-Ylee President Engineering-Construction 621 Southwest Alder Street
~
Portland, Oregon 97205 T-Washington Public Power Supply System s-ATTN: Mr. J. J. Stein
~~
Managing Director P. O. Box 968 3000 George Washington Way T,,
Richland, Washington 9935,2
+
1 g
i I
1 e
.L A O T.' '
u..
..g*_,
. 7 i
t
.*s-
._s.
y 2,
/
E.l M..
" ~~
~
u...-
.~___7_.
, - u ;,.0,b
-m..- *-.5-"***'
4
= '
- V,
........s
==-- *-
--==
l i
,t g wa A
g
-8 9*
\\
g'
- g... 7 =.y.s.
_.