Macropoli:an Edison Co=pany b i ' ' I l E3
~
Gcnaration Review C W tree r
(GRC-2)
January 10, 1979 Mee:ing No. 78-24 The =eeting convened a: 8:30 A.M.in Conference Roo= A.
Present at :his =eeting were:
G. J. Troffer
- Chair =an J. F. Frit:en
- Member D. A, Euff=an
- Me=ber R. N. Prabhakar - Me=ber L. W. Harding
- Me=ber P. A. Levine
- Me=ber I.
Follow Ice =s fro = Previous Meetinz The following ite=s were reviewed and closed during this =ee,:ing.
1.
NCR 78 J. F. Frit:en - This ite= is closed for recording purposes as the acceptance criteria for the closure head stud elongation are correct as specified in the procedure. Follow on action re=aining concerns only =ethods of addressing out-of-colerence values should they be e:cperienced.
C/M 2-0167 - J. 7. Fritzen - As a follow up Jeff vill draft a letter for 2.
GRC-2 Chair =an's signature tc the Station Superintendent that addresses criteria for checking nuclear related olock on Change / Mod. recuest.for=.
3.
C/M 2-0140 - J. F. 7ritzen 4.
C/M 2-0172 - J. F. Fri::en 5
C/M 2-0232 - J. F. Fritzen 6.
C/M 2-0242 - J. F. Fritzen 7.
Audit 78 P. A. Levine - As a follow up Ra= Prabhakar vill investigate
=ethods of control for QC re=cved parts.
The.following ite=s were reviewed but re=ain open pending further investigation:
1.
NCR 78-179 - P. A. Levine - Paul vill continue to investigate into changes required to reduce frequency of re-bar cutting.
2 NCR 78-181 - P. A. Levine - open pending reportability review.
3.
NCR 78-182 - ?. A. Levine - remains opening pending ayereval ef.ney velding Generation Procedures.
/1-e,t-rM6 OW U
II. Written Safa:v Evaluations EXH18tT FOR IDENTIFICATION None were discussed.
BENJAMIN III.
Des 12n Chan2es REPORTERS L.,
The follo ing change =odifications were reviewed and closed during ':his =eeting.
w 1.
C/M 2-0201 Diesel Air Star: Systa=
2.
C/M 2-0221 Pu=p I=peller Mod /WT-R2 Addi:1on 3.
C/M 2-0245 Condensate. 3 coster P.:=p Recire. Piping 4
C/M 2-0255 Back:. ash Line 5.
C/M 2-0267 MU-P-1A/3/C Control Circui:s 8 0 01210 b"/3-
l
. Moating 78-24.
~*
IV.
Tech. Soec. & Cn. License Changes None were discussed.
7.
Nonconfor=ance & Noncemoliance Reoorts A.
NCR"s 1.
NCR 78-171
.P. A. Levine - Reviewed and considered closed.
2.
NCR 78-184 - P. A. Levine - Reviewed and considered closed.
3.
NCR 78-185 - ?. A. Levine - Reviewed and considered closed.
4.
NCR 78-187 - ?. A. Levine - Reviewed and considered closed.
5.
NCR 78-03
- ?. A. Levine - Reviewed and considered closed.
i It was determined that a substitution in material to a " equal i
I to or better than" material being purchased does not ccustitute a change modification requiring GRC-2 review..
3.
LIR's 1.
78-67/3L - reviewed and closed by this committee.
2.
78-68/3L - reviewed and closed by this comnittee.
i 3.
78-70/3L - reviewed and closed by this committee.
4.
78-71/1? - reviewed and closed by this com=ittee.
5.
78-72/3L - reviewed and c' esed by this ce=mittee.
C.
Audits 1.
78 ?. A. Levine - Procurement Document Control (Nuclear) -
this was reviewed and closed for GRC-2 recording purposes.
I 2.
78 ?. A. Icvine - Test Control (nuclear) - this was reviewed and closed for GRC-2 recording purposes.
VI.
Miscellaneous A.
Doc'.nnen er 1.
SOP's, TCN's, and PCR's - D. A. Euffman - The subecc=ittee re? ort is attached to there minutes for your information.
R.
Toeies i
1.
Status of Audit Findings for November -(R. D. 24) ?. A. Levine -
This report was reviewed and is considered closed.
2.
TMI-2 November 7 Transients Meno - TJ. E. Potts - this ite= resd na open.
3.
Concreta Core Drilling Memo (GEM 6170) - G. J. Troffer - this ite=
var incorporated into NCR 78-179 above. This item is closed for GRC-2 record purposer.
tea meeting adjourned at lb:15 A.M.,.Tanuaryi 10, 1979. The next GRC-2 meeting is schedu'.ed for 8:30 A.M. on February 6,1979 in Conference Roc = A.
eme
- d 'em.
'8LUJ T. A. Stanislaw GJT::as GRC-2 Secretary Pile:
62.0012.0003.0004 1
I
y--