Responds to NRC Re Violations Noted in IE Insp Rept 50-346/77-34.Corrective Actions:Personnel Instructed to Keep Connecting Door Between Auxiliary Feedwater Pumps Closed.Instructing Signs Posted
ML19322C615
Person / Time
Site: Crane, Davis Besse  Constellation icon.png
Issue date: 01/05/1978
From: Jeffery Grant
TOLEDO EDISON CO.
To: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
TASK-TF, TASK-TMR NUDOCS 8001180109
Download: ML19322C615 (1)


Text

~

TOLEDO 1

%== EDISON January 5,1978 james S. GRANT Vice Preudent Docket No. 50-346

$*E[',

3, License No. NPF-3 Serial No. 1-8 Mr. Caston Fiorelli, Chief Reactor Operations and Nuclear Support Branch U. S. NRC Region III 799 Roosevelt Road 60137 Glen Ellyn, Illinois

Dear Mr. Fiorelli:

16, 1977, letter Toledo Edison acknowledges receipt of your December 77-34, referencing an apparent and enclosures, Appendix A and reportdeviation from Davis-Besse Nuclear P to the NRC, listed as a " Deviation" in Appendix A.

Following a thorough examination of the items of concern, Toledo Edison herein offers information regarding these items.

in Section Contrary to the licensee's commitment of the FSAR to utilize a pressure Deviation _

A.

3.6.2.7.1.30 feedwater boundary between the two auxiliapf theiconnecting pressure boundary door was 17, 1977.

pumps, found open on October 27.and. November Station personnel were informed on November 17 to keep the Response _

1977, of the requirement and 18, connecting pressure boundary door between the for auxiliary feedwater pumps closed, except In addition, the following signs:

passage.

ENSURE DOOR CLOSED AND LATCHED OPEN ONLY FOR NORMAL

  • 13 TRANSIT ENTRY AND EXIT were attached to both sides of the subject door by December 15, 1977.

Yours very truly,

  • b Sc Fodlitold9 JSC/WHG/cmk TOLEDO. OHIO 43652 300 MADISON AVENUE N _ANY EDISON PLAZA

'