ML19322C594

From kanterella
Jump to navigation Jump to search
Requests Further Analyses to Support Safety Evaluation of Proposed Dual Level Control Setpoints on Steamgenerators
ML19322C594
Person / Time
Site: Crane, Davis Besse  Constellation icon.png
Issue date: 12/04/1978
From: Domeck C
TOLEDO EDISON CO.
To: Lazar A
BABCOCK & WILCOX CO.
References
TASK-TF, TASK-TMR NUDOCS 8001170918
Download: ML19322C594 (2)


Text

.. _.

ATTACli.'5..i! 3.

P T. Tc E o r

b Ub.N05{b TELECOPIED Dece=ber 4, 1978 File:

0274, M-506, M-507, M-538 Babcock & Wilcox Company TBW 5 03: ~

P. O. Box 1260 15 Lynchburg, Virginia 24505 Attention:

Mr. A. H. Lazar Senior Proj,ect Manager

Subject:

Davis-Besse Nuclear Power Station Unit 1 Dual Level Setpoints on Steam Generators For Auxiliary Feedwater System

Dear A1:

At the meeting on this subject in your office on November 27, 1978, it was decided that',further'. analysis is required to support the safety evaluation of the proposed

Please provide analysis and required stea generator levels for the following conditions:

1)

Loss of =ain feedwater flow with reactor coolant pumps running and the reactor at 15% power.

~

2)

Loss of offsite poyer incident and the effects on the pressuriter level at various power levels.

3)

Nor=al reactor trip at low power.

s

4),;Small breaks requiring high pressure injection pump operation with one reactor. coolant pump operating _ or with one or two reactor coolant pu=ps per loop operating.

5)

Rechecking of small break analysis (3AW-10,075A, Rev. 1),

considering interim operation and ulti= ate operation after the

$ dual.setpoint change has been installed.

TECO P3CJECT BaW t:?r.O Nr2 :. -- -

GEC 8 ES SotA t

did.....,_..,,

p,--- ~ ~ ~ ~~ G>.............

p'.,.

THE TCLECO EC'SCN COMPANY ED! SON PLAZA 3C0 MADtSCN AVENUE

'TOLECD, OHr0 23S52

.g.

/-

_2_

6)

Your evaluation as to whether or not reactor coolant pu=p running status should be included in the dual setpoint control logic.

7)

Other analyses that B&W may find are necessary as a result of '

the above.

Please provide a schedule for these analyses and further definition of t.the extent of the analysis. *We have been asked by NRR NRC, to provide.

lthem.vich a written report to supporE continued. operation.(vich operator action) and operation after the dual level setpoint' change has been installed.

e Yours very truly, 0

AA*

e Charles R. Do=eck

~

Nuclear Project Engineer Power Engineering & Construction CRD:FRM db a/12-13 Cc:

E. C. Novak J. D. Lenardson R. E. Blanchong T. D. Murray C. T. Daft M. Malcom I

S I

l I