ML19322C479

From kanterella
Jump to navigation Jump to search
Discusses Encl NRC 790724 Memo.Memo Does Not Accurately Represent Westinghouse Facilities
ML19322C479
Person / Time
Site: 05000273, Crane
Issue date: 07/27/1979
From: Ross D
Office of Nuclear Reactor Regulation
To: Case E
Office of Nuclear Reactor Regulation
Shared Package
ML19322C480 List:
References
TASK-TF, TASK-TMR NUDOCS 8001170809
Download: ML19322C479 (1)


Text

e (luummes= met #

j !!a pn ** cog o

UNI TED STATES

','g

[ \\*

NUCLEAR REGULATORY COMMISSION p

i g,

C WASWNG T ON, D C. 20555 JUL 2 7 1979 NN ADG OD,104 MEMORAf4DUM FOR:

E. Case, Deputy Director Office of fluclear Reactor Regulation FROM:

D. Ross, Jr., Deputy Director, Division of Project Management SUBJ.CT:

flEM0, DEY00 fig TO DEllT0ft " PRECURSOR EVEf4T Ill A FOREIGil kEACTOR" DATED 7/24/79 The subject memo (enclosed) asks four questions plus asks for all relevant information currently available.

I have made the following arrangements :

a.

I will answer questions one and two; most of the discussion wili be contained in our generic W report.

I will send the fo.'eign report to DeYoung.

b.

floseley, IE, will handle the part 21 question, and answer question 3.

c.

Faulkner, IP, will answer question 4.

The subject memo does not accurately represent W plants as currently configured.

Paragraph 3 of Bulletin 79-06A (April 13, 1979) required that the low pressurizer level logic be kept in the tripped condition.

fio one else used coincidence logic.

We are in the process of distributing the report to the industry; see the Enclosure from H. Faulkner.

70-

Enclosures:

D. F. Ross, Jr., Deputy Director As stated Division of Project Management I

cc:

R. DeYoung T. flovak fl. Moseley H. Faulkner l

J 8001170[Of f