ML19322C457

From kanterella
Jump to navigation Jump to search
Requests Rept on Recent Shutdown of Davis-Besse for Alleged Malfunction of Electromagnetic Pressure Relief Valve in Primary Reactor Loop
ML19322C457
Person / Time
Site: Crane, Davis Besse  Constellation icon.png
Issue date: 09/30/1977
From: Vartorella W
AFFILIATION NOT ASSIGNED
To:
NRC COMMISSION (OCM)
References
TASK-TF, TASK-TMR NUDOCS 8001170630
Download: ML19322C457 (1)


Text

.s

/

Sept. 30, 1977 39 South Street Berlin Hts., Ohio M81 i

DAVIS 98GSE.

s The Nuclear Regulatory Commission g p. g Washington, D.C.

~

Dear Sir v

As I am sure the Commission re, the recently constructed Davis-Besse Nuclear Powerf nt at Port Clinton has recently k:been-shut,down for_"at_ least_ two weeks '.',.as. result,,,of, an_,..,

alleged, malfunction 1of an electromagnetic: pressure-relief"1 valve in the prisary rhac6or ~leop.' ~ ~ "

~ ^ ~ " ~ ~ ~

It is the concern of our environmental action group, _The Firelands I'

, Coalition _for. Safe Energy, that the.public receive,af full' andj

'.acourat.e. account; off the J3 ncidentias) quickly2 asi the ; Nuclear ~ ~~~~'

Regulatory Commission can, prepare.such aidocument.

If our information is correct, the Commission has already dispatched l

an inspector from its Glen Ellyn, Ill., regional office.

l I trust that a copy of the full Commission investigatory report j

will be released to both the public and the area, as well as national, news media.

As a designated spekesperson of the Firelands Coalition, I request that a copy oi' the report be sent to the coalition c/o

[

my home address; f

Thank you for your interest in this matter.

l Sincerely, LUNY l

t Wm. F. Vartorella, Ph.i l

i l

/

8 1170f3g

.