ML19322C336
| ML19322C336 | |
| Person / Time | |
|---|---|
| Site: | Rancho Seco, Crane |
| Issue date: | 03/30/1978 |
| From: | Eisenhut D Office of Nuclear Reactor Regulation |
| To: | Stello V Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML19322C337 | List: |
| References | |
| TASK-TF, TASK-TMR NUDOCS 8001160875 | |
| Download: ML19322C336 (1) | |
Text
/v t:UcLEAR R COMMISt,10N A !~.y,h [.
j, j
j W ASW NG TON, D. C. 2C555 E
I'GCH 3n%
{
MEMORANDUM FOR:
V. Stello, Jr.~ Acting Assistant Director d
for Operating Reactors ggg gg
}
Division of Operating Reactors NA(2.Cl4 SA NN i
FROM:
D. Eisenhut, Assistant Director
{
for Operational Technology
^
Division of Operating Reactors p m. ~ ~ _,~,
SUBJECT:
' RANCH 015EC0iNUCLEAR GENERATING STATION - EVALUATION 0F THE NSS C00LDOWN TRANSIENT - DOCKET 50-312 1
The Engineering Branch, Division of, Operating Reactors., has reviewed the information regarding thelMaFchT20.1978 ' reactor; trip;and r.esulting l
3 cooldown transient which is*pe'rtinent to ithe 'structuFallintegrity!of primary coolant system.
We als'o discussed tfiisTevsnt kithlI&Elper'sdnn'elt
~
~
and are, ass.ured that they[' hive ~ considefe'd a'nd/orjeviewed_other;pertin-y
' ~
~~
]
Lent; systems l ffi$oiclude tstlfitWiMiral~ damage has occurred to the primary coolar.t is ~s'tefa~which w5ul~d preclude future operation of the facility.
4 Attached is our safety evaluatio report.
i
,f k,i
(') $ b ((L i D. Eisenhut, Assistant Director for Operational Technology
Enclosure:
As stated Division of Operating Reactors g
cc:
L. C. Shao Fu J. P. Knight i
S. S. Pawlicki J. Guibert
[1 R. Cudlin jb W. Hazelton
- U R. Klecker il R. Reed b
J. Zwetzig
.g
=
Contact:
W. Hazelton 21 R. Klecker 49-28060 U
D
~
eo P7f gon x
]