ML19322C311

From kanterella
Jump to navigation Jump to search
Forwards Revised Instructions for Control of Steam Generator Level.W/O Encl
ML19322C311
Person / Time
Site: Crane, Davis Besse  
Issue date: 11/30/1978
From: Wandling G
BABCOCK & WILCOX CO.
To: Faist F
BABCOCK & WILCOX CO.
References
TASK-TF, TASK-TMR NSS-14-T.355, NUDOCS 8001160833
Download: ML19322C311 (1)


Text

. --

>ITE INSTR U,CTO.M No.

~ / 3C ' "' t THE BABC0CK & Wii.CL COMPANY lY UID POWER GENERATION GROUP IU To lF.R.Faist-ActingSOM I: P.st'ON5E REQ'D FRCSI e

..J J

~

From

.G. K. Wandling - Plant Startup Services Section

, %tyg ses m.s File No.

Cust.

TEC0 NSS-14/73.55 or Ref.

Suoj.

Revised Instructions for Control of Steam Generator Level Date November 33, 1973 lm.i.........,........................

Reference:

Site Instruction 14-323, dated 11/22/78.

Revised interim operating instructions (attached) have been developed that will permit TECO to contir.ue interim operation until adjustments to the steam generator level setpoint or other design changes can be permanently made. These revised instructions replace those originally transmitted in the referenced site instruction.

The attached instructions address recuired operator actions follcwing SFRCS actuation of the auxiliary feedwater only. No operator actions are requirec to modify ICS control of main feecwater (Case 2 of the Referenced Site Instruction).

TECO reviewed the attached instructions while in Lynenburg on 11/27/78 anc :ney concur that the operating instructions are adequate for interim safe operaticn.

Please fontard this information to the customer and contact me if there are any ques tions.

'GKW:NF Attachment ec:

W. H. Spangler*

H. A. Baker D. F. Hallman R. C. Luken*

E. W. Swanson*

E. A. Womack*

R. W. Winks

  • E. R. Kane J. R. Bohart T

n a les

  • w/o attachment

~ ' ' "

REVIEWED FCR ACCURACY ENGINEERING:, :.' /, _,,,. (

DW

....r,...

w c.;.u:

, c, g,,

pg35 pjj,,, p.

l V

l l

8001160[3 3

- - -