ML19322C222
| ML19322C222 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 03/03/1978 |
| From: | Boyd R Office of Nuclear Reactor Regulation |
| To: | Case E Office of Nuclear Reactor Regulation |
| References | |
| TASK-TF, TASK-TMR NUDOCS 8001160645 | |
| Download: ML19322C222 (2) | |
Text
F~
.a,;s q w vy' 4 % Q f % % %2 t-- s G E " u = w..
- 7 -wcf w
K;p&wy ;:
Ll qi1 % > E.7 T+-
~
w"!l
~ =
~ ~~ ~
l w.
.. C:- -.
w O
O M ac43, 9.
. J.i 1
om,<os...,
-'. s, O taucLEAll REGULATORY COMMisslO
/-
WASHINGT OrJ, D. C. 20555
--J v
gag 3 y;73 4
%,oaa../
.A
..y
~~
~
u.
.n 4.A MEMORANDUM FOR:
Edson G. Case, Chairman
~ *lj Technical Activities Steering Committee y.
...y FROM:
Roger S. Boyd, Director
.1, '.h Division of Project Management 54
.d
SUBJECT:
PROPOSED TECHNICAL ACTIVITY
.-4 g.-2 t
~b Enclosed for consideration by the TASC is an additional proposed l
- .'+
Category 8 technical activity.
This proposal results from a lingering concern of the ACRS, most recently expressed in a letter from the Committee dated January 18, 1978.
1
)
The Committee is concerned that in the event of a loss of off-site power
..j i
at some time subsequent to a LOCA, the core could be deprived of cooling f3 for that period of time required to transfer the pumps from the off-
.j site power to the diesel generators.
,4 L :.:
raga m
---1 Roger S. Boyd, Director Division of Project Manageme
,]
Enclosure:
As stated
.n cc:
H. Denton R. Mattson V. Stello M. Aycock W. Minners D. Wigginton L. Crocker c'
\\
.o L
i I
?
8001160 I
l
~ ~ _....... _ - -. - -..
f
y m er;
(
= - --- =~mY.
L A
UI I o u w
/
i
,, / ~
,..[
~~
TECHil! CAL ACTIVITY q
g Short
Title:
Loss of Of f-Site Power Subsequent to LOCA r,Q This is an ACRS concern, it pertains to the effects
/
DescQption:
on the core that could result from a loss of off-
.q i.Lq site power subsequent to a LOCA.
Even though SIS
,gj reset controls are such that a loss of off-site power following a LOCA would result in diesel engine m.{
generator start and pick-up of ESF loads, there
,*'h.
still remains the question as to the effect on the core during the period of time between the loss of f
the off-site power and the pick-up of ECCS pump loads by the diesels.
If the loss of of f-site jf power were to occur at the end of blowdown, just as
~J4 4
the ECCS pumps are supposed to start, the core 3!ji could be lef t without cooling water for an addi-
,-ji tional period of time beyond that examined in our 1'!
N:jl J
analyses.
What is needed is an analysis th:t shows that we need not consider such an event because it is of sufficiently low probability or it does not
'f 4
lead to unacceptable consequences, or we need to 7!
come up with some sort of desi,gn fix to assure that i ':! e a
such an event cannot take place.
4 1
Priori ty:
Category B.
1 3
Justification:
This is an extension of the concern described in
.f i
Issue flo. 4 of flVREG-0138.
The ACRS letter of 4
December 12, 1976, which addressed the issues dis-
.e !
cussed in fiUREG-0138, indicated general satisfaction w
1 with the staff position regarding control of SIS 3
reset, except for this question.
In the view of v.
the ACRS, the loss of off-site power following a 3
LOCA would require some time for the pump leids to be transfered to the diesel generators, and this n~
loss of pumps had not been examined by the staff.
'e A copy of the ACRS comments is enclosed.
s.-
Lead Division:
055.
t J
Manpower Requirement:
Estimated 3 man months.
Technical Assistance I
Funds or RES Support:
flone.