Forwards List of Addl Commitments to short-term Requirements of TMI Lessons Learned Task Force.Commitments Include Relief & Safety Valve Tests,Installation of Relief Valve Position Indication & Containment Isolation Changes
ML19322A940
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 11/21/1979
From: Schmieder J
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To: Ippolito T
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0578, RTR-NUREG-578 JPN-79-75, NUDOCS 7911280277
Download: ML19322A940 (3)


Text

. - - - --

=

.e4 POWER i :.. 3 RITY OF THE STATE OF N 2'// orb to C.

2 m..* Cinct.c NEW Y. W. N. Y.

  • 00
  • 9 a

t ;'12 314 7 6 2 Cr".

DERRY

' EC R G.E *

  • ns,.*ECS e t t et s' 4 c.* --

cetestf%s O'*P JO H f OfSON J7 g

h.;* '

  1. .[f J O M N V4, 3'3STON O

A 1

syt:v?:ve vrCr 4

,N G A.. $

h c..,,,,,e &. 7..# f C O.A.

G E C fs

.w N

j y *. s..., O

.,.V.

_ ~..

s 'e. H v FLYNN Q v

. OS E"M M. 5.CH W l E f R i

s-rFCCWV VE V'CT

/

908

. V'bbO N Z1 O'

~

~

,I g"g,

S r R e..

4 eta n ni Noirea Ser 21, 1979 ernos.. smeta m 4

v JU L

Q JP'l-79-75 T'2.*, ES,.E. ^'

er.--

  • "* C V A.9..Re

.,'t EY o,,e F

cc Director of Nucl-a. 'aactor Reg'.rlations

8). S. Nuclear Rega) J t ary Commission Washington, D.

C l'

54 F. c..'.. s A. Ippolito, Chief Attention:

Mr. ':

7eactors Branch No. 3 4

Oper.a t. i i D i / :a...

_.2 Operating Reacters

]

4

.2

'ubject:

James s.7. Patrick Nuclear Power Plent I

Docket...

50-333 I

Short iga ',acuirements of TXI Lessons Learned

References:

(1)

.ter, Darrell G. Eisenhut (NRC) to All

...vating Nuclear Power Plants datad j

,: eember 13, 1979 (2) ter, Paul J. Early (PASSY) to Darrell G.

~

..d n.1ut (NPC) dated October 22, l??

(3)

...er, Harc1d R. Denton (NRC) to All t.

rating Nuclear Power Plc.nts dated 0 r..ber 30, 1979

.ter, Darrell G.

Eisenhut (NRC) to Thomas D.

(4)

. aan (Chairman BWR Cwner? Jroup) dated

, ember 14, 1979

?nar Sir:

Enclosed as r* Nhment 1 to this letter are commitments beyond those p o 1.'..i in our letter of October :'2, 1979 (Ref. 2).

are provided based upon clarification of These commi.

..;v NRC requirements ca n were provided in Reference 3 to the Authority; it' Reference.4 t.

t i l'.MR Ownert Grouo; _and in a tel:ohone con-versetion with >

  • ovember 14, 197?.

Very tru,1y yours,

/

.i J.Re Schmieder

(

Executice Vice President 9:

and Chief Engineer 7911280 2-N

.a ATTACHMENT 1 L

l Ad... timnal Commitments Related to Th ;; tile Island Lessons Learned cp c,

D D<I

,i JL es s

!fety Valve Tests 0

l[

2.1.2 Relief.. a U

The Authority wit:

.wport the BWR Owner's Groug <n.&Jrts t determine test c..:. tons and undertake the required testing for relief valve. an.a generic basis.

It is expected that the NRC required sch..ui}

dates will be net.

2.1.3a Relief aj.c Position Indication The Authority wi.1 L.atall a relief valve position indication capability by Jac..iar.

1, 1980.

If equipment availability i

problems should which will prevent this implementation, the NRC will be ;? r..eied and as soon as the equipment is avail-c.s talled.

}

a.21e, they will 2.1.4 Contain:..v.c Isolation 1

Any containment soiation system changes determined necessary by the Authority

1. view will be scheduled for completion by 4

j January 1, 1980, cult icct to material availability.

1 2.1.3a Dedicate,[g3 Control Penetrations

'1

{

nny changes to t.a f a t Patrick Plant Purge System required as a result of the i.ati.ority's review will be scheduled for com-1 pletion by Janua;y 1331.

a Plant Sit..'J.ing Review 2.1.6b t

The Authority wit 4 csmplete the plant shielding design review

.d will provide results to'the NRC shortly by January 1, 19..d o

l thereafter.

Pla.: cotelding modification will be scheduled i

for completion b, January-1, 1931.

More definitive: schedules I

will be providec 8:acr.

4 1

2.1.8a Post Acilaent Samplinc 1

The Authority wi.t 3 rplete the pest-cccident' sampling design l

2 review, descript'an'af proposed modifications and necessary r' visions to pla.: !.rr, edures by^ January 1,-1980 and will-pro-e vide results to m.

ortly th:reafter.

Plan: nodification will-be schedulc to.

ompletion by January 1, 1981.

More I

definitive sched.t_a i:211 be provided later.

. 2. 2. lb' Shift ~.. it.. ii;a l Advisor The Authority wi',./ ovide an shift technical adviser as required by Janu. "' i, 1980.

2.2.2b Onsite gtgical Support Center

>t :FIC requirements as cicrified in the The Authority wi October 30, 1979 etter, within the schef.:le required.

A long range plan t.~

..i. grading the Technical Support Center will be provided in U ci.. u.., 1990.