ML19322A940
| ML19322A940 | |
| Person / Time | |
|---|---|
| Site: | FitzPatrick |
| Issue date: | 11/21/1979 |
| From: | Schmieder J POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK |
| To: | Ippolito T Office of Nuclear Reactor Regulation |
| References | |
| RTR-NUREG-0578, RTR-NUREG-578 JPN-79-75, NUDOCS 7911280277 | |
| Download: ML19322A940 (3) | |
Text
. - - - --
=
.e4 POWER i :.. 3 RITY OF THE STATE OF N 2'// orb to C.
2 m..* Cinct.c NEW Y. W. N. Y.
- 00
- 9 a
t ;'12 314 7 6 2 Cr".
DERRY
' EC R G.E *
- ns,.*ECS e t t et s' 4 c.* --
cetestf%s O'*P JO H f OfSON J7 g
h.;* '
- .[f J O M N V4, 3'3STON O
A 1
syt:v?:ve vrCr 4
,N G A.. $
h c..,,,,,e &. 7..# f C O.A.
G E C fs
.w N
j y *. s..., O
.,.V.
_ ~..
s 'e. H v FLYNN Q v
. OS E"M M. 5.CH W l E f R i
s-rFCCWV VE V'CT
/
908
. V'bbO N Z1 O'
~
~
,I g"g,
S r R e..
4 eta n ni Noirea Ser 21, 1979 ernos.. smeta m 4
v JU L
Q JP'l-79-75 T'2.*, ES,.E. ^'
er.--
- "* C V A.9..Re
.,'t EY o,,e F
cc Director of Nucl-a. 'aactor Reg'.rlations
- 8). S. Nuclear Rega) J t ary Commission Washington, D.
C l'
54 F. c..'.. s A. Ippolito, Chief Attention:
Mr. ':
7eactors Branch No. 3 4
Oper.a t. i i D i / :a...
_.2 Operating Reacters
]
4
.2
'ubject:
James s.7. Patrick Nuclear Power Plent I
Docket...
50-333 I
Short iga ',acuirements of TXI Lessons Learned
References:
(1)
.ter, Darrell G. Eisenhut (NRC) to All
...vating Nuclear Power Plants datad j
,: eember 13, 1979 (2) ter, Paul J. Early (PASSY) to Darrell G.
~
..d n.1ut (NPC) dated October 22, l??
(3)
...er, Harc1d R. Denton (NRC) to All t.
rating Nuclear Power Plc.nts dated 0 r..ber 30, 1979
.ter, Darrell G.
Eisenhut (NRC) to Thomas D.
(4)
- . aan (Chairman BWR Cwner? Jroup) dated
, ember 14, 1979
?nar Sir:
Enclosed as r* Nhment 1 to this letter are commitments beyond those p o 1.'..i in our letter of October :'2, 1979 (Ref. 2).
are provided based upon clarification of These commi.
..;v NRC requirements ca n were provided in Reference 3 to the Authority; it' Reference.4 t.
t i l'.MR Ownert Grouo; _and in a tel:ohone con-versetion with >
- ovember 14, 197?.
Very tru,1y yours,
/
.i J.Re Schmieder
(
Executice Vice President 9:
and Chief Engineer 7911280 2-N
.a ATTACHMENT 1 L
l Ad... timnal Commitments Related to Th ;; tile Island Lessons Learned cp c,
D D<I
,i JL es s
- !fety Valve Tests 0
l[
2.1.2 Relief.. a U
The Authority wit:
.wport the BWR Owner's Groug <n.&Jrts t determine test c..:. tons and undertake the required testing for relief valve. an.a generic basis.
It is expected that the NRC required sch..ui}
dates will be net.
2.1.3a Relief aj.c Position Indication The Authority wi.1 L.atall a relief valve position indication capability by Jac..iar.
1, 1980.
If equipment availability i
problems should which will prevent this implementation, the NRC will be ;? r..eied and as soon as the equipment is avail-c.s talled.
}
a.21e, they will 2.1.4 Contain:..v.c Isolation 1
Any containment soiation system changes determined necessary by the Authority
- 1. view will be scheduled for completion by 4
j January 1, 1980, cult icct to material availability.
1 2.1.3a Dedicate,[g3 Control Penetrations
'1
{
nny changes to t.a f a t Patrick Plant Purge System required as a result of the i.ati.ority's review will be scheduled for com-1 pletion by Janua;y 1331.
a Plant Sit..'J.ing Review 2.1.6b t
The Authority wit 4 csmplete the plant shielding design review
.d will provide results to'the NRC shortly by January 1, 19..d o
l thereafter.
Pla.: cotelding modification will be scheduled i
for completion b, January-1, 1931.
More definitive: schedules I
will be providec 8:acr.
4 1
2.1.8a Post Acilaent Samplinc 1
The Authority wi.t 3 rplete the pest-cccident' sampling design l
2 review, descript'an'af proposed modifications and necessary r' visions to pla.: !.rr, edures by^ January 1,-1980 and will-pro-e vide results to m.
ortly th:reafter.
Plan: nodification will-be schedulc to.
- ompletion by January 1, 1981.
More I
definitive sched.t_a i:211 be provided later.
. 2. 2. lb' Shift ~.. it.. ii;a l Advisor The Authority wi',./ ovide an shift technical adviser as required by Janu. "' i, 1980.
2.2.2b Onsite gtgical Support Center
>t :FIC requirements as cicrified in the The Authority wi October 30, 1979 etter, within the schef.:le required.
A long range plan t.~
..i. grading the Technical Support Center will be provided in U ci.. u.., 1990.
D D
v o
JU n
D ~9~T d)_k a
v se a
.