Abnormal Occurrence 74-12:on 740625,high Pressure Injection Valve MU-V16A Failed to Open on Signal from Control Room Console Pushbutton.Valve MU-V16B Opened & Pressurizer Level Restored.Cause Under Investigation
ML19322A441
Person / Time
Site: Crane 
Issue date: 06/26/1974
From: Herbein J
METROPOLITAN EDISON CO.
To:
References
NUDOCS 7910250602
Download: ML19322A441 (2)


Text

O O

-E.TCCPOLITAN EDISON COMPANY svawmor

/

x ou c mCE DOX 4eo MDDLE OWN, PENNSYLVANIA 17057 htEPHONE 717&t-4041 June 26, 1974 Mr. J.P. O'Reilly, Director Directorate of Regulatory e

I,D1 9-a jlj

_ )] _ [T, Region I 631 Park Avenue 3

King of Prussic, Pa. 19405 Operating License DPR-50 Dacket 50-289

Subject:

Abnorral Occurrence Ho. A0 74-12 Detr Hr. 0?P.cilly:

ThistelegranistoconfirmtheteleconbetweenLeeSpessard(RegionI-AEC),

and J.G. lierbein (114I-Superintendent) at 0330 HRS. 25 Juna 1974.

The following report is submitted in accordance with paragraph 6.7.2.a.4 (page 6-11) of the Technical Specifications.

On 25 June High Pressure Injection Valve !U-V16A, failed to open on signal from the control room console push-button.

While in the process of restoring the plant to nonral hot shutdown conditions, following the loss of off-site paner test, additional cake-up water from the make-up tank was needed to raise pressurizer level from 85" to 100".

'In order to raise pressurizer level, the High Pressure Infection Valve essociated with the operating 1A cate-up ptap (fU-Vl6A), was signaled to open by use of the control room console mnual push-button. The valve failed'to open.

When l"J-VlGA failed to open, !?J-V16B was imediately opened and ' pressurizer level was restored to 103".

~ Redundant High Pressure Injectiott Valves (ID-V16C and D) were subsequently tested satisfactorily.

/

"'![

hb 7910258h I

i f

I

O

~

O

sj '16A was opened using the local lic.itorque hand whol. 17J-V16A was then t

se:.essfully opened c closed seve.al times using tl

ontrol roca console ranu:1 push-button to operate the valve rotor.

An investigation is being conducted to detemine the cause of FU-V16A's failure

~

to open on signal.

Very truly yours, 4(# //u.,A.& n

'~

.p p n 2 J.G.lierbein Station Superintendent THI fluclear Station JG!!/dr.n laA p q,g