RO 76-9/1P:on 760221,makeup Pump a Failed Due to Closure of Suction Cross Connect Valve During Operation.Pump Operation Procedures to Be Changed,Allowing Tests Using B & C Makeup Pumps
Date released: 12/02/2019 Download: ML19322A432


RO 76-10/1P:on 760221,during Emergency Sequence & Power Transfer Test,Breaker for B Diesel Generator Failed to Close Due to Incorrect Standby Limit Setting.Governor Adjusted on Diesel & Tests Completed
ML19322A433
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 02/22/1976
From: Colitz J
METROPOLITAN EDISON CO.
To:
References
Download: ML19322A433 (2)
RO 76-9/1P:on 760221,makeup Pump a Failed Due to Closure of Suction Cross Connect Valve During Operation.Pump Operation Procedures to Be Changed,Allowing Tests Using B & C Makeup Pumps
ML19322A431
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 02/22/1976
From: Colitz J
METROPOLITAN EDISON CO.
To:
References
Download: ML19322A431 (2)