ML19322A274

From kanterella
Jump to navigation Jump to search
Forwards LER 79-003/03L-0
Date released: 12/02/2019 Download: ML19322A274


LER 79-003/03L-0 on 790217:during post-shutdown Operations, While Performing Emergency Sequence & Power Transfer Test, High Pressure Injection Pump MU-P-1C Tripped on Overload. Caused by Failed Lead Between Winding & Motor.Lead Repaired
ML19322A275
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 03/09/1979
From:
METROPOLITAN EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML19322A275 (1)
Forwards LER 79-003/03L-0
ML19322A273
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 03/09/1979
From: Lawyer L
METROPOLITAN EDISON CO.
To: GRIER B H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML19322A273 (1)