ML19322A263

From kanterella
Jump to navigation Jump to search
Informs NRC That If Refueling Outage Proceeds as Planned, Unit Will Return to Power on 790314 Despite Earlier Expectation of Possible Six Week Outage
ML19322A263
Person / Time
Site: Crane Constellation icon.png
Issue date: 03/01/1979
From: Herbein J
METROPOLITAN EDISON CO.
To: Reid R
Office of Nuclear Reactor Regulation
References
GQL-0237, GQL-237, NUDOCS 7903070324
Download: ML19322A263 (1)


Text

7 l

..c,

?.

n

_as,

/

METROPOLITAN EDISON COMPANY suesom v or cm w rococ um ins commmov,/

POST OFFICE BOX 542 RE ADING, PENNSYLVANI A 19603 TELEPHONE 215 - 929-3601 March 1, 1979 GQL 0237 Director of Iluelear Reactor Pegulation Attn:

R. W. Heid, Chief Operating Reactors Branch Ilo. 4 U.S. Iluelear Regulatory Commission Washington, D.C. 20555

Dear Sir:

Three Mile Island Nuclear Station, Unit 1 (TMI-1)

Operating Licence No. DPR-50 Docket No. 50-289 Metropolitan Edison Company informed the Pennsylvania, New Jersey, Maryland (PJM) Interchange Syotem and the Pennsylvania Public Utility Commission (PaPUC) that TMI-l would be off line for six weeks, and the Monthly Operating Deport for January also indicated a six week refueling outa6e. This expected caration includes some time for unexpected delays which often occur during outages.

However, if the outage proceeds as planned, TMI-l will be returning to power on March lb, 1979 Met-Ed will inform the NRC of any changes to the March lb, 1979 startup as they occur.

Sincerely,

/

/

J. G.

ferbein j

i Vice President-Generation JGH:DGM:djh

\\

\\

790307032'-!

9 i