ML19322A245
| ML19322A245 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 02/07/1979 |
| From: | Herbein J METROPOLITAN EDISON CO. |
| To: | Reid R Office of Nuclear Reactor Regulation |
| References | |
| GQL-0179, GQL-179, NUDOCS 7902130129 | |
| Download: ML19322A245 (1) | |
Text
_. _ _.. _ _ _
c.
=,,
/
METROPOLITAN EDISON COMPANY
/
w
.m 2n 2ein POST OFFICE BOX 542 READING, PENNSYLVANIA 19603 TELEPHONE 215 - 920 3601 February 7,1979 GQL 0179 Director of Nuclear Reactor Regulation Attn; R. W. Reid, Chief Operating Reactors Branch No. 4 U.S. Nuclear Regulatory Commission Washington, D.C.
20555
Dear Sir:
Three
- file Island Nuclear Station, Unit 1 (TMI-1)
Operating License No. DPR-50 Docket No. 50-289 Fire Protection Program Certain modifications described in the TMI-1 Fire Protection Safety Evaluation Report (FPSER) are marked with an asterisk to indicate that design information is required by the NRC staf f to ensure that the design is acceptable.
During
(
recent telecons with Mr. G. B. Zwetzig of your staff, it was indicated that unless design details were specifically required as indicated by the asterisk, Met-Ed was not to subnit designs for approval. Rather, the acceptability of
[
unmarked fire protection modification desis;ns shall be determined by Met-Ed's Fire Protection Engineer. Therefore, contrary to our letter of October 5, 1978 (GQL 1593), the design of hose stations to be installed at various locations in the plant will not be submitted for NRC approval on February 16, 1979, since FPSER Item 3.1.2, Manual Hose Stations,does not bear an asterisk.
However, Met-Ed may from time to time submit designs for unmarked items for your information.
S ince re ly,
J. G. Herbein Vice President-Generation JGH;WSS:tas h
S 790213 o/M 1ll 6
i