Bessemer'S Work to Replace Shafts That Drive Engine Speed Control Governor & Engine Over Speed Shutdown Governor Has Not Been Completed.Final Significant Deficiency Rept 6 Will Be Submitted by 790831
ML19322A148
Person / Time
Site: Waterford Entergy icon.png
Issue date: 12/29/1978
From: Aswell D
LOUISIANA POWER & LIGHT CO.
To: Seyfrit K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
LPL-10343, NUDOCS 7901030053
Download: ML19322A148 (2)


Text

. ..

.- muu OUISMNA 242 notAnoNot s,nccr

+ (504) 3GG 2345 M P O W E R & L I G H T! P O BOX G000

  • NEW ORLEANS. tOUISIANA 70174 b?sN!!O?N$U]s D L. ASWELL Deeember 29, 1978 y,,p,,,,,,,,3,,p,,,,,,,,

/'- LPL 10343 Q-3-A35.07.06 3-A1.' 01. 04 4

'Mr. K.V. Seyfrit, Director, Region IV U.S. Nuclear Regulatory Commission Office of Inspection and Enforcement 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76012

SUBJECT:

Waterford SES Unit 3 Docket No. 50-382

, Status of Significant Construction Deficiency No. 6 " Emergency Diesel Generators - Defective Shafts and Springs"

REFERENCE:

LPL letter 9381 dated August 17, 1978

Dear Mr. Seyf rit:

As stated in the referenced letter, corrective action to replace the shaf ts which drive the engine speed control governor and engine overspeed shutdown g,overnor was scheduled to be completed by September 30, 1978. Cooper-Bessemer has advised us that it would be beneficial to delay replacing the shafts and springs until they replace the inlet and exhaust valve crosshead assemblics required by Significant Deficiency Report No.10 (ref. LPL 10233 to K.V. Seyfrit dated December 5,1978). In this way all the modifications could be done at once. This request by Cooper-Bessemer is acceptable for Waterford 3 based on our construction needs.

For your information and based on discussions with Cooper-Bessemer personnel, it is our understanding that work to replace the subject shafts and springs has not been completed at any other location.

As discussed with your personnel, we will now submit the final report for Significant Deficiency No. 6 by August 31, 1979; the same date as has been committed for Significant Deficiency No. 10.

j A 7901030o53 S

.- ~ --- - . - -. - . . . . . .-.

-0' .

- Mr. K.V. Seyf rit 2 December 29, 1978 t

Yours very truly,-

D.L. Aswell 4

DLA/TFG/ys is.

Enclosure

~

cc: 1) ' Director

- l Office of Inspection and Enforcement U.S.' Nuclear Regulatory Commission Washington, D.C. 20555

-(with 15 copies of report)

2) Director Office of Management Information and Program Control U.S. Nuclear Regulatory Commission Washington, D.C. 20555 (with one copy.of report) 1 I