Independent Spent Fuel Storage Installation (Isfsi), Submittal of Cask Registration for Spent Fuel
ML19322A104
Person / Time
Site: Millstone, 07201004  Dominion icon.png
Issue date: 10/31/2019
From: Daugherty J
Dominion Energy Nuclear Connecticut
To:
Document Control Desk, Division of Fuel Management
References
19-428
Download: ML19322A104 (2)


Text

D0mm1on Energy Nuclear Connecticut, Inc Rt 156, Rope Ferry Road, Waterford, CT 06385 D0mm1onEnergy com Attention: Document Control Desk OCT 3 1 2119 Director, Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 DOMINION ENERGY NUCLEAR CONNECTICUT, INC.

MILLSTONE POWER STATION UNIT 3 Serial No.

NSSL/TFO Docket Nos.

License No.

INDEPENDENT SPENT FUEL STORAGE INSTALLATION {ISFSI)

SUBMITTAL OF CASK REGISTRATION FOR SPENT FUEL STORAGE 19-428 72-47

? l-ll>b'/-

50-423 NPF-49 Pursuant to 10 CFR 72.212, "Conditions of general license issued under §72.210,"

paragraph (b )(2), Dominion Energy Nuclear Connecticut, Inc. (DENG) hereby provides the Nuclear Regulatory Commission (NRG) notification regarding the registration of spent fuel storage casks approved under NRG Certificate of Compliance No. 1004. The required registration information is submitted within 30 days of loading. The information required per 10 CFR 72.212(b)(2) is provided as follows:

Licensee Name:

Licensee Address:

Reactor License No.:

Reactor Docket No.:

Cask Certificate No.:

Cask Model No.:

Cask Identification Nos.:

MPS 32PT-L 125-A224-HZ038 MPS 32PT-L 125-A224-HZ039 Dominion Energy Nuclear Connecticut, Inc.

314 Rope Ferry Road Waterford, CT 06385 NPF-49 50-423 1004 NUHOMS-32PT DSC Canister Initial Use: October 12, 2019 Initial Use: October 18, 2019 The casks were placed in service under Amendment 15 of Certificate of Compliance No. 1004.

Should there be any questions regarding this submittal, or additional information required regarding spent fuel storage under the general license requirements of 10 CFR 72 Subpart K, please contact Mr. Jeffry Langan, Manager Station Licensing, at (860) 444-5544.

1 Sincerely, John

. Daugherty Site Vice President - Millstone Commitments made in this letter: None

/JH 5,S-ZD

Jf15S7-~

µf155

I fl I{

cc:

U.S. Nuclear Regulatory Commission Region I 2100 Renaissance Blvd Suite 100 King of Prussia, PA 19406-2713 T. H. Carter NRC Senior Project Manager Millstone Unit 1 U.S. Nuclear Regulatory Commission Two White Flint North, Mail Stop T-8F8 11545 Rockville Pike Rockville, MD 20852-2738 R. V. Guzman NRC Senior Project Manager Millstone Units 2 and 3 U.S. Nuclear Regulatory Commission One White Flint North, Mail Stop 08 C-2 11555 Rockville Pike Rockville, MD 20852-2738 NRC Senior Resident Inspector Millstone Power Station Serial No.19-428 Docket Nos. 72-47/50-423 Page 2 of 2