ML19321A535
| ML19321A535 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 07/17/1980 |
| From: | Clayton F ALABAMA POWER CO. |
| To: | Eisenhut D Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8007230567 | |
| Download: ML19321A535 (1) | |
Text
Alabama Power Company 600 North 18th Street vost Office Box 2641 Birmingharr. Alatama 35291
. Telephone 205 323-5341 m
F. L. CLAYTON, JR.
Al L Senior Vice President AIOUONO bWOf July 17, 1980 the scornem electre system Docket No. 50-364 Director Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Waratington, D.C.
20555 Attention:
Mr. D. G. Eisenhut RE: Joseph M. Farley Nuclear Plant - Unit 2 Request for Low Power Operating License Gentlemen:
Pursuant to the requirements delineated in the attachment to your letter of June 26, 1980, titled, "Further Commission Guidance for Power Reactor Operating Licenses", Alabama Power Company hereby requests the operating license with limited authorization for its Joseph M. Farley Nuclear Plant - Unit 2 by September 1, 1980. The limited authorization requested by this date includes fuel loading, low power testing, and power operations up to 5 percent of rated thermal power. Accordingly, Alabama Power Company, by September 1, 1980, will address those TMI-related require-ments and actions of NUREG-0694 contained in Category (1) of Commission's Statement of Policy document.
It is requested that your licensing review be planned to support an operating license for fuel loading, low power testing and power operations up to 5 percent of rated thermal power by September 1,1980 and an operating license for full power operations by December 1, 1980.
If you have any questions, please advise.
Very truly yours,
.;f;,
1 P
K f 4Aph F. L. Clayton, Jr.
FLCJr/0DK:aw cc:
Mr. R. A. Thomas Mr. G. F. Trowbridge Mr. L. L. Kintner
\\9 h Mr. Ed Reeves Mr. W. H. Bradford
\\
8007230 % 7' A